Beaufor Mine

Québec, Canada · Underground

Care And Maintenance
Gold
Opened
2020-12-18
Overview
Historic underground gold mine near Val-d’Or with updated NI 43-101 MRE (Monarch Mining).
Production
No current production
Processing
Crushing, grinding, gravity, cyanidation
Equipment
Underground jumbos, LHDs, haul trucks, mill
Yellowknife Gold Project

Northwest Territories, Canada · Open Pit

Under Development
Gold
Opened
2021-06-09
Overview
Project near Yellowknife, NWT (coords provided in report).
Gemini Lithium Project

Nevada, USA · Open Pit

Under Development
Lithium
Opened
2024-03-08
Overview
Lithium clay/brine MRE; no economic study defining initial CAPEX.
Processing
Testwork only
Equipment
Fleet list provided (underground + open pit): Underground—Volvo A60H haul trucks x6, grader x1, low-profile dozer (CAT D6) x1, workshop service truck (International HV607) x1, scissor lift (Genie GS 4069RT) x1, light vehicles (Ford F150) x4, telehandler (Genie GTH 1056) x1, water truck (Freightliner M2 106) x1, explosive transporter x1, emulsion charger x1, low-profile crane (Power Star) x1, low-profile platform truck (CAT T40) x1; Open pit—drill (Sandvik DS 421) x1, haul trucks (CAT 777G) x3, excavator (CAT 374F) x1, wheel loader (CAT 988K) x1, dozer (CAT D11T) x1, grader (CAT 16M) x1, water truck (Freightliner M2 106) x1, lube truck (International HV607) x1, service truck (Ford F150) x1, forklift/telehandler (CAT TL1255D) x1, light vehicle (Ford F150) x1.
Sisson Project

New Brunswick, Canada · Open Pit

Feasibility
MolybdenumTungsten
Opened
2013-01-22
End year
2039
Mine life
27 years
Overview
Technical Report report for Sisson Project.
Production
Planned production
Processing
crushing, grinding, flotation
Equipment
1 × Dozer (433 kW); 1 × Wheel Dozer (372 kW); 2 × Water Truck (4000 gal); 1 × Water Truck (20000 gal); 2 × Grader (221 kW); 1 × FEL Tire Manipulator; 4 × Light Plant (20 kW); 8 × Crew Cab Pickup; 2 × Service Truck; 2 × Welding Truck; + other pit support items (initial & LOM max explicitly listed)
Mount Alcock Property

British Columbia, Canada · Open Pit

Under Development
LeadSilverZinc
Opened
2012-05-31
Overview
SEDEX Pb-Zn-Ag exploration property (Gunsteel Fm.); no mine plan.
Equipment
Exploration drilling & sampling
New Polaris Gold Project

British Columbia, Canada · Underground

Feasibility
Gold
Opened
2025-07-21
Mine life
8 years
Workforce
161
Overview
Feasibility Study stage underground gold project, owned 100% by Canagold.
Production
Ore production begins Year 1 and continues to Year 9 (relative schedule).
Processing
Crushing/grinding with flotation; BIOX excluded and concentrates intended for sale.
Equipment
Underground Mobile Fleet (Max onsite): 5 trucks; 8 scoops/LHDs; 1 longhole drill; 2 jumbos; 2 bolters; 2 shotcrete sprayers; plus support units (fuel truck, scaler, graders, etc.).
Red Chris Mine

British Columbia, Canada · Open Pit

Operating
CopperGoldSilver
Opened
2015-01-01
End year
2028
Mine life
25 years
Workforce
The mine employs approximately 220 Tahltans. An older source stated nearly 500 people are employed in total.
Production
For the 2024 calendar year, total production was 85,320,618 pounds of copper and 59,811 ounces of gold. Production for the 2023 calendar year was 57,051,467 pounds of copper and 46,046 ounces of gold. Newmont's guidance for 2025 is 88 million pounds of copper and 86,000 ounces of gold.
Processing
The processing plant uses a primary gyratory crusher, a semi-autogenous (SAG) mill, ball mill, and pebble crushing (SABC) comminution circuit. This is followed by a sequential flotation recovery circuit to produce a saleable gold-copper concentrate. The plant will be upgraded to support the underground operation, including a parallel single-stage SAG grinding circuit and additional flotation capacity.
Equipment
The mining fleet includes conventional truck and shovel methods. Specific equipment includes Sandvik Leopard™ DI650i and Sandvik DR412i blasthole drills, P&H 2800 electric cable shovels, and Caterpillar 793 and 785D haul trucks. The future underground block cave operation will require a new fleet of equipment, including jumbos, cablebolters, shotcrete machines, and agitator trucks.
Expansion
A major expansion to an underground block cave operation is being studied and is anticipated to extend the mine's life by more than a decade. A feasibility study for the block cave expansion is expected to be completed in the second half of 2026.
Companies & ownership
  • Imperial Metals Corporation
    TSX:III
Key Lake South (Loki Flake Graphite)

Saskatchewan, Canada · Open Pit

Under Development
Graphite
Opened
2025-04-10
Overview
Initial NI 43-101 Mineral Resource for flake graphite at Loki deposit.
Processing
Conceptual graphite flotation
Equipment
Helicopter access for central/eastern areas; airborne radiometric + electromagnetic (EM) surveys; 2014 HeliFALCON airborne gravity gradiometer survey; regional GeoTEM survey; AeroTEM survey; ground HLEM + magnetic surveys; diamond drilling (2016 program: 26 NQ core holes / 4,553 m); drillhole collar locations checked with a handheld Garmin GPS.
Cigar Lake

Saskatchewan, Canada · Underground

Operating
Uranium
Opened
2015-01-01
End year
2036
Workforce
Around 320 Cameco employees and 325 contractors, with approximately half being northern Saskatchewan residents. Another source states 530 employees.
Overview
The Cigar Lake mine, located in northern Saskatchewan, Canada, is an underground uranium mine operated by Cameco Corporation (54.547% ownership). Discovered in 1981, commercial operation began in 2015. It is known as the world's highest-grade uranium mine.
Production
Total packaged production in 2025 was 19.1 million pounds of U3O8 (100% basis). The 2024 production plan was 18 million pounds (100% basis). Average ore grade is 16.33% U3O8. Reserves as of Dec 31, 2025, were 94.1 million pounds U3O8.
Processing
Ore in slurry form is hauled 70 km to Orano's McClean Lake mill for processing. Mining method employs a jet-boring technique complemented by ground freezing.
Equipment
Underground mine, freezing plants, ore processing and load-out facilities, water treatment systems, mine rock storage pads, two shafts (Shaft 1 and Shaft 2).
Expansion
Cameco plans to begin work to extend the estimated mine life to 2036.
Companies & ownership
  • Cameco Corporation
    TSX:CCO · NYSE:CCJ
Chelopech Mine

Sofia Province, Bulgaria · Underground

Operating
CopperGold
Companies & ownership
  • DPM Metals Inc.
    ASX:DPM
Silvertip Property

British Columbia, Canada · Underground

Feasibility
LeadSilverZinc
Opened
2018-11-01
End year
2022
Mine life
4 years
Workforce
200
Overview
Technical Report report for Silvertip Property.
Production
Ongoing production
Processing
crushing, grinding, flotation
Equipment
7 × LHDs; 4 × Scissor lifts; 1 × Telehandler; 1 × Utility vehicle
Baptiste Nickel Project

British Columbia, Canada · Open Pit

Feasibility
Nickel
Opened
2023-09-06
End year
2056
Mine life
31 years
Workforce
~700 (planned)
Overview
Large-scale awaruite nickel project with PFS and long mine life.
Production
Planned nickel concentrate
Processing
Crushing, grinding, magnetic separation
Equipment
Haul truck fleet 194 t (max 18); Haul truck fleet 289 t (max 16); Diesel hydraulic shovel; Electric hydraulic shovel; Front end loader.
Schaft Creek Project

British Columbia, Canada · Open Pit

Feasibility
CopperGoldMolybdenumSilver
Opened
2021-09-10
Mine life
21 years
Overview
Porphyry Cu–Mo–Au–Ag deposit; proposed large open-pit operation with a 21-year mine life.
Production
Cu–Mo concentrate via flotation (production quantities not captured in this dataset).
Processing
Primary crushing; SAG + ball milling; flotation to produce a bulk Cu–Mo concentrate; concentrate thickening/filtration (with additional precious metal recovery considerations).
Equipment
Rope shovels: 4 (53 m³); Haul trucks: 38 (360 t); Drills: 3 (electric); Dozers: 3; Graders: 4; Water trucks: 3; Fuel/lube trucks: 2; Support/service vehicles (various)
KSM (Kerr-Sulphurets-Mitchell) Project

British Columbia, Canada · Underground

Feasibility
CopperGoldSilver
Opened
2022-08-08
Overview
Large, multi-deposit copper-gold-silver project with PFS/PEA mine plans in NW BC.
Production
Planned production
Processing
Crushing, grinding, flotation
Equipment
Open pit (major equipment, maximum): Primary drill 311 mm electric drill x9; High wall drill 150 mm diesel hydraulic drill x5; Primary shovel 40 m³ diesel hydraulic shovel x3; Primary shovel 56 m³ electric cable shovel x3; Construction FEL 12 m³ x2; Haul truck 360 t x55; Construction haul truck 90 t x3
Kerr-Addison Project

Ontario, Canada · Underground

Feasibility
Gold
Opened
2023-04-30
Overview
Historic gold mine undergoing advanced exploration and technical studies.
Production
No current production
Processing
Conceptual gravity & leach
Equipment
Conceptual underground fleet
Milestone Phase I Potash Project

Saskatchewan, Canada · Solution

Feasibility
Potassium
Opened
2021-11-30
End year
2085
Mine life
60 years
Workforce
~300 (planned)
Overview
NI 43-101 engineering & mine-life review with defined Phase I capital.
Production
Planned
Processing
Solution mining, crystallization
Equipment
Piston injection pumps x9 (Westpower); Plate heat exchangers x2 (Inproheat Industries Ltd); Submerged combustion brine heater x1 (Inproheat Industries Ltd); Hydrocyclone x1 (Weir Minerals); Product centrifuge x1 (Industrial Machine); Rotary dryer x1 (Heyl Patterson); Compactor x1 (Ludman Industries); Dredge x1 (Dredge Yard); Material handling system (Continental Conveyor); Product loadout system (Tundra Process Solutions).
Fording River Coal Operation

British Columbia, Canada · Open Pit

Operating
Coal
Opened
2022-12-31
End year
2043
Mine life
20 years
Workforce
~1,400
Overview
Large-scale metallurgical coal operation operated by Teck Resources.
Production
Continuous coal production
Processing
Coal preparation / wash plant
Equipment
P&H 4800XP AC electric cable shovel (1); P&H 4100XPC electric cable shovels (4); P&H 4100XPB electric cable shovels (2); P&H 4100XP electric cable shovel (1); PC5500 diesel hydraulic shovels (2); LeTourneau L1850 front end loaders (3); Caterpillar 994 front end loaders (3); Komatsu WA 1200-3 front end loader (1); Bucyrus Erie 49R production drills (5); Caterpillar MD6640 production drills (4); Haulpak 830E waste/coal rear dump haul trucks (6); Haulpak 930E rear dump haul trucks (73); Haulpak 980E rear dump haul trucks (9); Caterpillar 797F rear dump haul trucks (8); Caterpillar 794 rear dump haul trucks (6); Hitachi 5000 rear dump haul trucks (4); Bulldozers (23); Graders (11); Backhoes (8); Scrapers (2); Water trucks (7); Rubber tire dozer (5)
Kiena Mine Complex Project

Québec, Canada · Underground

Feasibility
Gold
Opened
2021-04-12
Overview
Prefeasibility study for underground restart/expansion at Val-d’Or.
Production
Planned production
Processing
Crushing, grinding, CIL
Equipment
Underground fleet including haulage and development equipment; quantities specified in PFS equipment schedules. Battery-electric haulage trucks (42-tonne class) – 3 units (planned); other mobile equipment is described at a high level but not itemized into a full make/model fleet list.
Lake Giles Iron Project

Western Australia, Australia · Open Pit

Under Development
Iron Ore (Magnetite)
Mine life
25 years
Overview
The Lake Giles Iron Project is a planned magnetite iron ore project in Western Australia, Australia, approximately 175 kilometres northwest of Kalgoorlie. It is 100% owned by Macarthur Minerals via its subsidiary. A positive feasibility study was completed in March 2022. The project is designed to produce 3 million tonnes per annum (dry basis) of high-grade magnetite concentrate (66.1% iron) over an estimated 25-year mine life.
Production
3 million tonnes per annum (dry basis) of high-grade magnetite concentrate, targeting a grade of 66.1% iron
Processing
conventional crushing and grinding, magnetic separation, reverse flotation
Equipment
hydraulic excavators and rear dump trucks, gyratory crusher, cone crusher, high-pressure grinding rolls (HPGR) unit
Companies & ownership
  • Macarthur Minerals Limited
    ASX:MIO · TSX:MMS · OTC:MMSDF
Kearney Graphite Property

Ontario, Canada · Open Pit

Under Development
Graphite
Opened
2013-08-30
Overview
Flake graphite project with NI 43-101 Mineral Resource; no reserve-backed mine plan.
Processing
Crushing, grinding, flotation
Equipment
Conceptual open-pit fleet
Eskay Creek Project

British Columbia, Canada · Open Pit

Under Development
GoldSilver
Opened
2022-09-06
End year
2039
Mine life
12 years
Workforce
~500 (planned)
Overview
A past-producing mine being redeveloped as a conventional truck and shovel open-pit operation. The project is fully permitted and under construction. Skeena Resources acquired 100% ownership of the project from Barrick Gold in 2020. A Definitive Feasibility Study was completed in November 2023. The project is located in the Golden Triangle region of northwestern British Columbia, within the territory of the Tahltan Nation.
Production
Initial production and cash flow are anticipated in the second quarter of 2027. The mine is projected to produce an average of 260,000 ounces of gold and 7.65 million ounces of silver annually. Other estimates project between 0.20 and 0.25 million ounces of gold and between 5.5 and 7.0 million ounces of silver annually. The processing plant will have the capacity for up to 3.6 million tonnes of ore per year.
Processing
The project will utilise a simplified flowsheet with metallurgical optimisation to produce a gold-silver concentrate on-site. This concentrate will be transported to third-party smelters.
Equipment
Conventional truck and shovel open-pit operation.
Companies & ownership
  • Skeena Resources Limited
    TSX:SKE · NYSE:SKE
Huckleberry Mine

British Columbia, Canada · Open Pit

Care And Maintenance
CopperMolybdenumGoldSilver
Opened
2016-05-11
End year
2017
Mine life
15 years
Workforce
approximately 260 people (when operational), 273 full-time employee equivalents (2016 filing)
Overview
The Huckleberry Mine is an open pit mine in British Columbia, Canada, currently on care and maintenance since August 2016. Imperial Metals Corporation holds 100% ownership. Primary commodities are copper, molybdenum, gold, and silver.
Production
Historical copper production
Processing
crushing, grinding, and flotation
Equipment
trucks and shovels
Expansion
Exploration activities include a 2025 diamond drilling program intersecting copper, molybdenum, silver, and gold mineralisation, with further drilling considered for 2026. Work planned in 2025 to update tailings facility design.
Companies & ownership
  • Imperial Metals Corporation
    TSX:III
TLC Lithium Project

Nevada, USA · Open Pit

Under Development
Gold
Opened
2024-02-07
Overview
Location coordinates provided as project centre.
Valentine Gold Mine

Newfoundland and Labrador, Canada · Open Pit

Operating
Gold
End year
2039
Mine life
14 years
Workforce
During the construction phase in March 2023, 442 people were employed directly or as contractors at the project. By June 2023, this number was 454 employees and contractors. The mine is expected to employ an estimated 522 person-years during peak operation.
Overview
The Valentine Gold Mine is an open-pit mine in central Newfoundland and Labrador, Canada, with 100% ownership by Equinox Gold. It achieved commercial production in November 2025 and is expected to be the largest gold mine in Atlantic Canada. The mine plan is based on three open pits developed from the Marathon, Leprechaun, and Berry mineral deposits.
Production
Expected to produce between 150,000 to 200,000 ounces of gold in 2026. Average annual gold production projected to be 175,000 to 200,000 ounces for the first 12 years of operation.
Processing
conventional milling operation and a carbon-in-leach (CIL) plant
Equipment
Diesel-powered rotary drills with 200 mm bit size for bulk production drilling. Down-the-hole (DTH) drills with 144 mm bit size for selective drilling. 15.5 cubic metre bucket-sized hydraulic excavators and 13 cubic metre bucket-sized wheel loaders for bulk production loading. 12.0 cubic metre bucket-sized diesel hydraulic excavators for selective production loading. 140-tonne and 90-tonne payload rigid-frame haul trucks. 40-tonne articulated trucks for production hauling. Ancillary and service equipment to support mining operations.
Expansion
A Phase 2 expansion is advancing to increase the plant's throughput from 2.5 million tonnes per year to more than 4.5 million tonnes per year, expected to increase annual production by approximately 25% to a range of 225,000 to 250,000 ounces per year.
Companies & ownership
  • Equinox Gold Corp.
    TSX:EQX · NYSE:EQX