← Map view|Directory

Directory

Browse minesites, mining companies and suppliers. Use the tabs below to switch sections.

Minesites Directory

Browse minesites. Each card shows company ownership and their most recent associated articles.

Filter by mine details and commodity attributes.
Page 136 of 147 (3508 total)
Oil Can (Fire Lake North)

Québec, Canada · Open Pit

Under Development
Iron Ore
Opened
2012-08-17
Overview
Iron formation MRE; no mine plan.
Equipment
Conceptual OP fleet
Angilak Property (Lac 50)

Nunavut, Canada · Open Pit

Under Development
Uranium
Opened
2024-11-25
Overview
Uranium-focused property with updated MRE; no mine plan.
Processing
Testwork only
Equipment
Helicopter-supported diamond drilling; handheld scintillometer (Radiation Solutions RS-120); airborne VTEM/Mag survey (MMT)
McIlvenna Bay Project

Saskatchewan, Canada · Underground

Under Development
CopperZincGoldSilver
Commodities, grades and output
YearCommodityAv. GradeOutput
2025Copper1.19 %-
2025Zinc2.18 %-
2025Gold0.41 g/t-
2025Silver14 g/t-
Opened
2025-03-12
End year
2040
Mine life
14 years
Workforce
As of September 2025, there were 800 people on site (167 Foran employees and 633 contractors). In October 2025, the workforce was approximately 803.
Overview
The project is advancing through construction and is entering the commissioning phase, with commercial production anticipated by mid-2026. The project is a copper-zinc-gold-silver rich volcanogenic-hosted massive sulphide (VHMS) deposit.
Production
The facility will produce copper and zinc concentrates, which will also contain gold and silver. A surface ore stockpile is being established ahead of the plant start-up, with approximately 236,000 tonnes stockpiled as of the end of January 2026. The first production stope blast occurred in January 2026.
Processing
The processing plant will use crushing, grinding (including semi-autogenous (SAG) and ball milling), and conventional flotation to produce the concentrates.
Equipment
The mine is being designed to use a fleet of underground battery-electric vehicles (BEVs) to reduce emissions and improve the working environment. The second longhole drill was commissioned in early 2026.
Power sources
HydroelectricGrid
Companies & ownership
  • Foran Mining Corporation
    TSX:FOM
Fenelon Gold Project

Québec, Canada · Underground

Feasibility
Gold
Opened
2025-03-21
End year
2043
Mine life
16 years
Workforce
~700 (planned)
Overview
Advanced underground gold project with 2025 PEA update by Wallbridge.
Production
Planned gold production
Processing
Crushing, grinding, gravity, cyanidation
Equipment
Underground personnel vehicles (pickups, vans, buses); tractors; graders; snow plows; manlifts; fuel truck; service truck; water truck; forklift; crane; ice-maker.
Ashram REE & Fluorspar Project

Québec, Canada · Open Pit

Under Development
Rare Earth Elements
Opened
2024-04-04
Overview
Carbonatite-hosted REE and fluorspar deposit with updated NI 43-101 MRE.
Processing
Crushing, grinding, flotation
Equipment
Conceptual open-pit fleet
Major mine mobile fleet (Table 1-11, “mine equipment fleet by year”): hydraulic shovels (up to 4); front end loaders (up to 2); 250-ton haul trucks (up to 60); blasthole drills (up to 6); D10T track dozers (up to 7); 834K wheel dozers (up to 5); 16M motor graders (up to 5); 777G water trucks (up to 5); 988K FEL (1); 374 excavator (1); CS78 compactor (1)

Arizona, USA · Open Pit

Feasibility
CopperGoldSilver
Opened
2022-05-01
Overview
Large copper development project incorporating multiple porphyry deposits; PEA-level study.
Production
Planned Cu production
Processing
Crushing, grinding, flotation
Equipment
Major mine mobile fleet (Table 1-11, “mine equipment fleet by year”): hydraulic shovels (up to 4); front end loaders (up to 2); 250-ton haul trucks (up to 60); blasthole drills (up to 6); D10T track dozers (up to 7); 834K wheel dozers (up to 5); 16M motor graders (up to 5); 777G water trucks (up to 5); 988K FEL (1); 374 excavator (1); CS78 compactor (1)
Boardwalk Lithium Brine Project

Alberta, Canada · Solution

Under Development
Lithium
Opened
2025-02-20
Overview
Large-scale Devonian lithium brine project utilizing DLE technology; NI 43-101 resource-stage report.
Processing
Direct Lithium Extraction (DLE)
Equipment
ESP pump (REDA 538 SN3600); variable frequency drive (VFD); surface piping/valves/fittings; two 400-bbl upright tanks; downhole pressure & temperature recorders; DLE pilot unit (30 columns) with rotary valve, air agitation, and inline ICP
Whabouchi Lithium Mine (Nemaska Project)

Québec, Canada · Underground

Under Development
Lithium
Opened
2019-05-31
End year
2045
Mine life
26 years
Workforce
~500
Overview
Hard-rock lithium project (spodumene pegmatite) with mine and downstream electrochemical plant.
Production
Planned spodumene concentrate and LiOH production
Processing
Crushing, grinding, spodumene concentration; downstream hydroxide processing
Equipment
20t drill rig (1); 40t truck (2); 50t truck (5); 6-yard shovel (1); 1.5-yard spade (1); D10R dozer (2); grader (1); 8k water truck (1); light truck (2); explosives truck (1). Underground (owner-supplied) – Main ramp entry portal (1); electrical sub station vent 6.5 MVA (1); push-type air ventilator & heater station (1); mine rescue equipment (1); fueling station 20,000 gallons with dispensers (1); oil containers with dispenser (1); greasing station with dispenser (1); CS3 cassette carrier (MacLean) (1); Maxi Loader 5344 (ORICA) (1); EL3 emulsion charger w/ basket (MacLean) (1); ventilation door control (5). Underground (contractor mobile fleet) – cable bolter (1); hydraulic production drill (5); raise drill (2); jumbo drill 2 boom (2); LHD 17 tonnes (7); mine truck 40t (7); roof bolter (2); scissor lift (1); shotcrete sprayer (1); shotcrete mixer (1); loader Cat 988 (1).
Willow Creek Coal Mine

British Columbia, Canada · Underground

Feasibility
Coal
Opened
2010-07-16
End year
2021
Mine life
12 years
Workforce
~300 (planned)
Overview
Metallurgical coal project in the Elk Valley region.
Production
Planned coking coal production
Processing
Coal crushing, washing, blending
Equipment
Track-mounted rotary blasthole drills (251 mm hole size) (5 drills required at peak); hydraulic front shovel (29 m³ bucket); large backhoe (22 m³ bucket); front-end loader (20 m³ bucket); large excavator (12 m³ bucket); haul trucks (227 t for waste; 186 t for coal; plus 132 t truck for haul breaker rejects/coarse coal rejects); support equipment: track dozer (6.4 m blade) (1); track dozers (4.9 m blade) (8); wheel dozer (4.6 m blade) (1); motor grader (7.3 m) (1); motor graders (4.9 m) (2); water trucks (2).
West Gore Sb-Au Project

Nova Scotia, Canada · Underground

Under Development
AntimonyGold
Opened
2022-06-07
Overview
Historic antimony-gold mine with redevelopment potential.
Processing
Conceptual gravity/flotation
Equipment
Exploration/rehab equipment
Tent Mountain Mine Restart

British Columbia, Canada · Open Pit

Feasibility
Coal
Opened
2020-04-29
End year
2030
Mine life
10 years
Production
Planned
Processing
Coal handling / prep
Equipment
22 m³ front shovel loaders (max 2); 12 m³ wheel loaders (max 2); 134-tonne haul trucks for coal w/ coal box (max 2); 181-tonne haul trucks for waste (max 14); rotary tri-cone drills 270 mm (max 4); DTH hammer drills 150 mm (max 2); support: 5.3 m blade track dozers (e.g., Cat D10); 3.1 m³ backhoes (e.g., Komatsu PC800); 4.9 m blade graders (e.g., Cat 16M); 91-tonne / 75,000 L water trucks (e.g., Cat 777F WT).
Marathon Palladium Project

Ontario, Canada · Open Pit

Feasibility
CopperGoldPalladiumPlatinum
Opened
2021-03-03
End year
2037
Mine life
13 years
Workforce
~700 (planned)
Overview
Large PGM-copper project with Feasibility Study completed.
Production
Planned
Processing
Crushing, grinding, flotation
Equipment
Mining Haul Truck (240 t); Diesel Hydraulic Shovel (34 m³); Wheel Loader (17 m³); Production Drill (311 mm); Production Drill (160 mm); Blaster (44 mm); Track Dozer (651 kW); Grader (18’); Wheel Loader (11 m³); Wheel Loader (5 m³); Excavator (49 t); Excavator (55 t); Pick-up Truck; Pick-up Truck Crew Cab; Pick-up Truck Service Body; Service Truck (9 t); Service Truck (19 t); Tire Handler; Cube Van; Lube Truck (18,000 L); Lube Truck (6,000 L); Water Truck (40,000 L); Water Truck (14,000 L); Loader (3 m³); Grader (14’); Bus (60 passenger); Bus (20 passenger).
Kudz Ze Kayah Project

Yukon, Canada · Underground

Feasibility
CopperLeadSilverZinc
Opened
2019-06-30
Overview
High-grade VMS project with FS mine plan and infrastructure.
Production
Planned production
Processing
Crushing, grinding, flotation
Equipment
Open pit (peak fleet): Excavator Hitachi EX3600 x2; Excavator Hitachi EX1900 x1; 140t haul truck CAT 785D x20; 40t haul truck Volvo A40G x4; Dozer CAT D10 x2; Dozer CAT D9 x2; Dozer CAT D6 x1; Compactor CAT 834 x1; Loader CAT 992 x1; Loader CAT 980 x1; Drill rig Epiroc (Atlas Copco) CP56 x1; Drill rig Sandvik DM45 x2 Underground (peak fleet): 2-boom jumbo drill Sandvik DD421 x2; Production drill Sandvik DL311 x2; LHD (17t) Sandvik LH517i x2; Truck (45t) Sandvik TH545i x3; Charge rig Normet Charmec 605 x1; Service vehicle Volvo ITC L90F x1; Grader Cat 12K x1; Fibrecrete sprayer Normet Spraymec SF-050 x1; Fibrecrete transmixer Normet Utimec LF600 x2; Surface agitator truck x3; Light vehicle x13
Canadian Malartic

Quebec, Canada · Open Pit

Operating
GoldSilver
End year
2042
Workforce
In 2025, the Canadian Malartic Complex employed over 1,600 full-time workers, which includes more than 700 Agnico Eagle employees and approximately 950 contractor employees.
Overview
The Canadian Malartic Complex is located in the town of Malartic, in the Abitibi-Témiscamingue region of Quebec, Canada. It is operated by Agnico Eagle Mines Limited, which holds 100% ownership of the project.
Production
For the year 2025, the total production from the Canadian Malartic Complex, including the Odyssey mine, was 642,612 ounces of gold from 20.1 million tonnes of processed ore.
Processing
The ore processing plant has the capacity to process 55,131 tonnes of ore daily. The processing method involves a primary and secondary crushing circuit, followed by a grinding circuit. The milled ore then goes through a leach circuit where gold and silver are dissolved. These precious metals are subsequently recovered using an activated charcoal circuit before being poured into dore bars.
Equipment
mobile equipment fleet consists of more than 100 pieces of equipment. This includes haul trucks with a 218-tonne capacity and shovels with buckets that can hold a 65-tonne load.
Expansion
transitioning to a fully underground operation with the development of the Odyssey mine
Companies & ownership
  • Agnico Eagle Mines Limited
    TSX:AEM · NYSE:AEM
  • Franco-Nevada Corporation
    TSX:FNV
Quintette Restart Project

British Columbia, Canada · Open Pit

Feasibility
Coal
Opened
2025-02-27
End year
2041
Mine life
17 years
Overview
Restart metallurgical coal project near Tumbler Ridge, BC; life-of-mine ~17 years.
Processing
Coal preparation plant (CPP) producing high-quality coal.
Equipment
Drill (6); Shovel (3); Waste Trucks (31); Coal Excavator (2); Backhoes (3); Loader (1); Coal Trucks (3)
Gaspé Copper Project (Mount Copper)

Québec, Canada · Open Pit

Under Development
Copper
Opened
2022-04-12
Overview
Large historic copper system with updated NI 43-101 MRE; no mine plan yet.
Equipment
Exploration/field equipment & methods: Trimble UX5 drone high-resolution orthophoto survey; trenching/stripping and “digging pits”; sample collection/logging (site visit notes).
Yauricocha Mine

Yauyos, Peru · Underground

Operating
CopperGoldLeadSilverZinc
Opened
2016-06-30
End year
2025
Mine life
10 years
Workforce
~1,200
Overview
Polymetallic underground mine producing concentrates.
Production
Ongoing polymetallic production
Processing
Crushing, grinding, flotation
Equipment
Mini Jumbos (7); Jumbos (1); Scooptrams (35); Dump Trucks (2); Utility Trucks (2); Locomotives (23); Mine Cars (237); Total (307).
Arrow Deposit (Rook I Project)

Saskatchewan, Canada · Underground

Feasibility
Uranium
Opened
2021-03-05
Mine life
11 years
Overview
Feasibility-stage Arrow Deposit plan with stated ~11-year production life.
Bracemac-McLeod Mine

Québec, Canada · Underground

Closed
CopperGoldSilverZinc
Opened
2010-09-21
End year
2018
Mine life
8 years
Workforce
~600 (historic)
Overview
VMS zinc-copper-silver-gold mine (Matagami) with completed Feasibility Study.
Production
Historical production
Processing
Crushing, grinding, flotation
Equipment
CAT AD45 underground trucks (8–9); CAT R2900G scooptrams/LHDs (4); CAT R1700G scooptrams/LHDs (2).
Goldboro Project

Nova Scotia, Canada · Underground

Feasibility
Gold
Opened
2021-12-16
End year
2034
Mine life
11 years
Workforce
~500 (planned)
Overview
Feasibility-stage gold project in eastern Nova Scotia.
Production
Planned gold production
Processing
Crushing, grinding, gravity, leaching
Equipment
Owner mine equipment: 180 t excavator x1; 140 t excavator x2; 100 t excavator x1; 90 t excavator x3; 17.3 m³ wheel loader x1; 12.8 m³ wheel loader x1; 4.5 m³ loader/backhoe x1; 100 t (55 m³) off-highway haul trucks x7; 60 t (36 m³) off-highway haul trucks x9; 7.1 m³ ADT x4; 4.5 m³ ADT x2; 165 mm drill x2; 2.4 m³ dozer x2; 20.8 m³ dozer x1; grader (12 ft blade) x1; grader (14 ft blade) x2; water truck x2; fuel truck x2; small excavator x1; plus ancillary/support fleet (e.g., service trucks, pickups, forklift, boom trucks, manlifts, lube truck, etc.).
Marban Gold Project

Québec, Canada · Open Pit

Feasibility
Gold
Opened
2023-10-07
End year
2039
Mine life
15 years
Workforce
~600 (planned)
Overview
Advanced-stage open-pit gold project with PFS-level mine plan.
Production
Planned
Processing
Crushing, grinding, gravity, CIL
Equipment
Production Drill (6⅝") 4; Auxiliary Drill (Pre-Split) 1; Electric Hydraulic Shovel 3; Diesel Hydraulic Excavator 1; Wheel Loader 1; Mining Haul Truck (150 t) 16; Mining Haul Truck (100 t) 6; Track Dozer 8; Motor Grader 2; Water/Sand Truck 1; Wheel Dozer 1.
Florence Copper Project

Arizona, USA · Solution

Under Development
Copper
Opened
2023-03-30
End year
2045
Mine life
22 years
Overview
ISCR copper project with reserve-backed LOM.
Production
Planned
Processing
SX/EW
Equipment
Injection wells (615 gpm); recovery wells (647 gpm); 7 multi-level sampling wells; 41 observation wells; extraction pond; SX/EW plant tank farm (pregnant leach solution tanks; raffinate tanks; rich/lean/spent/strip electrolyte tanks; electrolyte storage tank; tank farm containment & sump equipment; reagent tankage; copper-laden organic storage; stripping system; crud tankage; warehouse & shop building).
Fox Complex

Ontario, Canada · Underground

Operating
GoldSilver
Opened
2021-09-19
Workforce
Recent reports indicate the Fox Complex has faced workforce constraints and has been accelerating hiring efforts and engaging contractors to support operations.
Overview
The Fox Complex, located in the Timmins Gold Mining Camp, consists of the producing Froome underground mine, the Black Fox mine (on care and maintenance), the Stock Mill, and the advanced-stage Grey Fox and Stock development projects. Production from the Froome mine is being transitioned to the Stock mine, which is expected to begin initial production by mid-2026 and achieve commercial production in 2027. The development of the Grey Fox project is also a key part of the company's plan to increase production.
Production
Gold equivalent ounce production from the Fox Complex was 44,450 ounces in 2023 and 30,151 ounces in 2024. For 2025, 23,187 gold equivalent ounces were produced. Production guidance for 2026 is forecast to be between 16,000 and 19,000 gold equivalent ounces. McEwen Mining is targeting a significant production increase at the Fox Complex to between 105,000 and 120,000 gold equivalent ounces by 2030. The combined annual production from the Grey Fox and Stock mines is targeted to be between 75,000 to 90,000 gold equivalent ounces.
Processing
Mined material from the Froome underground mine is hauled by road trucks to the Stock mill. The processing includes a crushing circuit, a grinding circuit with two stages of closed-circuit ball milling, and soluble gold recovery through adsorption on granular activated carbon in CIC, CIL, and CIP trains, with a process efficiency of up to 97%. In 2025, production from the Fox Complex consisted of 98% doré and 2% slag and fine carbon.
Equipment
ITH (2); 2-boom jumbos (2); scissor decks (3); mechanized bolter (1); 4 yd LHD (1); 6 yd LHD (3); 8 yd LHD (2); 30 t trucks (3); 50 t trucks (2).
Expansion
A Pre-feasibility Study for the Grey Fox project, scheduled for release in Q2 2026, will highlight the potential to materially extend the mine life at the Fox Complex. Production from the Froome mine is being transitioned to the Stock mine, which is expected to begin initial production by mid-2026 and achieve commercial production in 2027. The development of the Grey Fox project is also a key part of the company's plan to increase production.
Companies & ownership
  • McEwen Mining Inc.
    TSX:MUX · NYSE:MUX
B26 Project

Québec, Canada · Underground

Under Development
CopperGoldSilverZinc
Opened
2024-11-01
Overview
Cu-Zn-Ag-Au VMS deposit with updated MRE; no economic study.
Equipment
Diamond drilling; Reverse circulation drilling; ground geophysical surveys (EM/Mag, IP/PP); Pulse EM (surface + downhole in drillholes).
Page 136 of 147 (3508 total)