Minesites Directory

Browse minesites. Each card shows company ownership and their most recent associated articles.

Filter by mine details and commodity attributes.
Page 46 of 147 (3508 total)
Roy Hill Iron Ore

Western Australia, Australia · Open Pit

Operating
Iron Ore
Commodities, grades and output
YearCommodityAv. GradeOutput
2025Iron Ore-61.6 Mt
2024Iron Ore-64 Mt
Opened
2015-01-01
End year
2034
Autonomous haulage
Yes
Workforce
2,800
Overview
The Roy Hill Iron Ore Mine is an open pit operation in Western Australia, producing iron ore. It has a wet processing plant and an integrated operation including mine, rail, and a port facility at Port Hedland.
Production
Production overview - 2025: iron ore 61.6 Mt; 2024: iron ore 64 Mt.
Processing
The mine has a 55 million tonnes per annum (Mtpa) wet processing plant. The process involves conventional crushing and screening to separate lump and fines. A wet high-intensity magnetic separation (WHIMS) plant was added to recover fine iron particles from wet tailings, increasing the export capacity to 60 Mtpa. The integrated operations include the mine, rail, and a purpose-built two-berth port facility at Port Hedland for receiving, stockpiling, screening, and exporting lump and fines.
Equipment
The autonomous haul truck fleet includes 54 Caterpillar 793F trucks and 24 Hitachi EH5000 trucks. An additional 18 Hitachi EH4000 trucks were also noted as part of the fleet. The conversion of 78 haul trucks to a fully driverless autonomous haulage system (AHS) is being managed by Epiroc and ASI Mining. The mine also utilises a 344 km heavy haul railway.
Companies & ownership
  • Perenti Limited
    ASX:PRN
Rosemont

Western Australia, Australia · Underground

Operating
Gold
Opened
2013-01-01
Workforce
approximately 40 staff
Processing
Ore from the Rosemont underground mine is processed at a crushing and grinding circuit at the Rosemont site, which has a capacity of 1.5 million tonnes per annum. The ore is then pumped as a slurry via a 10-kilometre pipeline to the Garden Well processing plant for leaching and gold recovery through a carbon-in-leach (CIL) circuit.
Expansion
Regis Resources is currently developing the Rosemont Stage 3 extension, which is located south of the existing underground operations and will extend mining to a depth of 700 metres below the surface. This extension has a mining inventory of 1.7 million tonnes at a grade of 2.8 g/t for 157,000 ounces of contained gold, which includes a Probable Ore Reserve of 490,000 tonnes at 2.6 g/t for 41,000 ounces of gold. The Rosemont Stage 3 is expected to have an annualised gold production target of 40,000 to 50,000 ounces. The scheduled underground ore mining rate for this extension is up to approximately 600,000 tonnes per annum.
Companies & ownership
  • Perenti Limited
    ASX:PRN
Red Chris Mine

British Columbia, Canada · Open Pit

Operating
CopperGold
Commodities, grades and output
YearCommodityAv. GradeOutput
2025Copper0.589 %93101213 lbs
2025Gold0.562 g/t92429 oz
2024Copper0.516 %85320618 lbs
2024Gold0.367 g/t59811 oz
2023Copper0.356 %57051467 lbs
2023Gold0.295 g/t46046 oz
2022Copper-67604485 lbs
2022Gold-63658 oz
2020Copper-88300000 lbs
2020Gold-73787 oz
Opened
2015-01-01
End year
2028
Mine life
13 years
Capex (est.)
USD 3.00B
Workforce
Approximately 750 operational employees, 50 project employees, and 220 Tahltan employees (as of end 2024).
Overview
Red Chris Mine is an operating open pit mine in British Columbia, Canada, currently transitioning to an underground block cave operation. It produces copper, gold, and silver. The mine is owned 70% by Newmont Corporation (operator) and 30% by Imperial Metals Corporation.
Production
Production overview - 2025: copper 93101213 lbs, gold 92429 oz; 2024: copper 85320618 lbs, gold 59811 oz.
Processing
The plant uses conventional crushing, grinding and flotation to produce a gold-copper concentrate. The circuit includes a semi-autogenous mill, a ball mill, and a pebble crusher. Concentrate is trucked to the Port of Stewart for shipment to smelters.
Equipment
Conventional truck and shovel fleet, including a P&H 2800 electric cable shovel and Caterpillar 793 haul trucks.
Expansion
The mine is undergoing a major expansion to transition from open-pit to an underground block cave operation. The project has a projected capital cost of C$2.6 billion to $3 billion. The expansion is being fast-tracked through the federal government's Major Projects Office and is forecast to create up to 1,800 construction jobs. A feasibility study for the block cave is expected to be completed in the second half of 2026. Perenti subsidiary Barminco was awarded a contract extension for the development of the underground exploration decline.
Companies & ownership
  • Perenti Limited
    ASX:PRN
Obuasi Gold Mine

Ashanti region, Ghana · Underground

Operating
Gold
Commodities, grades and output
YearCommodityAv. GradeOutput
2024Gold5.35 g/t221000 oz
2023Gold5.45 g/t224000 oz
2022Gold6.32 g/t250000 oz
2021Gold6.44 g/t108000 oz
Opened
1897-01-01
End year
2037
Mine life
20 years
Workforce
5,595 (2024 average total employees)
Overview
The mine underwent a redevelopment project from late 2018 to late 2024, increasing capacity to 5,000 tonnes per day. It has a 2.4 million tonnes per annum processing plant.
Production
Production overview - 2024: gold 221000 oz; 2023: gold 224000 oz.
Processing
The mine has a 2.4 million tonnes per annum processing plant which uses flotation and bacterial oxidation (BIOX).
Equipment
The mine utilises shafts and a single access decline for main access to the underground operations. Existing infrastructure includes hoisting shafts.
Expansion
The Obuasi redevelopment project began in late 2018. Phase 1 and 2 of the redevelopment project were completed by mid-2022, bringing capacity to 4,000 tonnes per day. Phase 3, which was completed at the end of 2024, is to develop infrastructure to support a planned ramp-up in production to 5,000 tonnes per day. A hybrid mining approach using sub-level open stopes and underhand drift and fill was adopted in 2024 due to difficult ground conditions in high-grade areas. Perenti, through its joint venture, secured a five-year contract extension for underground mining services, commencing on 1 February 2025.
Companies & ownership
  • Perenti Limited
    ASX:PRN
Nova-Bollinger

Western Australia, Australia · Underground

Operating
NickelCopperCobalt
Commodities, grades and output
YearCommodityAv. GradeOutput
2025Nickel-16371 t
2025Copper-7324 t
2025Cobalt-581 t
2024Nickel-20806 t
2024Copper-9922 t
2024Cobalt-735 t
2023Nickel-22915 t
2023Copper-10266 t
2023Cobalt-803 t
2022Nickel1.85 %26675 t
2022Copper0.75 %11483 t
2022Cobalt0.07 %982 t
End year
2026
Overview
The Nova-Bollinger mine, officially known as the Nova Operation, is a wholly-owned subsidiary of IGO Limited. It is located in the Fraser Range of Western Australia, approximately 160 kilometres east-northeast of Norseman. The Ngadju People are the Traditional Owners of the land where the mine is situated. Commercial production at the underground mine commenced in July 2017. The operation is scheduled to reach its end of life by late 2026, with IGO planning to transition from operations directly into mine closure. A final Mine Closure Plan is anticipated to be submitted to the Western Australian government in mid-2026. The mine consists of two orebodies, Nova and Bollinger, which are now recognised as a single continuous deposit.
Production
Production overview - 2025: nickel 16371 t, copper 7324 t, cobalt 581 t; 2024: nickel 20806 t, copper 9922 t, cobalt 735 t.
Processing
processing plant on-site produces separate nickel and copper concentrates through a differential flotation circuit.
Equipment
underground sub-level open stoping (SLOS) and room-and-pillar mining methods; processing plant; Barminco (subsidiary of Perenti Global) provides mining and underground development services.
Companies & ownership
  • Perenti Limited
    ASX:PRN
NickelWest (Leinster Nickel Mine)

Western Australia, Australia · Underground

Operating
Nickel
Companies & ownership
  • Perenti Limited
    ASX:PRN
New Holland

Western Australia, Australia · Underground

Operating
Gold
Workforce
Barminco employs over 300 people at the Agnew site.
Overview
The New Holland mine is an active underground gold operation in Western Australia, part of the Agnew Gold Mine complex. Perenti, through its subsidiary Barminco, provides underground mining services under contract.
Production
In FY2022, the Agnew operation (Waroonga and New Holland) produced 232,000 oz of gold, with New Holland contributing 28%.
Processing
Ore from New Holland is processed at a centralised carbon-in-pulp (CIP) plant with a capacity of 1.35 Mtpa, including tertiary crushing, two-stage ball milling, gravity, and conventional leach/CIP for gold recovery.
Companies & ownership
  • Perenti Limited
    ASX:PRN
Motheo Copper Mine (including A4 and T3 open pits)

Ghanzi District, Botswana · Open Pit

Operating
CopperSilver
Commodities, grades and output
YearCommodityAv. GradeOutput
2025Copper-58000 t
2024Copper0.9 %427000 t
2024Silver13.5 g/t19800000 oz
2023Copper-8700 t
2023Silver-200000 oz
End year
2033
Mine life
10 years
Workforce
The mine employs over 2,000 people, including contractors, with over 95% of direct employees being Batswana citizens. During the production phase, it is expected to create 600 full-time jobs.
Overview
Motheo Copper Mine, including the A4 and T3 open pits, is an operating copper and silver mine in Botswana's Ghanzi District. It commenced commercial production in July 2023 and has an initial mine life of 10 years. The mine employs over 2,000 people and utilizes conventional crushing, grinding, and flotation processes.
Production
Production overview - 2025: copper 58000 t; 2024: copper 427000 t, silver 19800000 oz.
Processing
The processing method involves a central facility with conventional crushing, grinding, and flotation processes to produce a high-quality copper concentrate with a silver by-product. The plant's initial processing capacity of 3.2 million tonnes per annum (mtpa) was expanded, with the operation running at a 5.6 mtpa rate by September 2025.
Equipment
The mining fleet includes Hitachi EX1900 and EX2600s excavators, a Cat 992 wheel-loader, Cat 785 (150-tonne capacity) and Cat 777 (100-tonne capacity) haul trucks, and Cat D10 dozers. The fleet also includes four D10T dozers, two 777 water trucks, and two 18 motor graders.
Expansion
The Motheo operations include the T3 and A4 open pit mines. The development of the A4 open pit is part of an expansion to increase the processing rate to 5.2 mtpa. First ore from the A4 pit was expected in the first quarter of FY2025. The A1 deposit, located about 20 kilometres north-east of the mine, is a development project with the potential to provide an additional source of ore.
Power sources
Solar
Companies & ownership
  • Perenti Limited
    ASX:PRN
Mana Complex (Siou and Wona Underground)

Mouhoun Province, Burkina Faso · Underground

Operating
Gold
Commodities, grades and output
YearCommodityAv. GradeOutput
2023Gold-1072000 oz
Opened
2008-01-01
End year
2033
Mine life
9 years
Workforce
approximately 940 people
Overview
The Mana mine transitioned to a fully underground operation in 2024, with mining activities focused on the Siou and Wona underground deposits across three declines. Perenti Global, through its subsidiaries, acts as a contractor for underground mining services.
Production
Production overview - 2023: gold 1072000 oz.
Processing
conventional carbon-in-leach (CIL) processing plant
Expansion
Endeavour Mining's focus is to increase the mine life to more than 10 years through the expansion of underground deposits and the evaluation of local open-pit targets.
Companies & ownership
  • Perenti Limited
    ASX:PRN
Iduapriem

Western Region, Ghana · Open Pit

Operating
Gold
Commodities, grades and output
YearCommodityAv. GradeOutput
2024Gold1.36 g/t237000 oz
2023Gold1.54 g/t268000 oz
2022Gold1.42 g/t248000 oz
2021Gold1.14 g/t202000 oz
2020Gold1.7 g/t275000 oz
2019Gold1.67 g/t275000 oz
2018Gold-254000 oz
Workforce
2,538 (692 permanent, 1,846 contractors) in 2024
Production
Production overview - 2024: gold 237000 oz; 2023: gold 268000 oz.
Processing
The mine uses two processing circuits, a gravity circuit and a carbon-in-leach (CIL) plant. The gravity circuit recovers about 30% of the gold. The CIL plant has a capacity of 418,000 tonnes per month.
Expansion
A proposed joint venture between the Iduapriem mine and the nearby Tarkwa mine, operated by Gold Fields, was announced in 2023 but AngloGold Ashanti later withdrew from the proposal. The mine plans to relocate and resettle the Teberebie community to facilitate mine expansion. In July 2021, a five-year surface mining contract was awarded to AMAX, a joint venture between Perenti's African Mining Services (AMS) and Ghanaian company MAXMASS.
Companies & ownership
  • Perenti Limited
    ASX:PRN
Huntly Mine

Western Australia, Australia · Open Pit

Operating
Bauxite
Companies & ownership
  • Perenti Limited
    ASX:PRN
Great Fingall

Western Australia, Australia · Underground

Operating
Gold
Commodities, grades and output
YearCommodityAv. GradeOutput
2027Gold-45000 oz
2025Gold3.5 g/t-
Mine life
8 years
Capex (est.)
USD 30.00M
Overview
High-grade mining at the Great Fingall mine restarted in December 2025, marking the first production from the historic gold reef in over a century. The mine is forecast to ramp up steadily through FY26 and is expected to reach a steady-state production rate of approximately 40,000 tonnes per month by late FY27.
Production
Production overview - 2027: gold 45000 oz.
Processing
Ore from the Great Fingall mine will provide high-grade feed to Westgold's Cue processing hub. This is intended to complement the bulk tonnage from the nearby Big Bell mine.
Companies & ownership
  • Perenti Limited
    ASX:PRN
Garden Well

Western Australia, Australia · Open Pit

Operating
Gold
Commodities, grades and output
YearCommodityAv. GradeOutput
2023Gold2.63 g/t28600 oz
2022Gold1.33 g/t40300 oz
Workforce
An earlier report mentioned a 250-person accommodation village for the initial open cut mine.
Overview
The Garden Well mine is situated in the Duketon Greenstone Belt, approximately 100 to 130 kilometres north of Laverton in Western Australia. It is a key component of Regis Resources' Duketon South Operations (DSO).
Production
Production overview - 2023: gold 28600 oz; 2022: gold 40300 oz.
Processing
Processing plant with a nominal capacity of 5 Mtpa, expanded to 7.5 Mtpa combined with Rosemont slurry, includes two-stage crushing, scrubber, single ball mill, and CIL circuit.
Equipment
conventional truck and shovel methods, processing plant, two-stage crushing circuit, scrubber, single ball mill, carbon-in-leach (CIL) circuit
Expansion
Regis Resources is expanding underground operations; Garden Well Main development commenced in FY24, expected to produce in FY26. Garden Well South underground mine began commercial production in 2023. Planned underground ore mining rate for Garden Well Main is up to approximately 900,000 tonnes per annum, targeting 60,000 to 70,000 ounces of gold annually.
Companies & ownership
  • Perenti Limited
    ASX:PRN
Duketon Gold Project

Western Australia, Australia · Open Pit

Operating
Gold
Companies & ownership
  • Perenti Limited
    ASX:PRN
Dalgaranga

Western Australia, Australia · Open Pit

Operating
Gold
Companies & ownership
  • Perenti Limited
    ASX:PRN
Cowal

New South Wales, Australia · Open Pit

Operating
GoldSilver
Commodities, grades and output
YearCommodityAv. GradeOutput
2025Gold-330008 oz
2024Gold-312644 oz
2023Gold-227105 oz
2022Gold-276314 oz
Opened
2005-01-01
End year
2042
Mine life
37 years
Capex (est.)
USD 430.00M
Workforce
1200 (approximately 480 employees and 800 contractors)
Production
Production overview - 2025: gold 330008 oz; 2024: gold 312644 oz.
Processing
The processing plant uses crushing, two-stage grinding, sulphide flotation, regrind, and carbon-in-leach (CIL) recovery. The plant currently processes around 9.0Mtpa, with a permit to process up to 9.8Mtpa. Gold recovery in FY25 was approximately 87%.
Expansion
The Cowal Underground project received regulatory approval in October 2021, extending the mine life to 2040 at that time. In December 2024, the New South Wales Government approved the Open Pit Continuation (OPC) project, extending operations to 2042. This project includes the extension of the E42 pit and the development of three new open pits: E46, GR, and E41. The Board of Evolution Mining approved the $430 million capital investment for the OPC project in April 2025. The extension is expected to add 2 million ounces of gold production over 10 years.
Companies & ownership
  • Perenti Limited
    ASX:PRN
Bowen Basin (Goonyella Riverside)

Queensland, Australia · Open Pit

Operating
Coal
Companies & ownership
  • Perenti Limited
    ASX:PRN
Bonnie Vale

Western Australia, Australia · Underground

Under Development
Gold
Commodities, grades and output
YearCommodityAv. GradeOutput
2023Gold5.94 g/t-
2020Gold3.46 g/t-
Opened
2024-01-01
Mine life
4 years
Overview
The Bonnie Vale mine, part of Focus Minerals' Coolgardie Gold Project, is under development. Perenti's subsidiary, Barminco, is contracted for underground mining services. The mine is expected to be brought online in 2024, with ore processed at the Three Mile Hill plant. Recent resource updates include significant gold reserves and resources for both underground and open pit components.
Production
Production overview - 2023: gold 5.53 t; 2020: gold 1.74 t.
Processing
The ore from Bonnie Vale will be processed at the Three Mile Hill processing plant, which is owned by Focus Minerals and has a capacity of 1.2 million tonnes per annum.
Equipment
Three Mile Hill processing plant
Expansion
Mobilisation of Barminco to the site commenced in late 2024, with the first blast for the underground development portal occurring in December 2024. First development ore is anticipated around mid-2025, and stoping activities are scheduled to begin in the early December quarter of 2025. The nearby Varischetti Village was expanded in 2025 with an additional 80 rooms.
Companies & ownership
  • Perenti Limited
    ASX:PRN
BHP WAIO (Mount Whaleback)

Western Australia, Australia · Open Pit

Operating
Iron Ore
Companies & ownership
  • Perenti Limited
    ASX:PRN
Kasiya Rutile-Graphite Project

Lilongwe District, Malawi · Open Pit

Under Development
RutileGraphiteRare Earth Elements
Commodities, grades and output
YearCommodityAv. GradeOutput
2026Rutile0.96 %-
2026Graphite0.95 %-
2026Rare Earth Elements11.9 %-
2025Rutile-222000 t
2025Graphite-233000 t
Mine life
25 years
Capex (est.)
USD 665.00M
Overview
The Kasiya Rutile-Graphite Project is a proposed large-scale open pit operation in the Definitive Feasibility Study (DFS) phase, advancing as of March 2026 and scheduled for completion in Q4 2025. It is designed to process 24 million tonnes of ore a year to produce an estimated 245,000 tonnes of natural rutile and 288,000 tonnes of natural graphite annually at steady state. An Optimised Pre-Feasibility Study projects average annual production of 222,000 tonnes of rutile and 233,000 tonnes of graphite. Heavy rare earth elements have also been recovered from the rutile processing tailings stream, potentially providing a third revenue stream.
Production
Production overview - 2026: rutile 20300000 t, graphite 20000000 t; 2025: rutile 222000 t, graphite 233000 t.
Processing
The project will use conventional processing through physical separation. Plans include two processing plants; the first with a capacity of 12 million tonnes per year, and a second to be built in Year 5 to double the capacity to 24 million tonnes. The mining method will be either hydro-mining, using pressurised water to create a slurry, or dry mining with heavy earth-moving equipment. No drilling, blasting, crushing or milling is required.
Equipment
two processing plants; heavy earth-moving equipment
Expansion
a second processing plant to be built in Year 5 to double the capacity to 24 million tonnes
Companies & ownership
  • Sovereign Metals Limited
    ASX:SVM · LSE:SVML
Gonneville Project

Western Australia, Australia · Open Pit

Under Development
NickelCopperCobalt
Commodities, grades and output
YearCommodityAv. GradeOutput
2025Nickel-3200 t
2025Copper-5200 t
2025Cobalt-300 t
Mine life
23 years
Overview
The Gonneville discovery, made in March 2020, is the first major Platinum Group Element (PGE) discovery in Australia and has defined the new West Yilgarn Ni-Cu-PGE Province. It is recognised as the largest PGE discovery in Australian history and the largest nickel-sulphide discovery globally in over two decades.
Production
Production overview - 2025: nickel 3200 t, copper 5200 t, cobalt 300 t.
Processing
Copper-nickel sequential flotation and precious metal leaching to produce smelter-grade copper and nickel concentrates, and precious metal doré.
Companies & ownership
  • Chalice Mining Limited
    ASX:CHN · OTC:CGMLF
Gonneville Palladium-Nickel-Copper Project

Western Australia, Australia · Open Pit

Feasibility
PalladiumPlatinumGoldNickelCopperCobalt
Commodities, grades and output
YearCommodityAv. GradeOutput
2025Nickel-7000 t
2025Copper-8000 t
2025Cobalt-700 t
Opened
2029-01-01
End year
2052
Mine life
23 years
Capex (est.)
USD 541.20M
Workforce
Approximately 1,200 jobs during peak construction and around 500 during operations
Overview
The development plan involves a two-stage construction of an open pit mine and a process plant. Stage one is designed for the lowest capital cost and shortest payback period. Stage two will be an expansion, with the investment decision expected between 2031-2033. The ultimate processing capacity is planned to be 14Mtpa. The processing flowsheet will produce two smelter-grade concentrates (a copper concentrate and a nickel concentrate) and a palladium-platinum-gold doré.
Production
Production overview - 2025: nickel 7000 t, copper 8000 t, cobalt 700 t.
Processing
The processing flowsheet will produce two smelter-grade concentrates (a copper concentrate and a nickel concentrate) and a palladium-platinum-gold doré. A hydrometallurgical process is no longer required.
Expansion
The Pre-Feasibility Study (PFS) covers an initial 23-year open-pit mine life, which exploits about half of the Gonneville resource. There is significant potential for expansion through deeper open-pit mining or a large-scale underground operation beyond 2054. Stage two will be an expansion, with the investment decision expected between 2031-2033.
Companies & ownership
  • Chalice Mining Limited
    ASX:CHN · OTC:CGMLF
Kayelekera Uranium Mine

Karonga District, Malawi · Open Pit

Under Development
Uranium
Opened
2009-04-17
End year
2035
Mine life
10 years
Workforce
up to 600 jobs
Overview
The Kayelekera Uranium Mine is an open-pit mine in Karonga District, northern Malawi, currently in a production ramp-up phase. Operations restarted in August 2025, targeting 2.4 million pounds of U3O8 per annum.
Production
Production overview - 2014: uranium 2.35 Mlbs.
Processing
Ore is processed via grinding (historically SAG mill), acid leaching, resin-in-pulp (RIP) circuit, elution, and precipitation to produce uranium oxide (yellowcake). An on-site acid plant is used.
Equipment
conventional open-pit mining fleet, Sandvik Tamrock drills, Komatsu excavators, haul trucks, new mobile equipment
Expansion
significant investment to connect the mine to the Malawian national electricity grid
Power sources
DieselGridHydroelectric
Companies & ownership
  • Government of Malawi
Ying Mining District

Henan Province, China · Underground

Operating
SilverGoldLeadZinc
Opened
2006-01-01
End year
2038
Mine life
32 years
Workforce
over 3,000 contractors and staff
Overview
The Ying Mining District, operated by Silvercorp Metals Inc., is an active underground mining district in Henan Province, China, comprising seven underground mines (SGX, HZG, HPG, TLP, LME, LMW, and DCG) and a satellite deposit (Kuanping) under development. It has been in production since 2006, producing silver, lead, zinc, and gold from epigenetic, mesothermal quartz-carbonate veins. The district processes ore at two sulphide flotation plants with a total design capacity of 4,000 tonnes per day.
Production
Production overview - 2025: silver 1689 koz, gold 2050 oz, lead 14601 kct, zinc 1845 kct; 2023: silver 6.2 Moz, gold 7268 oz, lead 63.2 Mlbs, zinc 23.4 Mlbs.
Processing
two sulphide flotation plants (Plant 1 or No. 1 Mill/Xiayu Plant, and Plant 2 or No. 2 Mill/Zhuangtou Plant) with a total design capacity of 4,000 tonnes per day, crushing units (jaw and cone crushers), milling circuit (ball mills), sulphide flotation, X-ray transmission (XRT) ore-sorting system. Produces silver-lead and zinc concentrates, as well as gold doré.
Equipment
10 electric mining trucks, jaw and cone crushers, ball mills, X-ray transmission (XRT) ore-sorting system
Expansion
A satellite deposit, Kuanping, located 33 km north of Ying, is under development and is expected to be the eighth underground mine, with first production anticipated in 2026. An expansion at Mill No. 2, completed in late 2024, increased the total throughput from 2,500 tpd.
Companies & ownership
  • Silvercorp Metals Inc.
    TSX:SVM · NYSE:SVM