← Map view|Directory

Directory

Browse minesites, mining companies and suppliers. Use the tabs below to switch sections.

Minesites Directory

Browse minesites. Each card shows company ownership and their most recent associated articles.

Filter by mine details and commodity attributes.
Page 137 of 147 (3508 total)
Mayfair Gold Project

Ontario, Canada · Open Pit

Under Development
Gold
Opened
2023-07-26
Overview
Orogenic gold project with updated NI 43-101 resource.
Processing
Metallurgical testwork
Equipment
Conceptual OP fleet
Island Gold Mine (Phase 3+ Expansion)

Ontario, Canada · Underground

Feasibility
Gold
Opened
2022-06-28
Overview
Phase 3+ expansion of a high-grade underground gold mine near Dubreuilville.
Production
Planned expansion production
Processing
Crushing, grinding, CIL
Equipment
Jumbo (dev) current 4 / post 3; Bolter 0 / 4; Scissor lift 17 / 8; UG haulage truck 17 / 6 (ore/waste—includes Epiroc MT-42 + CAT AD-30 use referenced); LHD 6-yd 12 / 18; LHD 3.5-yd 4 / 4; Grader 2 / 2; Lube/Water truck 3 / 3; Boom truck 6 / 4; UG personnel vehicles 31 / 35; Tractor 4 / 6; Excavator 1 / 1; Loader (surface works) 4 / 2.
Moss Gold & East Coldstream Deposits (Moss Project)

Ontario, Canada · Open Pit

Under Development
Gold
Opened
2023-06-01
Overview
Project centre coordinates provided in UTM (Zone 15): Moss Deposit 668,860E / 5,379,100N.
Equipment
Drilling: report notes periods where Goldshore had seven drill rigs active on the project (for drilling).
Gibraltar Mine

British Columbia, Canada · Open Pit

Operating
CopperMolybdenum
Opened
1972-01-01
End year
2044
Mine life
18 years
Workforce
approximately 700
Overview
Large open-pit Cu-Mo mine with updated reserves and capital.
Production
In 2023, the Gibraltar mine produced 122.6 million pounds of copper and 1.2 million pounds of molybdenum. For the 2025 year, copper production was 98 million pounds and molybdenum production was 1.9 million pounds. The company projects annual copper production for 2025 to be between 120 to 130 million pounds.
Processing
The processing facilities consist of two bulk sulphide concentrators with a combined design capacity of 85,000 tonnes per day, a dedicated molybdenum flotation plant, and a solvent extraction and electrowinning (SX/EW) facility. The process involves crushing, grinding through SAG and ball mills, and flotation.
Equipment
The current mining operations use conventional open pit equipment. The fleet includes five electric blast hole drills (12¼”–13¾” bits), four electric rope shovels (1x56 yd³, 2x58 yd³, 1x44 yd³), two 30 yd³ front end loaders, and 30 haul trucks. In 2025, four new Liebherr PR 776 dozers were added to the fleet, including the first Generation 8 model in Canada. The mine also utilises ancillary track dozers, wheel loaders, motor graders, and sand and water trucks. An in-pit crusher and conveyor system are also part of the operation.
Companies & ownership
  • Osisko Gold Royalties Ltd.
    TSX:OR · NYSE:OR
Blackwater Gold Mine

British Columbia, Canada · Open Pit

Under Development
Gold
Opened
2024-02-21
End year
2046
Mine life
22 years
Workforce
~900 (planned)
Overview
Large open-pit gold mine with 2024 Expansion Study by Artemis Gold.
Production
Planned large-scale gold production
Processing
Crushing, grinding, gravity, CIL
Equipment
Electric rotary tracked drills 250 mm (max 3); Diesel rotary tracked drills 200 mm (max 5); Diesel RC tracked drills 140 mm (max 2); Electric hydraulic front shovels 34 m³ (max 3); Diesel hydraulic excavators 22 m³ (max 3); Wheel loader 12 m³ (1); Rigid-frame haul trucks 240 t (max 33); Rigid-frame haul trucks 140 t (3); Articulated haul trucks 40 t (2); Motor grader 5.5 m blade (4); Motor grader 4.9 m blade (1); Water/gravel trucks (3); Track dozers 450 kW (4); Track dozers 325 kW (4); Wheel loaders 7 m³ (2); Hydraulic excavators 4.5 m³ (2); Hydraulic excavators 3.0 m³ (2); Fuel & lube trucks (3); Shuttle buses (4); Pickup trucks (15); Light plants 6 kW (9); Water pumps 150 m³/h (6); On-highway dump trucks (2); Flatbed picker truck (1); Maintenance trucks (4); Mobile crane 30 t (1); Float trailer 55 t (1); Forklift 5 t (1); Cable reeler (WL, 10 t) (1); Scissor lift (1); Mobile manlift (1).
Duncan Kerr Property

Ontario, Canada · Open Pit

Under Development
Gold
Opened
2013-03-22
Overview
Early-stage gold exploration property in the Larder Lake district.
Equipment
Diamond drilling (2,000–3,000 m programs); drill core re-logging (diamond drill holes DK12-02, DK12-04, DK12-07, DK12-08); trenching (recent trenching reviewed); diamond saw rental.
Caribou Mine

New Brunswick, Canada · Underground

Care And Maintenance
LeadSilverZinc
Opened
2018-05-31
End year
2027
Mine life
9 years
Workforce
~600
Overview
VMS zinc-lead-silver mine at Bathurst Camp.
Production
Planned restart production
Processing
Crushing, grinding, flotation
Equipment
Mobile equipment shop & warehouse; Sullair 1300 CFM/350 psi compressor; Sullair 900 CFM/350 psi compressor; electrical substation/transformer; diesel generator; reactor tanks (2); dosing pumps (2); sludge press; 5,000-gallon lime silo; chemical storage tank.
Yellowhead Copper Project

British Columbia, Canada · Open Pit

Feasibility
CopperGold
Opened
2025-06-15
End year
2050
Mine life
25 years
Workforce
~700 (planned)
Overview
Advanced copper project with updated reserve-backed mine plan and production schedule.
Production
Planned Cu-Au production
Processing
Crushing, grinding, flotation
Equipment
Electric Rotary Drill (311 mm, max 5); Electric Rope Shovel (55 m³, max 3); Diesel Hydraulic Shovel (36 m³, max 1); Front-End Loader (30 m³, max 1); Haul Truck (290 t, max 25).
McClean North Uranium Deposits

Saskatchewan, Canada · Underground

Under Development
Uranium
Opened
2007-01-31
Overview
NI 43-101 MRE for satellite uranium deposits; no mine plan.
Equipment
Conceptual UG fleet
Goldex

Quebec, Canada · Underground

Operating
GoldSilverCopper
End year
2032
Workforce
approximately 700 employees and contractors
Overview
Goldex is an underground mine located in Val-d'Or, Quebec, Canada, and is operated by Agnico Eagle Mines Limited, which holds 100% ownership. The mine produces gold, with silver and copper as by-products. The Goldex complex is comprised of the Goldex underground mine and the Akasaba West open-pit mine, which is located less than 30 kilometres away and provides additional ore for the Goldex mill.
Production
760 thousand tonnes of ore milled in the first three months of 2023.
Processing
Primary jaw crusher (underground), secondary cone crusher (surface), grinding circuit (SAG mill, ball mill), gravity circuit (Knelson concentrators, Gemini shaking tables), flotation. Gold smelted on-site to produce doré bars. Gold-bearing pyrite concentrate transported to LaRonde complex for further processing.
Equipment
Rail-Veyor®, Jarvis and CAT AD45B haul trucks, CAT R2900X scooptrams
Companies & ownership
  • Agnico Eagle Mines Limited
    TSX:AEM · NYSE:AEM
Young-Davidson Mine

Ontario, Canada · Underground

Operating
Gold
End year
2038
Mine life
15 years
Workforce
In 2019, the Young-Davidson operation sustained 817 full-time equivalent employees at the local level.
Overview
The Young-Davidson Mine is a large, low-cost, bulk tonnage underground gold mine located in north-eastern Ontario, Canada, near Matachewan, within the Abitibi Greenstone Belt.
Production
Production in 2025 was 153,400 ounces of gold. The guidance for 2026 projects gold production to be between 155,000 and 175,000 ounces.
Processing
The processing plant has a capacity of 8,000 tonnes per day. The process involves a single-stage semi-autogenous grinding (SAG) circuit, followed by flotation. The flotation concentrate is then further ground and leached in a carbon-in-leach (CIL) circuit. The flotation tailings are also leached in a separate CIL circuit. Gold is recovered from the carbon, followed by electro-winning and the pouring of doré bars. The tailings are treated using the SO2/Air cyanide destruction method. The facility also includes a paste backfill plant that can supply over 8,000 tonnes per day of paste to the underground workings.
Equipment
The equipment fleet includes large, modern machinery. Scooptrams are used to load and haul ore to an ore pass system. In 2024, the mine took delivery of two Cat R2900 XE diesel-electric loaders, which replaced two R2900G XTRA loaders and one R1700 loader. Ore is hoisted to the surface in two 24.5-tonne skips in the Northgate shaft.
Expansion
A multi-year expansion of the lower mine infrastructure was completed in July 2020.
Companies & ownership
  • Alamos Gold Inc.
    TSX:AGI · NYSE:AGI
Pinos Altos

Chihuahua, Mexico · Sublevel Stoping

Operating
GoldSilver
Opened
2009-01-01
End year
2028
Mine life
19 years
Workforce
approximately 1,200 employees (2017)
Production
81,734 ounces of gold (2025 guidance), 75,000 ounces of gold (2026 mid-point guidance)
Processing
conventional processing plant (5,500 tonnes per day) with crushing, grinding, gravity concentration, agitated leaching, counter-current decantation; heap-leaching for lower-grade ore; Merrill-Crowe method for gold and silver recovery; on-site refinery for gold and silver doré bars
Equipment
Sandvik DL411, Sandvik rock bolters and cable bolters, Schwing Bioset KSP 140 pump, KSP 220 piston pump, shovels and trucks
Companies & ownership
  • Agnico Eagle Mines Limited
    TSX:AEM · NYSE:AEM
Lamaque Complex

Quebec, Canada · Underground

Operating
Gold
End year
2032
Mine life
8 years
Overview
The Lamaque Complex is an operating underground gold mine in Val-d'Or, Quebec, Canada, 100% owned by Eldorado Gold. It includes the Triangle mine, Ormaque mine, Parallel and Plug #4 deposits, and the Sigma Mill.
Production
In 2025, produced 187,208 ounces of gold from 997,227 tonnes of ore milled at a grade of 6.19 grams per tonne. Average annual gold production expected to be above 175,000 ounces through 2028.
Processing
Ore from underground operations is processed at the Sigma Mill, which has a current capacity of approximately 2,500 tonnes per day, with studies to increase throughput towards 5,000 tonnes per day.
Expansion
Development of the Ormaque deposit adds a second underground mine to the complex, leveraging existing infrastructure, with operating authorisation in March 2026.
Companies & ownership
  • Eldorado Gold Corporation
Rainy River Mine

Ontario, Canada · Open Pit

Operating
GoldSilver
Companies & ownership
  • New Gold Inc.
    TSX:NGD
Brucejack Gold Mine

British Columbia, Canada · Underground

Operating
GoldSilver
Opened
2020-03-09
End year
2032
Mine life
13 years
Workforce
~1,100
Overview
High-grade underground gold mine (Valley of the Kings).
Production
Ongoing gold production
Processing
Gravity, flotation, cyanidation
Equipment
Haul trucks; loaders/LHDs; bolters; jumbos; scissor decks; lube truck; plus plant equipment incl. primary jaw crusher; vibrating screen & pebble crusher; SAG mill; ball mill; cyclone clusters; gravity concentrator; flash flotation cell; rougher/scavenger flotation cells; concentrate thickener & filter; tailings thickener; filter press; cyanide destruction circuit.
Nalunaq Project

Greenland, Greenland · Underground

Under Development
Gold
Opened
2022-09-03
Overview
High-grade orogenic gold deposit with updated NI 43-101 mineral resource.
Equipment
Conceptual underground equipment
Scully Mine Re-start Project

Newfoundland & Labrador, Canada · Open Pit

Feasibility
Iron Ore
Opened
2021-05-31
End year
2047
Mine life
27 years
Overview
FS report for Scully Mine Re-start Project.
Production
Planned production
Processing
crushing, grinding, magnetic separation
Equipment
Peak onsite requirements (from equipment schedule table): 15 × 240t Mining Trucks; 2 × 100t Mining Trucks; 2 × 600HP Dozers; 2 × 350HP Dozers; 2 × Motor Graders; 1 × 500HP Wheel Dozer; 1 × Water/Sand Truck; 1 × 49t Excavator; 1 × Rock Breaker; plus loaders/drills listed with peak counts
Meadowbank Gold Complex (incl. Amaruq)

Nunavut, Canada · Open Pit

Operating
Gold
Opened
2017-12-31
End year
2032
Mine life
15 years
Workforce
~1,100
Overview
Large operating gold complex; report details capital and operating costs but does not restate initial project CAPEX.
Production
Ongoing
Processing
Crushing, grinding, gravity, CIL
Equipment
165-mm (6.5") blasthole drill x6–10; 244-mm (9.6") in-pit drill x2; 200-mm (7.9") in-pit drill x2; 12.5-m3 electric shovel x2; 11.5-m3 diesel shovel x2; 6-m3 backhoe x1; 11-m3 backhoe x2; 150-tonne haulage truck x9–14; 100-tonne haulage truck x4–10; 100-tonne low-profile articulated truck x0–2; 19-tonne loader x0–3; 12-tonne loader x0–2; 72-tonne dozer x2–3; 60-tonne dozer x2; 46-tonne dozer x2; 31-tonne grader x1–2; 7.6-m3 wheel loader x2; 5.7-m3 wheel loader x1–2; 130-mm (5.1") in-pit drill x2; 165-mm (6.5") in-pit drill x1; 77-tonne excavator x1; 4.9-m3 front-end loader x1; 4-m3 front-end loader x1; 31-tonne excavator x2–3; 16-tonne excavator x1; 12-tonne excavator x0–1; 6.7-m3 backhoe x0–1; 2.3-m3 backhoe x1
Mary River Iron Mine

Nunavut, Canada · Open Pit

Operating
Iron Ore
Opened
2011-01-01
End year
2045
Mine life
25 years
Workforce
~1,500
Overview
Major iron ore operation on Baffin Island with rail and port infrastructure.
Production
Ongoing iron ore production
Processing
Crushing, screening
Equipment
Production drills (Atlas Copco DM45 equivalent) 2; Ancillary drill 1; Backhoe excavators (4.75 m³ bucket) 2; Front-end loader (6.1 m³ bucket) 1; Dump trucks (55 t) 8; Trackdozers (CAT D9 equivalent) 2; Wheeldozer (CAT 834 equivalent) 1; Grader (CAT 14 equivalent) 2; Pickup trucks 7.
Back River (Goose Project)

Nunavut, Canada · Underground

Feasibility
Gold
Opened
2021-01-15
End year
2038
Mine life
15 years
Workforce
~1,200 (planned)
Overview
Feasibility-stage gold project (Goose/George) with defined LOM and infrastructure.
Production
Planned gold production
Processing
Crushing, grinding, gravity, CIL
Equipment
Excavator 140 t (4.3 m³, 1); Excavator 200 t (8.7 m³, 1); Wheel loader 10.3 m³ (1); Off-highway haul truck 98 t (6); Articulated haul truck 20 t (1); Track dozer 20 t (1); Track dozer 34 t (2); Motor grader 25 t (1); Water truck 17,000 L (1); Fuel & lube truck 24,000 L (1); Fuel & lube truck 10,000 L (1); Telehandler 10,000 lb (2); plus mine support equipment: LHD; jumbos; bolters; longhole drills; shotcrete sprayers; scissor lifts; service/light vehicles (fuel/lube, mechanics, etc.).
Lalor & Snow Lake Operations

Manitoba, Canada · Underground

Operating
CopperGoldSilverZinc
Opened
2021-03-29
End year
2031
Mine life
10 years
Workforce
~1,300
Overview
Integrated UG operations with reserve-backed LOM and capital programs.
Production
Ongoing
Processing
Crushing, grinding, flotation
Equipment
Underground trucks 65t (Lalor 4; 1901 2); underground trucks 42t (Lalor 12; 1901 1; WIM 5; 3 Zone 3); LHD 14t (Lalor 10; 1901 3; WIM 5; 3 Zone 3); LHD 18t (Lalor 5); LHD – service (Lalor 3; 1901 1); two boom jumbo (Lalor 6; 1901 2; WIM 2; 3 Zone 2); roof bolters (Lalor 10; 1901 3; WIM 2; 3 Zone 2); longhole drills (Lalor 5; WIM 2; 3 Zone 2); blockholer (Lalor 2); powder truck (Lalor 5; 1901 1; WIM 1; 3 Zone 1); scissor lift (Lalor 12; 1901 3; WIM 3; 3 Zone 3); boom truck (Lalor 3; 1901 1; WIM 1; 3 Zone 1); grader (Lalor 2; 1901 1; WIM 1; 3 Zone 1); backhoe (Lalor 5); cable reeler (Lalor 1); forklift (Lalor 15); general service truck (Lalor 17; 1901 2); skid steers (Lalor 2); front end loader (Lalor 3; 1901 1); personnel carriers (Lalor 33; 1901 3; WIM 2; 3 Zone 2).
Dome Mountain Mine

British Columbia, Canada · Open Pit

Operating
CopperGold
Opened
2023-12-05
End year
2043
Mine life
21 years
Overview
Long-life open-pit copper-gold operation south of Princeton with stabilization and optimization mine plan post-acquisition.
Production
Avg. Cu ~46,500 tpa (first 5 yrs)
Processing
Crushing, grinding, flotation
Equipment
Mine stabilization equipment mentions only: remobilizing idle haul trucks with fleet ramp-up from 14 to 26 trucks (23 ramped up at time of release); trolley assist haulage; new electric shovel; evaluating trolley-assist haul trucks vs conveying systems for ore/waste movement.
Matawinie Graphite Project

Québec, Canada · Open Pit

Feasibility
Graphite
Opened
2018-07-10
End year
2044
Mine life
25 years
Workforce
~300 (planned)
Overview
Feasibility-stage graphite project by Nouveau Monde Graphite with integrated processing.
Production
Planned graphite concentrate
Processing
Crushing, grinding, flotation (graphite)
Equipment
Haul Truck (Electric) 6900XD (36.3 t payload) 11; Hydraulic Excavator (Electric) JD 870G (4.2 m³ bucket) 2; Production/Pre-shear Drill (Electric) Flexi Roc D60 (140 mm / 114 mm holes) 2; Wheel Loader JD 944 2; Track Dozer JD 850 2; Road Grader JD 872G 1; Utility excavator JD 470G; Mechanics Truck F350 2; Service/Boom Truck 6900XD 1; Pickup Truck Ford F250 (300 kW) 4; Dewatering Pump HL130M (220 kW) 1.
Kemess Underground Project

British Columbia, Canada · Underground

Feasibility
CopperGold
Opened
2016-02-29
Overview
Restart/transition to underground mining leveraging existing Kemess South infrastructure under care & maintenance.
Production
Planned production
Processing
Crushing, grinding, flotation
Equipment
Owner fleet (max units): Jumbo, 2 boom (DD421) x4; Production Drill (DL431) x4; Aries ITH Drill with V30 Reamer (DU 411 – Aries) x1; Emulsion Loader (MC 605 VE) x4; Rockbolter (DS311) x3; Cablebolter (DS421) x2; Shotcrete Sprayer (SS3) x1; Transmixer (TM3) x3; Secondary Breaker, Water Cannon (WC-3) x1; Secondary Breaker, Blockholer (BH-3) x3; Secondary Breaker, Mobile Rockbreaker (RB3) x2; Secondary Breaker, Splitter (DB120) x2; Stationary Rockbreaker at Crushers (MRSTE35) x4; LHD, 3.7 m3, 6.7 t (LH307) x1; LHD, 8.6 m3, 17 t (manual) (LH517) x6; LHD, 8.6 m3, 17 t (automated) (LH517) x8; Haulage Truck, 50 t (TH550) x9; AutoMine System for LHDs (AutoMine LHD) x1; Grader (Veekmas FG 7 C) x1; Scissor Lift (SL3) x3; Boom Truck (BT3) x2; Flat Deck Truck (Toyota Landcruiser) x2; Mechanics Truck (Toyota Hurth) x2; Fuel/Lube Truck (PC3) x1; Personnel Carrier (9 per.) (Toyota Van) x2; Supervisor/Engineering Vehicle (Toyota) x8; Septic Vaccuum Truck x1; Forklift/Telehandler (535-140) x2; Personnel Carrier (16 per.) (FL3) x4; Cassettes System Prime Mover (Multimec MF 100) x2; Contractor fleet (max units): Surface Loader, 7 m3 (Cat966) x1; Surface Truck, 41 t (Cat745C) x4; Scissor Lift x1; Boom Truck x1; Flat Deck Truck x1; Supervisor/Engineering Vehicle x2; Forklift/Telehandler x1.
Page 137 of 147 (3508 total)