Prairie Creek Mine

Northwest Territories, Canada · Underground

Under Development
ZincLeadSilver
Opened
2021-10-15
End year
2044
Mine life
20 years
Workforce
Approximately 300 to 350 people are expected to be employed once the mine is operational. A 2017 technical report estimated 330 direct full-time jobs during operations.
Overview
The Prairie Creek Mine is a high-grade, advanced-stage development project. The site has significant existing infrastructure, including a 1,000 t/d mill and over 5 km of underground workings from development in the early 1980s, though the mine never entered production.
Production
The mine is not yet in production. The company planned to commence operations in the fourth quarter of 2025, subject to financing and the completion of an all-season road. The 2021 PEA projects average annual payable zinc equivalent production of 261 million pounds.
Processing
The process flow-sheet involves crushing, dense media separation (DMS), grinding, and sequential flotation to produce zinc sulphide, lead sulphide, and lead oxide concentrates. A 2021 Preliminary Economic Assessment (PEA) is based on a throughput rate of 2,400 tonnes per day. Tailings from the mill will be used to create paste backfill, which will be placed permanently underground.
Equipment
significant existing infrastructure, including a 1,000 t/d mill and over 5 km of underground workings
Expansion
Development of a 170 km all-season access road (ASR) is critical for the project; Phase 1, a Pioneer Winter Road, was completed in April 2023. Phase 2 construction was planned to commence in 2024. As of mid-2025 reports, the company was finalising the ASR design and updating its feasibility study while addressing regulator feedback.
Companies & ownership
  • Sandstorm Gold Royalties
    TSX:SSL
Akie Project

British Columbia, Canada · Underground

Feasibility
LeadSilverZinc
Opened
2018-06-20
End year
2036
Mine life
18 years
Workforce
~700 (planned)
Overview
Zn-Pb-Ag project with PEA-level economics and capital estimate.
Production
Planned
Processing
Crushing, grinding, flotation
Equipment
UG fleet, concentrator
Point Rousse Project (Pine Cove, Stog’er Tight, Argyle)

Newfoundland and Labrador, Canada · Open Pit

Operating
Gold
Opened
2022-09-30
End year
2023
Workforce
75–90
Overview
Gold operation in the Baie Verte Mining District (NL) with a central processing facility at the Pine Cove Mill.
Production
Commercial production since 2010-09-01; ~12,000–19,000 oz Au/year (typical).
Processing
Pine Cove Mill: concentrator/flotation circuit + Merrill-Crowe gold recovery.
Michelin Uranium Deposit

Newfoundland & Labrador, Canada · Underground

Under Development
Uranium
Opened
2014-06-26
Overview
Updated NI 43-101 Mineral Resource; no mine plan or CAPEX.
Equipment
Conceptual fleet
Julienne Lake Iron Deposit

Newfoundland & Labrador, Canada · Open Pit

Under Development
Iron Ore
Opened
2013-01-01
Overview
Geological study of a large iron deposit; no economic study or CAPEX.
Equipment
Diamond core drilling (2010 program: 42 diamond-drill holes / 9,238.3 m); mechanical trenching (~1,600 m along two grid-line sections); ground magnetometer survey; airborne magnetometer surveys; gravity + total field magnetic (TFM) surveys (incl. surveys over ice).
Elkview Coal Operation

British Columbia, Canada · Open Pit

Operating
Coal
Opened
2022-12-31
End year
2047
Mine life
25 years
Workforce
~1,200
Overview
Major steelmaking coal operation in the Elk Valley, operated by Teck.
Production
Continuous coal production
Processing
Coal washing & blending
Equipment
930E haul trucks (45); 830E haul trucks (5); P&H 4100 XPC shovels (4); P&H 4100 XPB shovels (2); P&H 4100 shovels (1); 24M graders (7); 16M graders (3); production loaders (2); dozers (16); drills (6); backhoes (5)
Kitsault Valley Project

British Columbia, Canada · Underground

Under Development
LeadSilverZinc
Opened
2022-09-28
Overview
Ag-rich VMS/epithermal system; resources only.
Processing
Metallurgical testwork
Equipment
Conceptual UG fleet
Bloom Lake Mine

Québec, Canada · Open Pit

Operating
Iron Ore
Opened
2023-04-01
End year
2043
Mine life
20 years
Workforce
~1,700
Overview
Large-scale iron ore operation producing high-grade concentrate.
Production
Continuous iron ore production
Processing
Crushing, grinding, magnetic separation
Equipment
Hydraulic shovels (CAT 6060 or Terex RH340); wheel loaders (Komatsu WA-1200 and/or LeTourneau L1850 / Komatsu WE1850); haul trucks (CAT 793D/F; CAT 777); drilling rigs; excavators; articulated trucks; bulldozers; graders; utility vehicles.
Magino mine

Ontario, Canada · Open Pit

Operating
GoldSilver
End year
2041
Mine life
20 years
Workforce
Approximately 350 positions (as of Feb 2022 technical report)
Overview
Active open-pit gold and silver mine in Algoma District, Ontario, Canada, 83 km northeast of Wawa. Part of Alamos Gold Inc.'s Island Gold District.
Production
Initially designed for 10,000 tpd throughput, permitted for 35,000 tpd. Q4 2025 open pit mined 14,973 tpd ore; mill processed 8,099 tpd.
Processing
Primary crushing, single-stage semi-autogenous grinding (SAG), gravity recovery circuit, cyanide leach, and carbon-in-pulp adsorption circuit.
Equipment
truck and shovel/loader operations
Expansion
Plans to expand the mill to 20,000 tonnes per day, including construction of a parallel circuit.
Companies & ownership
  • Alamos Gold Inc.
    TSX:AGI · NYSE:AGI
Mount Polley Mine

British Columbia, Canada · Open Pit

Operating
CopperGoldSilver
Opened
1997-01-01
End year
2033
Workforce
As of July 2024, the mine had 343 employees. A community update in the second quarter of 2022 stated the mine would employ approximately 355 people for full-scale operations.
Overview
The mill first commenced operations in 1997. After being placed on care and maintenance in 2019, operations at Mount Polley recommenced in July 2022. In August 2025, the British Columbia government approved a permit for an expansion involving the deepening of the Springer pit and the enlargement of rock-disposal areas. This expansion extends the mine's life to 2033. Mining of the Phase 4 pushback in the Springer Pit was scheduled for completion in February 2026, with the majority of mill feed for 2026 planned to come from the Phase 5 pushback and low-grade stockpiles.
Production
In 2025, the mine produced 30.715 million pounds of copper and 37,555 ounces of gold. This compares to 35.700 million pounds of copper and 39,108 ounces of gold in 2024. The production target for 2026 is 19.0-21.0 million pounds of copper and 40,000-44,000 ounces of gold.
Processing
Ore from the open pits and underground is hauled to a crusher. The processing plant uses crushing, grinding and flotation to produce a concentrate. The concentrate is dewatered using thickeners and pressure filters before being stored for transport. Most of the concentrate is trucked to the Port of Vancouver for transport to smelters in Asia.
Equipment
The mine recently purchased two new Komatsu D375A-8 crawler dozers. The fleet also includes other Komatsu equipment such as D375A-6 crawler dozers, PC3000 and PC4000 series mining excavators, D85PX-18 crawler dozers, and PC400 series excavators.
Expansion
In August 2025, the British Columbia government approved a permit for an expansion involving the deepening of the Springer pit and the enlargement of rock-disposal areas. This expansion extends the mine's life to 2033. Mining of the Phase 4 pushback in the Springer Pit was scheduled for completion in February 2026, with the majority of mill feed for 2026 planned to come from the Phase 5 pushback and low-grade stockpiles.
Companies & ownership
  • Imperial Metals Corporation
    TSX:III
Point Rousse Project

Newfoundland & Labrador, Canada · Open Pit

Operating
Gold
Opened
2021-09-01
End year
2026
Mine life
5 years
Workforce
~250
Production
Intermittent gold production
Processing
Crushing, grinding, gravity, CIL
Equipment
1× 670 GLC Hitachi excavator; 5× 410E JD rock trucks (38 t); 2× Bell 40E trucks (38 t); 1× CAT 740 truck (38 t); 3× 400 JD rock trucks (29 cu yds); 1× 750J JD dozer; 2× CAT 349 excavators (4.1 cu yds); 1× CAT 323 excavator (1.56 cu yds); 1× CAT D6 dozer; 2× rock breakers; 1× 470 GLC JD excavator (3.1 cu yds); 1× 350 JD excavator (1.9 cu yds); 5–7× double tandem trucks (27 t); drills: 2× Sandvik Ranger 900; 1× Atlas Copco ECM-590; 2× Sandvik Ranger 800.
Frotet Gold Project

Québec, Canada · Open Pit

Under Development
Gold
Opened
2020-09-30
Overview
Large greenstone belt gold project in northern Québec; no mine plan defined.
Equipment
Exploration equipment & methods: airborne magnetics/EM (incl. VTEM and MegaTEM II); ground geophysics (magnetics, IP); borehole EM; till/humus geochem sampling; stripping/trenching & sampling; diamond drilling programs.
Pine Point Project

Northwest Territories, Canada · Open Pit

Feasibility
ZincLead
Opened
1964-01-01
End year
1988
Mine life
12 years
Workforce
The project is estimated to create approximately 500 construction jobs and 400 operations jobs. A 2021 presentation mentioned a total of 456 employees during operations and an average of 280 for construction.
Overview
Past-producing zinc and lead mine (1964-1988), currently in feasibility stage. Study expected Q2 2025. Located on the south shore of Great Slave Lake. A 2022 PEA indicated a 12-year mine life; potential new mine operational by 2028.
Production
The historic mine produced over 10 million tonnes of lead and zinc concentrates between 1965 and 1988. A Preliminary Economic Assessment from 2020 projected an average annual production of 327 million pounds of zinc and 143 million pounds of lead over a 10-year mine life.
Processing
The processing method will involve conventional "Full Milling". This is a change from previous plans that included pre-concentration methods like XRF ore sorting and dense media separation. The new approach is expected to improve the overall recovery of zinc and lead and reduce operational risk. Historically, the Pine Point mine produced high-grade, clean zinc and lead concentrates.
Equipment
The mining fleet is expected to include 100-tonne class trucks, hydraulic shovels, and hydraulic excavators.
Expansion
A potential new mine could be operational by 2028.
Companies & ownership
  • Osisko Gold Royalties Ltd.
    TSX:OR · NYSE:OR
Mount Milligan Mine

British Columbia, Canada · Open Pit

Operating
CopperGold
End year
2035
Mine life
22 years
Workforce
Approximately 650 people (end of 2024); supports over 1,000 ongoing jobs (January 2026)
Overview
The Mount Milligan Mine is located in the Omenica Mining Division in North Central British Columbia, Canada, approximately 155 kilometres northwest of Prince George. It is an operating conventional truck-shovel open-pit copper and gold mine.
Production
In 2023, the mine produced 61.9 million pounds of copper and 350,317 ounces of gold. For the full year 2025, the mine produced 147,581 ounces of gold and 50.5 million pounds of copper. In the fourth quarter of 2025, production was 44,105 ounces of gold and 13.0 million pounds of copper.
Processing
Ore is processed through a primary gyratory crusher and a secondary cone crusher, then conveyed to a SAG mill and a ball mill for grinding, creating a slurry. This slurry is piped to flotation cells to float a copper-gold concentrate. A gravity circuit removes coarse gold before the concentrate goes to a thickener and then a pressure filter. Permitted to operate at an average of 60,000 tonnes per day.
Equipment
conventional truck-shovel
Expansion
Received amended environmental assessment and related permits to extend operations to 2035. A Pre-Feasibility Study has outlined a potential mine life extension to 2045. Approvals granted for a 10% expansion in plant throughput, set to begin in 2028.
Companies & ownership
  • Centerra Gold Inc.
    TSX:CG · NYSE:CGAU
Seabee Gold Operation

Saskatchewan, Canada · Underground

Operating
Gold
Opened
1991-01-01
End year
2030
Workforce
410 direct jobs (2023); approx. 360 staff (2020). On-site camp capacity: 251 people.
Overview
The Seabee Gold Operation is a remote, fly-in, fly-out underground gold mine in Saskatchewan, Canada, 125 km northeast of La Ronge. It includes the Santoy underground mine (commercial production since 2014) and the Seabee mill facility. The original Seabee mine operated from 1991 to 2018. Ore from Santoy is hauled 14 km to the Seabee mill.
Production
2023: 90,777 oz gold; 2022: 136,125 oz gold; 2021: 118,888 oz gold; 2020: 81,686 oz gold; 2019: 112,137 oz gold; 2018: 95,602 oz gold. 2024 forecast: 75,000-85,000 oz gold. Estimated mineral reserve (end 2023): 343,000 oz gold.
Processing
Seabee mill uses gravity concentration and cyanide leaching with a carbon-in-pulp circuit to produce gold doré bars. Gravity gold recovery circuit upgraded with a gravity oversize protection screen, two Knelson concentrators, one Acacia intensive leach reactor, and an electrowinning cell.
Equipment
Underground mine equipment fleet, including five 6-cubic-yard LHDs and two 40-tonne haulage trucks.
Companies & ownership
  • SSR Mining Inc.
    TSX:SSRM
Fosterville Gold Mine

Victoria, Australia · Underground

Operating
Gold
Opened
2018-12-31
End year
2029
Mine life
10 years
Workforce
~800
Overview
Ultra-high-grade underground orogenic gold mine operated by Kirkland Lake Gold.
Production
Ongoing gold production
Processing
Crushing, grinding, gravity, flotation, CIL
Equipment
Development—(Sandvik) twin boom jumbos (2), mac bolt (2), LHD (2), trucks (2); Production—(Sandvik) longhole drill (2), LHD (3), trucks (3); Contractor fleet—twin boom jumbos (2), longhole drills (2), LHDs (4), trucks (3), mac bolt (2).
Timmins West Mine

Ontario, Canada · Underground

Operating
Gold
Workforce
approximately 350 personnel, including staff and hourly workers
Overview
Timmins West Mine is an operating underground gold mine located in Timmins, Ontario, Canada. It is owned and operated by Pan American Silver Corp. through its wholly-owned subsidiary, Lake Shore Gold Corporation. Franco-Nevada Corporation holds a 2.25% net smelter returns royalty on the Timmins West Mine. The mine is situated approximately 18 to 20 kilometres west of the city of Timmins in the Cochrane District. The Timmins West Mine is part of the larger Timmins operation, which also includes the Bell Creek mine; both mines supply ore to the Bell Creek mill. The operation consists of three main gold deposits: the Timmins Deposit, the Thunder Creek Deposit, and the 144 Gap Deposit, which are all connected by underground drifts.
Production
The Bell Creek mill has an average throughput of 4,400 tonnes per day. In 2025, the Timmins operation, which includes Timmins West, produced 103,600 ounces of gold.
Processing
The ore is stockpiled and hauled by truck to the Bell Creek mill for processing. The Bell Creek mill is a conventional free milling gold circuit that includes crushing, grinding, leaching, carbon-in-pulp (CIP), stripping, and refining processes.
Equipment
underground mobile equipment fleet includes remote-controlled Load-Haul-Dump (LHD) vehicles and trucks, main production shaft is a 5.5-metre diameter, concrete-lined shaft
Companies & ownership
  • Pan American Silver Corp.
    TSX:PAAS · NYSE:PAAS
  • Franco-Nevada Corporation
    TSX:FNV
Nisk Project

Québec, Canada · Open Pit

Under Development
CobaltCopperNickelPalladium
Opened
2024-01-19
Overview
Ownership/optioning described: Power Nickel exercised option to acquire 50% and intends to bring ownership to 80%.
Equipment
Exploration drilling (surface drillholes used for MRE basis: 117 drillholes).
Vanscoy Mine

Saskatchewan, Canada · Underground

Operating
Potassium
Opened
2024-12-31
End year
2146
Mine life
122 years
Overview
Operating potash mine near Saskatoon, Saskatchewan.
Processing
Potash processing plant
Wheeler River Project

Saskatchewan, Canada · Solution

Under Development
Uranium
Opened
2023-06-23
End year
2043
Mine life
15 years
Workforce
~400 (planned)
Overview
The Wheeler River Project is the largest undeveloped uranium project in the eastern Athabasca Basin. It hosts two high-grade uranium deposits: Phoenix and Gryphon. In February 2026, Denison's Board of Directors approved a Final Investment Decision for the construction of the Phoenix deposit, with site preparation and construction scheduled to begin in March 2026. The Canadian Nuclear Safety Commission (CNSC) issued a licence to prepare the site and construct a mine and mill in February 2026, representing the final regulatory approval needed for construction to commence.
Production
First uranium production from the Phoenix operation is targeted for mid-2028. The project is anticipated to produce an annual average of 9 million pounds of uranium octoxide, with a potential peak production of 12 million pounds per year. Another estimate suggests production could be up to 5,400 tonnes of uranium oxide annually.
Processing
The Phoenix deposit will be mined using the in-situ recovery (ISR) method, the first time this method will be used for a uranium mine in Canada. The Gryphon deposit is subject to a pre-feasibility study for conventional underground mining.
Equipment
6 yd LHD (8); 2 boom Jumbo (2); Boom bolter (2); Mine survey vehicle (1); ITH with compressor (2); Electro/hydraulic production drill (2); Diamond drill + compressor (2); 30 tonne truck (6); 16–17 ton utility vehicle (2); 2 ton utility (Kubota) (5); Scissor lift (1); Transmixer (2); Shotcrete sprayer (2); Telehandler (1); Fuel lube truck (1); Kubota forklift 2.5 t (1); Grader (1).
Companies & ownership
  • Denison Mines Corp.
    TSX:DML · NYSE:DNN
McArthur River Mine

Saskatchewan, Canada · Underground

Care And Maintenance
Uranium
Opened
2018-12-31
End year
2038
Mine life
10 years
Workforce
~700
Overview
World’s highest-grade uranium mine operated by Cameco.
Production
Historical / restart planning
Processing
Slurry to Key Lake mill
Equipment
Underground mobile equipment: Scoops (8yd/6yd/4yd) x9; Mechanized bolters x2; Two boom jumbo drills x2; Cubex long hole drills x2; Cubex freeze drills x4; Raisebore drills x8; Transmixers x2; Shotcrete sprayers x2; Concrete pumps (portable & fixed) x5; AM75 Alpine Miner x1 | Surface mobile equipment: Cement trucks x4; Graders x2; Loaders x3; Dozers x2; Haul trucks x2; Other support equipment mentioned: scissor lifts, loaders, graders, haul trucks, fork lifts, water trucks, vacuum trucks, personnel carriers
Companies & ownership
  • Glencore
Kona Gold Deposit

—, Côte d’Ivoire · Open Pit

Under Development
Gold
Opened
2021-07-31
Overview
Orogenic gold deposit with updated NI 43-101 Mineral Resource; no mine plan defined.
Equipment
Mining fleet/equipment not specified in this technical report (it describes exploration activities and drilling types—reverse circulation (RC) and diamond drilling—but does not provide a mining equipment/fleet list or make/model counts).
Bralorne Gold Project

British Columbia, Canada · Underground

Under Development
Gold
Opened
2023-03-10
Overview
Historic high-grade gold camp with updated NI 43-101 MRE; restart potential.
Equipment
Primary jaw crusher; rock breaker; secondary cone crusher; screen; conveyors; SAG mill; ball mill; flash flotation cell; rougher flotation cells; scavenger flotation cells; cleaner flotation cells; regrind mills; regrind cyclones.
AurMac Property

Yukon, Canada · Open Pit

Under Development
Gold
Opened
2025-08-20
Workforce
49 (camp capacity)
Overview
NI 43-101 Technical Report for the AurMac Property (Mayo Mining District, Yukon Territory, Canada) for Banyan Gold Corp.