← Map view|Directory

Directory

Browse minesites, mining companies and suppliers. Use the tabs below to switch sections.

Minesites Directory

Browse minesites. Each card shows company ownership and their most recent associated articles.

Filter by mine details and commodity attributes.
Page 135 of 147 (3508 total)
Scotia Mine

Nova Scotia, Canada · Underground

Feasibility
LeadZinc
Opened
2020-07-06
End year
2031
Mine life
10 years
Workforce
~450 (planned)
Production
Planned concentrate production
Processing
Crushing, grinding, flotation
Equipment
Komatsu PC1250LC Excavator (2 ops); Komatsu PC490 Excavator w/ Hydraulic Hammer (1 ops); CAT320 Excavator (1 cap); Komatsu HD605 Rigid Frame Haul Truck (4 ops); Komatsu HM400 Articulated Haul Truck (5 ops); Komatsu WA600 Wheel Loader (2 ops); Komatsu WA500 Wheel Loader (1 ops); Komatsu D155AX Dozer (2 ops); CAT16M Grader (1 cap); Komatsu HM400-5 Water Truck (1 ops).
Kami Iron Ore Project

Newfoundland & Labrador, Canada · Open Pit

Feasibility
Iron Ore
Opened
2023-12-22
End year
2048
Mine life
25 years
Workforce
~500 (planned)
Overview
High-grade iron ore project evaluated at PFS level by Champion Iron.
Production
Planned iron ore concentrate
Processing
Crushing, grinding, magnetic separation
Equipment
CAT 793D haul trucks x39; P&H 320XPC production drills x4; Epiroc D65 presplit drill x1; Komatsu PC7000 hydraulic shovels x5; Komatsu WA1200 wheel loaders x5; CAT D11T dozers x5; CAT 16M graders x3; CAT 777G water truck x1; CAT 725C sand truck x2; CAT 854K wheel dozer x1; CAT D8T track dozer x1; Komatsu PC1250 excavator (stockpile reclaim) x1.
McCreedy West Mine

Ontario, Canada · Underground

Under Development
CopperNickel
Opened
2023-12-31
Overview
Updated NI 43-101 Mineral Resource for an existing Cu-Ni mine in Sudbury; no new mine plan or initial CAPEX stated.
Production
No current production
Processing
Crushing, grinding, flotation (conceptual)
Equipment
Boom Truck (BOOM TRUCK MNE BT3) x1; Cassette Carrier (CASSETTE CARRIER MNE CS3-004) x1; Drill (DRILL ATL RB104) x1; Drill (DRILL ATL RB282) x1; Grader (GRADER CAT 135H) x1; Haul Truck (HAUL TRUCK ATL MT436B) x2; Haul Truck (HAUL TRUCK ATL MT5020) x1; Haul Truck (HAUL TRUCK Atlas Copco MT42) x2; Personnel Carrier (PERSONNEL CARRIER IND MINECAT) x1; Personnel Carrier (PERSONNEL CARRIER IND UT99) x4; Pickup Truck (PICKUP TRUCK 1500) x1; Scissor Lift (SCISSOR LIFT MNE SL3) x2; Scooptram (SCOOPTRAM ATL ST1030) x1; Scooptram (SCOOPTRAM ATL ST10300) x1; Scooptram (SCOOPTRAM ATL ST1520) x2; Scooptram (SCOOPTRAM ATL ST7.5Z) x3; Scooptram (SCOOPTRAM ATL ST710) x1; Utility Vehicle (Fuel/Lube Truck) x1; Utility Vehicle (UTILITY VEHICLE IND MINECAT) x1; Utility Vehicle (UTILITY VEHICLE TOYOTA) x1
Macmillan Pass Project

Yukon, Canada · Underground

Feasibility
LeadSilverZinc
Opened
2018-05-23
End year
2031
Mine life
10 years
Workforce
~350 (planned)
Overview
Zinc-lead-silver sediment-hosted project (Tom & Jason deposits).
Production
Planned concentrate production
Processing
Crushing, grinding, flotation
Equipment
Truck (50 t/20.0 m3) x10; LHD (6.7 t/3.0 m3) x2; LHD (14 t/5.4 m3) x10; Jumbo - 2 Boom x4; Bolter x2; Longhole Drill x4; DTH Drill x3; Large Explosives Truck x2; Scissor Lift x1; Shotcrete + Transmixer x1; Jackleg / Stoper x6; Grout Pump x1; Personnel Carrier x1; Fuel / Lube Truck x2; Boom Truck x2; Electrician Truck x2; Grader x2; Utility Vehicle x2; Backhoe x1; Telehandler x1; Mechanics Truck x2; Supervisor Truck x3; FEL (11.5 m3, WA900) x1; Surface Truck (90.0t, 777) x3
Mount Pleasant Property

New Brunswick, Canada · Open Pit

Under Development
TinTungstenZinc
Opened
2012-04-13
Overview
Amended NI 43-101 consolidating MREs; economic studies removed.
Equipment
Conceptual OP fleet
JOY Project

British Columbia, Canada · Open Pit

Under Development
CopperGoldSilver
Opened
2020-04-16
Overview
Porphyry Cu-Au-Ag exploration project in the Toodoggone district.
Equipment
Core drilling (Phase 1: 5,000 m; Phase 2: 12,500 m) supported by geophysical + geochemical + geological surface surveys; helicopter/trail access drilling; diamond saw-cut half-core preparation (core cutting/logging referenced)
Meliadine Gold Project

Nunavut, Canada · Underground

Under Development
Gold
Opened
2015-02-11
End year
2032
Mine life
15 years
Workforce
~1,100 (planned)
Overview
FS-level project at time of report with reserves and capital estimates stated.
Production
Planned
Processing
Crushing, grinding, gravity, CIL
Equipment
Open pit fleet (peak): Haulage truck (65-t class) x6; Front-end loader (11 m³) x3; Hydraulic excavator (10 m³) x2; Hydraulic excavator (15 m³) x1; Dozer (D10 class) x2; Dozer (D8 class) x2; Motor grader (16G class) x2; Drill x2; Rock breaker x1; Crane (60 t) x1; Crane (30 t) x1; Water tanker (50,000 L) x2; Water tanker (25,000 L) x2; Fuel/lube truck (11,500 L) x1; Picker truck (15 t) x1; Telehandler (6 t) x1; Telehandler (10 t) x1; Front end loader (5 m³) x2; 4x4 pickup truck (250) x16; Lowboy carrier (100 t) x1; Dewatering pumps x4; Pit busses x2; Light tower x6 (TOTAL 57); Underground fleet: Truck (60 t) x8; Scooptram (10 t) x5; Jumbo x4; Bolter x2; Auxiliary: Shotcrete sprayer x1; ANFO loader x1; Grout plant x1; Work platform x3; Lube truck x1; Platform truck x2; Fork lift x2; Skid steer x1 (TOTAL 34).
Thorn Project

British Columbia, Canada · Open Pit

Under Development
CopperGoldLeadSilverZinc
Overview
Early-stage project; access described as helicopter-supported.
Equipment
Helicopter-supported exploration access.
Cantung Mine

Northwest Territories, Canada · Underground

Care And Maintenance
Tungsten
Opened
2014-09-19
End year
2022
Mine life
8 years
Overview
Tungsten mine with reserves and cost estimates.
Production
Historical / planned
Processing
Crushing, grinding, flotation
Equipment
Surface: Caterpillar D9 dozers (2); Caterpillar 992K wheel loader (1); Caterpillar 777 haul truck 60 t (1); light trucks (4); service van (1); Caterpillar 14H road grader (1); fuel truck (1); water truck (1); mechanic truck (1); all-terrain forklift (1); telehandler (1). Underground: Scooptram 5 yd³ (6); Scooptram 3.5 yd³ (3); 15 t trucks (2); 30 t trucks (2); jumbo drills (2); long-hole drill (1); bolters (2); shotcrete sprayers (2); scaler (1); cassette mucking unit (1); utility truck (1); service skids (2); pick-ups (2); scissor lift (1); emulsion charging unit (1); personnel carrier (1); fuel/lube vehicles (2).
Cassiar Gold Project

British Columbia, Canada · Underground

Under Development
Gold
Opened
2025-06-08
Overview
Historic high-grade gold camp with multiple past-producing mines and updated MRE.
Processing
Gravity & cyanidation (historic)
Equipment
Hydracore 2000 drill rig; handheld GPS; Reflex EZ-Shot magnetic & gravimetric downhole survey instrument.
New Afton Mine

British Columbia, Canada · Block Cave

Operating
GoldCopperSilver
Companies & ownership
  • New Gold Inc.
    TSX:NGD
Arctic Project (Ambler)

Alaska, USA · Underground

Feasibility
CopperGoldLeadSilverZinc
Opened
2023-01-20
End year
2036
Mine life
12 years
Workforce
~900 (planned)
Overview
Feasibility-stage Cu-Zn-Pb-Au-Ag project with defined LOM and infrastructure plan.
Production
Planned concentrate production
Processing
Crushing, grinding, flotation
Equipment
Haul truck 144 t; Articulated truck 41 t; Hydraulic face shovel 265 t; Excavator 68 t; Wheel loader 124 t; Wheel loader 26 t; Production drill 171 mm; Excavator (support) 35 t; Track dozer 74 t; Rubber tired dozer 50 t; Articulated sand truck 40 t; Motor grader 33 t; Water truck 35,000 L; Fuel/lube truck 40 t
777 Mine

Manitoba, Canada · Underground

Closed
CopperGoldSilverZinc
Opened
2012-10-15
End year
2022
Mine life
18 years
Workforce
~1,000 (historic)
Production
Historical base & precious metal production
Processing
Crushing, grinding, flotation
Equipment
Jumbo (9); Scoop (19); Ore Truck (13); Bolter (5); Man Carrier (41); Scissor Truck (8); Explosives Equipment (6); Backhoe (3); Scalar (1); Front End Loader (4); Forklift (7); Bobcat (4); Lift Truck (2); Grader (2); Alimak (1); Raise Bore (1); Diamond Drill (4); Long Hole Drill (3); Cement Truck (2).
Madsen Gold Project

Ontario, Canada · Underground

Feasibility
Gold
Opened
2025-02-18
End year
2037
Mine life
12 years
Workforce
~500 (planned)
Overview
High-grade underground gold project with updated PFS.
Production
Planned
Processing
Crushing, grinding, gravity, CIL
Equipment
As of Mar 31, 2025 / Steady-state 2026+: 2 Boom Jumbo – Sandvik DD421-60C (Diesel/Electric) 3/3; 1 Boom Jumbo – Sandvik DD311-40 (Diesel) 1/4; 2 or 3 Boom Longtom – Sandvik DL421 (Pneumatic) 0/2; 3 Boom Longtom – Epiroc Boomer 282 (Pneumatic) 2/1; 3 Boom Longtom – Epiroc Boomer 342 (Pneumatic) 1/0; Mechanical Bolter – Sandvik DS411 (Diesel/Electric) 0/5; 14-t Dev LHD – Epiroc MT65 (Diesel) 1/1; 10-t Dev/Prod LHD – Sandvik LH517 (Diesel/Electric) 4/6; 7-t Dev/Prod LHD – Sandvik LH307 (Diesel/Electric) 2/5; 40-t Truck – Sandvik TH550 (Diesel/Electric) 2/2; 30-t Truck – Sandvik TH545 (Diesel) 3/3; 20-t Truck – Sandvik TH540 (Diesel) 1/1; Production Drill (Manual Top Hammer) – Epiroc Simba E7C (Diesel) 3/3; Production Drill (Mechanized Top Hammer) – Epiroc Simba S7C (Electric) 0/1; LHD with Forks (14t) – Epiroc MT65 (Diesel) 1/1; Scissor Lift – Power Climber Falcon 1200 5/5; ANFO Loader (Development) – Epiroc Charmec MC605 (Diesel) 2/2; Boom Truck – Oshkosh S-series 2/2; UG Grader – CAT 160M 1/1; Telehandler – Manitou MHT 790 1/1; Remote Spray Arm (Pneumatic) – Putzmeister H205 1/1; Dry Shotcrete Machine – Putzmeister SP20 2/2; Personnel Carrier – Ford Econoline 4/4; UG Tractor – John Deere 150D 2/2; Service Vehicle – MS9 Truck 2/2; Light Vehicles – Pickup trucks 10/10; Total 56/70.
Sudbury Operations

Ontario, Canada · Underground

Operating
CopperNickelPalladiumPlatinum
Opened
2023-03-23
Production
Ongoing
Processing
Smelting, milling
Equipment
Underground: 2-boom electric hydraulic drill jumbos + 1-boom jumbos; ANFO/emulsion loading vehicles; LHDs 7.2 t & 9 t (plus some 5.4 t units at Totten) + 2.3–3.2 t utility LHDs; haulage trucks 27 t / 36 t / 45 t (incl 6 × 45 t electric trolley trucks at Coleman); support fleet “over 430 units” incl rockbolters, scissor lifts, shotcrete sprayers, shotcrete/cement transporters, mobile rock breakers, utility trucks w/ lifting booms, graders, rail locomotives & ore cars, backhoes, personnel vehicles, fuel trucks; Open pit (Copper Cliff Pit): waste fleet max 22 × 150 t rigid-frame haul trucks; ore fleet max 3 × 61 t rigid-frame trucks; digging fleet: 2 face shovels + a front-end loader + an excavator (7.5–22 yd³ buckets); drill rigs: max 5 blast-hole drills (6-inch bits) + 4 smaller drills (4-inch bits); support: 5 track dozers, 2 rubber-tire dozers, 3 graders, 2 water trucks; plus auxiliary equipment incl fuel/lube trucks, cable reeler, tire manipulator, lowbed, crew cab pickup, mechanic/maintenance/welder trucks, mine rescue truck, ambulance, forklifts, crew buses, dewatering pumps, lighting plants, generators, etc.
Macraes Goldfield

Otago, New Zealand · Underground

Operating
Gold
Opened
2023-12-31
End year
2038
Mine life
15 years
Workforce
~1,400
Overview
Large gold mining complex operated by OceanaGold.
Production
Ongoing gold production
Processing
Crushing, grinding, flotation, CIL
Equipment
Open pit fleet (2024/2025/2026/2027): Excavators – Komatsu PC2000 2/2/2/2; Drill – Montabert CPA 3/2/2/0; Dozer – CAT D10T 2/2/2/2; Grader – CAT 16M 1/1/1/1; Truck – CAT 773E 2/2/1/0; Truck – CAT 785C 6/6/4/3; Truck – CAT 785D 0/0/4/4; Water Cart – Bell B40E 1/1/1/1; Water Cart – CAT 777G 0/0/0/2; Wheel Loader – CAT 992K 1/1/1/1. Underground fleet (2024/2025/2026/2027): Drills – Sandvik DD420/DD421 4/4/1/1; Drills – Tamrock Solo7 2/1/0/0; Long Hole Drill – Sandvik DL432 2/2/1/1; Truck – Sandvik TH550 0/0/4/0; Truck – Sandvik TH551 4/4/0/0; LHD – Sandvik LH517 5/6/3/3; LHD – Caterpillar R2900 5/4/0/0; LHD – Caterpillar R1700 2/2/0/0; Grader – Caterpillar 12H 1/1/1/1; Telehandler – Skyjack VR1056D 2/2/1/1.
Garrison Project

Ontario, Canada · Open Pit

Feasibility
Gold
Opened
2020-11-25
End year
2032
Mine life
11 years
Workforce
~450 (planned)
Overview
PEA-stage gold project with stated initial CAPEX.
Production
Planned
Processing
Crushing, grinding, gravity, CIL
Equipment
Planned open-pit mining equipment (types/capacities only): diesel 165 mm DTH drills (production drilling); diesel RC drills (bench-scale grade control); 12 m³ diesel-hydraulic excavators; 13 m³ wheel loaders; 91 t rigid-frame haul trucks; 36 t articulated trucks; plus ancillary/service equipment and diesel-powered centrifugal pumps for pit dewatering.
Bégin-Lamarche Project

Québec, Canada · Open Pit

Under Development
Iron OrePhosphateTitanium
Opened
2024-09-09
Overview
Phosphate project with magnetite and ilmenite by-products; NI 43-101 Initial MRE stage.
Processing
Crushing, grinding, flotation (apatite)
Equipment
Conceptual open-pit fleet
Selwyn Project (Howard’s Pass / XY West Deposit)

Yukon / Northwest Territories, Canada · Open Pit

Feasibility
LeadZinc
Opened
2012-05-15
Overview
Technical Report report for Selwyn Project.
Cape Ray Gold Project

Newfoundland & Labrador, Canada · Open Pit

Under Development
Gold
Opened
2024-05-26
Overview
Multi-zone orogenic gold project with updated mineral resources.
Processing
Gravity + flotation + cyanidation (testwork)
Equipment
ATV-mounted Winkie drill (top-of-bedrock/C-horizon sampling); RC drill (top-of-bedrock/C-horizon sampling); helicopter- or skid/track-supported diamond drilling; airborne survey (drone); handheld GPS.
Lundberg Deposit

Newfoundland & Labrador, Canada · Underground

Under Development
CopperLeadSilverZinc
Opened
2024-03-12
Overview
VMS base-metal deposit in the Buchans district with updated NI 43-101 MRE.
Equipment
1-Boom Jumbo S1D (1/1); 2-Boom Jumbo M2C (2/2); 2-Boom Jumbo S2C (3/4); Bolter Maclean MEM-928 & MEM975 (8/8); Small Section Bolter Maclean SSB (0/3); Cable Drill Machine Roger (1/1); CMAC SPLH II (1/1); Explosive Vehicle PAUS (1/1); Minecat (1/1); Maclean CS3 (1/3); LHD – 8yd CAT R1700K (1/1); SDK LH514 (3/3); SDK LH515i (2/6); CAT R1700G (3/3); LHD – 11yd CAT R2900G (3/3); Haul Truck 30T CAT AD30 (2/2); Haul Truck 45T CAT AD45 (4/4); SDK TH545I (5/8); Haul Truck 50T TH550B (2/2); Long Hole SDK DU-311 (1/1); CUBEX (contractor) (3/3); LHD – 3yd CAT R1300H (2/3); LHD – 6yd CAT R1600H (3/3); Block Holer Maclean BH3 (1/1); Scissor Lift Maclean SL2/SL3 (6/11); Telehandler Manitou/Bobcat (3/3); Flatbed Boom Truck MacLean BT3 (3/4); Grader CAT MC100 (2/3); Blockholer BH3 (2/2); Cement Mixer MacLean TM3 (4/4); Backhoe CAT420Fit / John Deer 310 (4/4); Shotcrete Sprayer Swatcrete (1/2); Service Truck CS3 (3/3); Mine Rescue PAUS Minca 18 (1/1); Tractor Kubota (35/38); Jeep Toyota (24/33); Surface Front Loader Volvo/Neuson/Komatsu/CAT/Yanmar (8/8).
Macassa mine

Ontario, Canada · Underground

Operating
GoldSilver
Opened
1933-01-01
Workforce
over 1,000 direct jobs
Overview
The Macassa mine is an operational underground gold mine located in Kirkland Lake, northeastern Ontario, Canada. It is 100% owned and operated by Agnico Eagle Mines Limited. The primary commodity is gold, with silver as a by-product. The mine celebrated its 90th anniversary in 2023 and poured its six millionth ounce of gold.
Production
In 2025, production was 312,729 ounces of gold. Guidance for 2026 is a mid-point of 315,000 ounces of gold. As of December 31, 2025, proven and probable gold mineral reserves were 2.2 million ounces of gold.
Processing
conventional crushing, grinding, gravity, cyanidation, and carbon-in-pulp processes with Zadra recovery. Concentrate is melted in an induction furnace to produce doré bars (70-85% gold, 5-10% silver). Mill expansion project includes a new crushing plant, ore storage, a new grinding circuit, and additional leach tanks.
Equipment
battery-electric vehicles (BEVs) underground, five 50-tonne Artisan Z50 battery-powered haul trucks, two Artisan A10 10-tonne loaders, two Artisan Z40 haul trucks, 22 battery-powered LHDs from Epiroc and Artisan, six 20-tonne haul trucks, two production drills, No. 4 Shaft
Companies & ownership
  • Agnico Eagle Mines Limited
    TSX:AEM · NYSE:AEM
Minto Mine South Project

Ontario, Canada · Open Pit

Under Development
Gold
Opened
2018-12-31
Overview
Gold exploration property near Wawa; initial NI 43-101 resource-stage report.
Equipment
Drilling & sampling equipment. handheld GPS; active Rouiller Drilling rig; field portable XRF; magnet; 10% HCl; nail scratch test
Moose River Consolidated Mine

Nova Scotia, Canada · Open Pit

Operating
Gold
Opened
2019-03-25
End year
2033
Mine life
14 years
Workforce
~600
Overview
Multi-pit open-pit gold operation including Touquoy and Beaver Dam deposits.
Production
Active gold production
Processing
Crushing, grinding, CIL
Equipment
Grade control drilling: diesel hydraulic RC drills (144 mm / 5.5” holes); production drilling: diesel hydraulic down-the-hole (DTH) drills (144 mm / 5.5” holes); loading: hydraulic excavators (5.0 m³ bucket) and front-end wheel loaders (7.0 m³ bucket); hauling/support fleet (Touquoy / Beaver Dam / Fifteen Mile Stream / Cochrane Hill): rigid frame haul truck (64 t payload) 5/11/9/13; articulated haul truck (41 t payload) 2/2/2/2; motor grader (4.9 m blade) 1/1/1/1; water/gravel truck 2/2/2/2; track dozer (325 kW) 0/0/2/3; track dozer (233 kW) 3/5/2/2; motor grader (4.3 m blade) 1/1/1/1; water truck (40 m³) 2/2/2/2; wheel loader (4.5 m³) 1/1/1/1; hydraulic excavator (3.0 m³) utility excavator/rock breaker 1/2/2/1; fuel & lube truck 1/2/1/1; shuttle bus 2/2/2/2; pickup trucks (1/4 ton) 8/8/8/8; light plants (20 kW) 9/9/9/9; water pumps (150 m³/h) 2/2/2/2; on-highway dump truck 1/1/1/1; soil compactor (117 kW) 1/1/1/1; emergency response vehicle 1/1/1/1; side-by-side ATV 2/2/2/2; maintenance trucks 1/1/1/1; mobile crane (36 t) 1/1/1/1; float trailer (55 ton) 1/1/1/1; forklift (3 t) 1/1/1/1; mobile steam cleaner 1/1/1/1
Page 135 of 147 (3508 total)