← Map view|Directory

Directory

Browse minesites, mining companies and suppliers. Use the tabs below to switch sections.

Minesites Directory

Browse minesites. Each card shows company ownership and their most recent associated articles.

Filter by mine details and commodity attributes.
Page 45 of 147 (3508 total)
Deflector Gold Project

Western Australia, Australia · Underground

Operating
GoldCopper
Commodities, grades and output
YearCommodityAv. GradeOutput
2024Gold4.6 g/t139000 oz
2024Copper0.2 %1037 t
2023Gold-260478 oz
2023Copper-1325 t
Opened
2016-10-25
Production
Production overview - 2024: gold 139000 oz, copper 1037 t; 2023: gold 260478 oz, copper 1325 t.
Processing
The Deflector processing plant includes a three-stage crushing circuit, a single ball mill, a gravity circuit for gold recovery, and a sulphide flotation circuit with flotation tails treated by a carbon-in-pulp (CIP) circuit. The plant has a throughput capacity of approximately 0.8 million tonnes per annum.
Equipment
new mining equipment, SANDVIK DD421
Expansion
Exploration is focused on defining extensions to mineralisation at Deflector South West and the nearby Spanish Galleon high-grade lodes. Spanish Galleon is expected to become a new mining front to supplement production in FY26 and FY27. Access development to the Spanish Galleon area was scheduled to commence in the second half of FY25.
Companies & ownership
  • Macmahon Holdings Limited
    ASX:MAH
Daisy Milano Gold Mine

Western Australia, Australia · Underground

Operating
Gold
Commodities, grades and output
YearCommodityAv. GradeOutput
2023Gold4.8 g/t41503 oz
Workforce
220 employees were integrated into Macmahon's underground business at the Daisy Milano project.
Production
Production overview - 2023: gold 41503 oz.
Processing
Ore from the Daisy Milano mine is processed at the Randalls processing facility. The facility has a throughput capacity of approximately 1.3 million tonnes per annum and utilises a conventional gravity and carbon-in-leach (CIL) circuit. In the 2024 financial year, the Randalls facility treated approximately 1.24 million tonnes of ore and achieved an average gold recovery of 89.7%.
Equipment
The existing fleet is utilised for the project. A job advertisement for truck operators at the mine specified experience with Epiroc MT65, Sandvik TH663i, or CAT underground trucks.
Expansion
The merger of Red 5 and Silver Lake Resources to form Vault Minerals was completed in June 2024. Macmahon Holdings secured a two-year contract extension in November 2024, expected to generate approximately $90 million in revenue.
Companies & ownership
  • Macmahon Holdings Limited
    ASX:MAH
Byerwen Coal Mine

Queensland, Australia · Open Pit

Operating
Coal
Commodities, grades and output
YearCommodityAv. GradeOutput
2025Coal-10000000 t
End year
2067
Mine life
50 years
Workforce
545
Production
Production overview - 2025: coal 10000000 t.
Processing
The mine has two coal handling and preparation plants. The processing facilities produce both metallurgical quality coal and thermal coal products.
Expansion
A contract extension for Macmahon Holdings is set to significantly increase production from five to 10 million tonnes of hard coking coal per annum.
Companies & ownership
  • Macmahon Holdings Limited
    ASX:MAH
Boston Shaker

Western Australia, Australia · Underground

Operating
Gold
Commodities, grades and output
YearCommodityAv. GradeOutput
2024Gold1.56 g/t0.009 t
2023Gold1.45 g/t0.009 t
2022Gold1.41 g/t0.009 t
Mine life
7 years
Expected tendering
2027-05-01
Workforce
The total average workforce for the Tropicana operation in 2024 was 1,010, consisting of 208 permanent employees and 802 contractors. A 2025 fact sheet states the workforce is approximately 200 employed by AngloGold Ashanti and 800 by contractors.
Overview
The Boston Shaker mine is part of the Tropicana Joint Venture, owned by AngloGold Ashanti Australia Ltd (70%, operator) and Regis Resources Ltd (30%). Regis Resources acquired its 30% interest from IGO Limited in 2021.
Production
Production overview - 2024: gold 0.009 t; 2023: gold 0.009 t.
Processing
Ore from the Boston Shaker underground mine supplements the open pit feed for the Tropicana processing plant. The plant has a throughput capacity of approximately 9.4 million tonnes per annum. Open pit and underground mining are carried out by Macmahon. The services provided by Macmahon for the underground operations include mine development, production drilling, cable bolting and ore stoping.
Equipment
The underground fleet, operated by mining contractor Macmahon, includes 5 Sandvik DD421 development drills, 2 Sandvik DL432i and 1 Sandvik DL421 production drills, 7 Sandvik LH621 and 1 Sandvik LH517 boggers, 3 CAT 2900 boggers, and 11 Sandvik TH663 trucks.
Companies & ownership
  • Macmahon Holdings Limited
    ASX:MAH
Yinnetharra Lithium Project

Western Australia, Australia · Open Pit

Under Development
Lithium
Companies & ownership
  • Delta Lithium Limited
    ASX:DLI
Mt Ida Lithium Project

Western Australia, Australia · Open Pit

Under Development
LithiumRhodiumTantalumGold
Commodities, grades and output
YearCommodityAv. GradeOutput
2025Lithium1.21 %14.8 Mt
2025Rhodium0.42 %14.8 Mt
2025Tantalum170 ppm14.8 Mt
2024Gold3.5 g/t752000 oz
2023Lithium1.2 %14.6 Mt
2023Gold4.1 g/t412000 oz
2022Lithium1.2 %12.7 Mt
Mine life
10 years
Overview
The Mt Ida Project is described as "shovel-ready" and is currently under development. As of November 2023, the project has received all statutory approvals for the commencement of open pit mining operations from the Western Australian Department of Mines, Industry, Regulation and Safety (DMIRS), including an approved Mining Proposal and Mine Closure Plan. The project is fully permitted for both open pit and underground mining. Feasibility studies for a lithium concentrate project are underway.
Production
Production overview - 2025: lithium 14.8 Mt, rhodium 14.8 Mt, tantalum 14.8 Mt; 2024: gold 752000 oz.
Processing
The proposed processing method is a whole-of-ore flotation (WOF) flowsheet. This process is designed to produce tantalite, mica, and spodumene concentrates. Test work has confirmed that rubidium can be readily extracted as a by-product within the mica pre-float stage, with recoveries averaging around 90%. Downstream processing and vertical integration studies are in progress.
Equipment
multiple reverse circulation (RC) and diamond drill rigs
Expansion
Significant potential for further resource growth, with ongoing drilling programs aimed at expanding the current mineral resources. A new LCT (Lithium-Caesium-Tantalum) pegmatite discovery has been made in the Sister Sam footwall, indicating exploration upside.
Companies & ownership
  • Delta Lithium Limited
    ASX:DLI
Hunter Valley Hydrogen Project

New South Wales, Australia · Processing Facility

Under Development
Opened
2026-01-01
Workforce
160 jobs during the construction phase and 10 ongoing operational roles
Overview
The Hunter Valley Hydrogen Project (HVHH) is a renewable hydrogen production facility on Kooragang Island, Newcastle, NSW, operated by Orica. It aims to produce renewable hydrogen to replace natural gas as a feedstock in Orica's adjacent ammonia plant, contributing to decarbonisation.
Production
In its first phase, the facility is expected to produce approximately 12 tonnes of renewable hydrogen per day, which equates to around 4,700 tonnes per year. This renewable hydrogen will be used to produce approximately 26,600 tonnes of low-carbon ammonia annually.
Equipment
grid-connected 50-55 megawatt (MW) electrolyser, pipeline
Expansion
developed in phases, with the first phase designed to be a commercial-scale demonstration
Power sources
Grid
Water sources
Recycled/Reclaimed
Companies & ownership
  • Orica Limited
    ASX:ORI
Yarraville Remediation Project

Victoria, Australia · Processing Facility

Operating
Gold
Opened
2018-01-01
End year
2024
Overview
The Yarraville Remediation Project is an undertaking by Orica to address historical contamination at its former chemical manufacturing site located at 325 Whitehall Street, Yarraville, approximately 6 kilometres west of Melbourne's CBD. The purpose of the project is to prepare the 3.5-hectare site for divestment and future commercial or industrial use.
Processing
Excavation of contaminated soil for transport and thermal treatment at a licensed off-site facility. In-situ thermal desorption (ISTD) for deeper soil and shallow groundwater, using gas-fired heaters to heat soil to approximately 100°C, with volatile hydrocarbons extracted and treated in a small on-site treatment plant.
Equipment
gas-fired heaters, odour control enclosures, emission control systems
Power sources
Natural Gas
Companies & ownership
  • Orica Limited
    ASX:ORI
Orica Villawood Remediation Project

New South Wales, Australia · Processing Facility

Closed
End year
2015
Capex (est.)
USD 20.00M
Workforce
35 jobs during its 58-week duration, with 15 to 20 people for remediation work
Overview
The project involved the remediation of contaminated soil at the former Orica Villawood industrial site. Contaminants included DDT, TPHs, benzene, 1,2-DCA, TCE, MCB, 1,4-dichlorobenzene, HCB, lindane, and PAHs. Approximately 25,000 to 27,000 cubic metres of contaminated material were treated.
Processing
Directly-heated thermal desorption (DTD) involving vaporisation of contaminants in a rotary dryer, cooling treated soil, destruction of off-gas in a thermal oxidiser, rapid cooling of gas stream, and treatment in a baghouse and scrubber.
Equipment
Directly-heated Thermal Desorption (DTD) plant, Emissions Control System (ECS), Wastewater Treatment Plant (WTP), enclosed Feed Soil Building (FSB), Sealed trucks
Companies & ownership
  • Orica Limited
    ASX:ORI
Carseland Manufacturing Plant

Alberta, Canada · Processing Facility

Operating
Opened
1977-01-01
Workforce
around 100 employees
Overview
The Orica Carseland facility is a manufacturing plant in Alberta, Canada, producing ammonium nitrate for mining, construction, and logging industries.
Production
Approximately 450-500 kilotonnes per annum of ammonium nitrate (AN solution and prill). One nitric acid plant (NAP 1) produces approximately 890 tonnes per day of nitric acid.
Processing
Oxidation of ammonia on a platinum-rhodium catalyst to produce nitric acid, which is then reacted to form low-density prilled ammonium nitrate. The plant has installed tertiary catalyst abatement technology to reduce nitrous oxide emissions.
Companies & ownership
  • Orica Limited
    ASX:ORI
Brownsburg Manufacturing Plant

Quebec, Canada · Processing Facility

Operating
Opened
1919-01-01
Workforce
More than 300 people in May 2019.
Overview
The Brownsburg Manufacturing Plant is a global hub for Orica's production of Electronic Blasting Systems (EBS), manufacturing the full range of EBS for both surface and underground operations, including i-kon™, uni tronic™, eDev™, and WebGen™. The site also has non-electric auto assembly and shock-tube manufacturing areas.
Production
As of May 2019, the facility had produced 100 million electronic detonators since it began manufacturing the first generation of EBS in 2006.
Expansion
In the three years leading up to April 2014, Orica invested more than CAD $16 million to develop new product lines and improve efficiency at the site. In April 2014, Orica announced initiatives to optimize and consolidate manufacturing capacity, which involved the progressive closure of the Components Department and the transfer of non-electric manual assemblies to a facility in Mexico.
Companies & ownership
  • Orica Limited
    ASX:ORI
Orica Explosives - Ulan Mine Site

New South Wales, Australia · Processing Facility

Operating
Overview
Orica Australia Pty Ltd operates an explosives facility at the Ulan Mine Site in New South Wales, Australia. This facility provides explosives and related services and operates under the Environment Protection Authority (EPA) Licence No. 4443.
Companies & ownership
  • Orica Limited
    ASX:ORI
Larego

Western Australia, Australia · Open Pit

Operating
Bauxite
Commodities, grades and output
YearCommodityAv. GradeOutput
2024Bauxite-10.5 Mt
2019Bauxite-10 Mt
End year
2040
Workforce
Approximately 250 people in 2019; approximately 350 direct employees and 80 contractors in 2024 (for the entire Willowdale Mine).
Overview
Larego is the newest mining region of Alcoa of Australia's Willowdale Bauxite Mine in Western Australia. Perenti Global, through its subsidiary Ausdrill, undertakes drill and blast work at the site for its client, Charles Hull. The bauxite ore mined supplies Alcoa's Wagerup Alumina Refinery.
Production
Production overview - 2024: bauxite 10.5 Mt; 2019: bauxite 10 Mt.
Processing
crushing the bauxite ore on-site before it is transported to the Wagerup refinery via an overland conveyor system
Equipment
ore crusher, haul road, crusher pad, feed line, haul truck fleet (50-tonne to 85-tonne)
Expansion
transition of mining operations from the older Orion region to the new Larego region occurred in March 2021; relocation of an ore crusher to the site; construction of a new crusher pad, feed line, haul road, and other facilities
Companies & ownership
  • Perenti Limited
    ASX:PRN
KCGM Operations (Superpit)

Western Australia, Australia · Open Pit

Operating
Gold
Commodities, grades and output
YearCommodityAv. GradeOutput
2029Gold-900000 oz
2026Gold-535000 oz
2025Gold-419000 oz
2024Gold-437000 oz
2023Gold-432001 oz
Opened
1989-01-01
End year
2034
Mine life
45 years
Capex (est.)
USD 1.50B
Workforce
Approximately 1,680 employees and contractors as of 2025.
Overview
KCGM Operations represents a premier gold mining hub situated in Kalgoorlie-Boulder, Western Australia, roughly 600km east of Perth. The asset has been entirely owned and managed by Northern Star Resources Ltd since early 2021. The operation centerpieces the Fimiston Open Pit, widely recognized as the Super Pit, which reaches dimensions of 3.5km in length and 700m in depth. It functions as a fully integrated complex that also incorporates the Mt Charlotte and Fimiston underground mines to maintain a continuous 24/7 production cycle.
Production
During the 2025 financial year, the operation produced 419,000 ounces of gold. Production guidance for the 2026 financial year is set between 520,000 and 600,000 ounces, reflecting an intentional ramp-up in activity. The site currently moves over 80 million tonnes of total material annually from the open pit. Northern Star aims to achieve a steady-state production rate of 900,000 ounces per annum by 2029 through aggressive infrastructure upgrades and expanded mining areas.
Processing
Ore treatment occurs across the Fimiston and Gidji processing plants, which currently maintain a combined capacity of 13 million tonnes per annum. The metallurgical process begins with primary crushing and grinding through SAG and Ball Mills. Following comminution, a flotation circuit produces a pyrite-telluride concentrate. This concentrate undergoes ultra-fine grinding and roasting at the Gidji facility to facilitate gold extraction. Final recovery utilizes cyanide leaching within Carbon-in-Leach or Carbon-in-Pulp circuits. The resulting gold is precipitated and smelted into doré bars containing approximately 70% to 80% gold before being transported to the Perth Mint for final purification.
Equipment
The open pit utilizes a high-capacity fleet featuring Caterpillar 793 haul trucks and Komatsu PC8000 face shovels. Underground sections rely on specialized low-profile loaders, jumbos, and long-hole drills to navigate the subterranean environment. As of late 2025, the operation supports a workforce of approximately 1,680 employees and contractors. The labor model is predominantly residential, with about 90% of the staff living locally in Kalgoorlie-Boulder, while the remainder operates on a fly-in, fly-out basis.
Expansion
A major $1.5 billion expansion is currently underway to increase the Fimiston mill capacity to 27 million tonnes per annum. This project is slated for commissioning in the first half of the 2026-2027 financial year and will eventually lead to the decommissioning of the Gidji plant. The Fimiston South Project is also extending the operational life of the mine to 2034 by deepening the southern sections of the pit. Concurrently, underground ore production is expected to double to nearly 4 million tonnes per annum by 2026 as new portals in the Fimiston Underground become active.
Companies & ownership
  • Perenti Limited
    ASX:PRN
  • Northern Star Resources Ltd.
    ASX:NST
Garden Well Underground

Western Australia, Australia · Underground

Under Development
Gold
Commodities, grades and output
YearCommodityAv. GradeOutput
2024Gold2.8 g/t295000 oz
Production
Production overview - 2024: gold 295000 oz.
Processing
The Garden Well processing plant has a nominal throughput rate of 5 million tonnes per annum and utilises a two-stage crushing circuit, scrubber, and a single ball mill. The carbon-in-leach circuit has a larger capacity to also process the feed from Rosemont.
Expansion
Development of the Garden Well Main underground mine commenced in the 2024 financial year.
Companies & ownership
  • Perenti Limited
    ASX:PRN
Rosemont Underground

Western Australia, Australia · Underground

Operating
Gold
Commodities, grades and output
YearCommodityAv. GradeOutput
2024Gold2.8 g/t157000 oz
Workforce
approximately 40 staff on site
Overview
Regis Resources' first underground operation within the Duketon Complex.
Production
Production overview - 2024: gold 157000 oz.
Processing
Slurry is pumped to the Garden Well carbon-in-leach circuit.
Expansion
Rosemont Stage 3 extension
Companies & ownership
  • Perenti Limited
    ASX:PRN
Goldrush Project

Nevada, United States · Underground

Under Development
Gold
Companies & ownership
  • Perenti Limited
    ASX:PRN
Nyankanga

Mwanza Region, Tanzania · Open Pit

Operating
Gold
Companies & ownership
  • Perenti Limited
    ASX:PRN
Geita Hill

Geita, Tanzania · Open Pit

Operating
Gold
Companies & ownership
  • Perenti Limited
    ASX:PRN
Yaramoko

Balé Province, Burkina Faso · Underground

Operating
Gold
Companies & ownership
  • Perenti Limited
    ASX:PRN
Sunrise Dam

Western Australia, Australia · Open Pit

Operating
Gold
Companies & ownership
  • Perenti Limited
    ASX:PRN
Subika

Brong-Ahafo Region, Ghana · Underground

Operating
Gold
Companies & ownership
  • Perenti Limited
    ASX:PRN
St Ives

Western Australia, Australia · Open Pit

Operating
Gold
Companies & ownership
  • Perenti Limited
    ASX:PRN
Sino Iron project

Western Australia, Australia · Open Pit

Operating
Iron Ore (Magnetite)
Commodities, grades and output
YearCommodityAv. GradeOutput
2024Iron Ore (Magnetite)65 %14.9 Mt
2023Iron Ore (Magnetite)-21 Mt
2022Iron Ore (Magnetite)65 %21.41 Mt
2019Iron Ore (Magnetite)-20 Mt
2017Iron Ore (Magnetite)-16 Mt
Opened
2013-01-01
Mine life
25 years
Autonomous haulage
Yes
Workforce
more than 3,000 direct employees and contractors
Overview
The Sino Iron project uses traditional open-pit mining techniques to excavate ore, which is then processed on-site through a beneficiation process to produce a high-grade magnetite concentrate. The operation is supported by a 480 megawatt gas-fired power station and a desalination plant.
Production
Production overview - 2024: iron ore (magnetite) 14.9 Mt; 2023: iron ore (magnetite) 21 Mt.
Processing
Ore is excavated and then processed on-site through a beneficiation process to produce a high-grade magnetite concentrate. The process involves in-pit crushers, followed by a series of crushers and mills (autogenous grinding mills and ball mills) in the processing plant. Magnetic separation is used to draw the magnetite concentrate from waste. The final concentrate is transported as a slurry via a 30km pipeline to the port, where it is dewatered for shipping.
Equipment
The mining fleet includes some of the world's largest haul trucks and excavators. In 2024, five new remotely-controlled autonomous drills were deployed.
Expansion
The project's continued operation is dependent on extending its mine pit and waste storage areas. In May 2025, after a significant delay, the tenement holder, Mineralogy, agreed to jointly submit the 2023 Mine Continuation Proposals (MCPs) to the Western Australian Government. These proposals are intended to support operations for an interim period. Due to existing physical constraints, production for the 2024 calendar year was expected to be reduced to approximately 14 million wet metric tonnes from over 21 million in 2023. The State of Western Australia approved the 2023 MCPs in June 2025, which is a critical step towards the mine returning to previous production levels.
Power sources
Natural Gas
Water sources
Desalination
Companies & ownership
  • Perenti Limited
    ASX:PRN
Page 45 of 147 (3508 total)