← Map view|Directory

Directory

Browse minesites, mining companies and suppliers. Use the tabs below to switch sections.

Minesites Directory

Browse minesites. Each card shows company ownership and their most recent associated articles.

Filter by mine details and commodity attributes.
Page 75 of 147 (3508 total)
Dixiana Sand Quarry

South Carolina, United States · Quarry

Operating
Silica Sand
Companies & ownership
  • Summit Materials, Inc.
    NYSE:SUM
Black Creek Sand Quarry

South Carolina, United States · Quarry

Operating
Silica Sand
Companies & ownership
  • Summit Materials, Inc.
    NYSE:SUM
Buckhorn Aggregate Quarry

South Carolina, United States · Quarry

Operating
Silica Sand
Opened
2010-01-01
Workforce
22 people
Overview
The facility is a surface quarry producing construction aggregates, including gravel, sand, and crushed stone.
Processing
crushing and screening machinery
Equipment
crushing and screening machinery, mobile equipment such as forklifts
Companies & ownership
  • Summit Materials, Inc.
    NYSE:SUM
PT Tunas Inti Abadi

South Kalimantan, Indonesia · Open Pit

Operating
Coal
Workforce
281 employees (as of 2022)
Overview
An operating coal mine located in the Tanah Bumbu Regency, South Kalimantan, Indonesia, producing coal with low sulfur and ash content under the trademark "The Compliant Coal."
Production
In 2022, coal production reached 4.9 million tons, a decrease from 5.8 million tons in 2021. Annual production capacity is 5 million metric tons.
Processing
barge loading conveyor
Equipment
hauling road of 27 kilometers from the pit to the port and a barge loading conveyor that is 910 meters long with a capacity of 1,500 tons per hour
Companies & ownership
  • PT ABM Investama Tbk
    ASX:ABMM
Obi Island Processing Facility

North Maluku, Indonesia · Processing Facility

Operating
Nickel
Opened
2010-01-01
Processing
Rotary Kiln Electric Furnace (RKEF) technology for saprolite ore into ferronickel; High Pressure Acid Leaching (HPAL) technology for limonite ore into Mixed Hydroxide Precipitate (MHP).
Companies & ownership
  • PT Trimegah Bangun Persada Tbk
PT Karya Tambang Sentosa Concession

North Maluku, Indonesia · Open Pit

Operating
Nickel
Opened
2010-01-01
Companies & ownership
  • PT Trimegah Bangun Persada Tbk
PT Gane Tambang Sentosa Concession

North Maluku, Indonesia · Processing Facility

Under Development
NickelCobalt
Opened
2021-01-01
Overview
PT Gane Tambang Sentosa (GTS) is a nickel mining concession located in Indonesia. The project is operated by PT Trimegah Bangun Persada Tbk (also known as Harita Nickel), which holds a 99.00% ownership interest in the concession.
Processing
High-Pressure Acid Leaching (HPAL) Mixed Hydroxide Precipitate (MHP) refinery and a nickel and cobalt sulfate refinery.
Expansion
Acquisition by PT Trimegah Bangun Persada Tbk on 29 November 2023.
Companies & ownership
  • PT Trimegah Bangun Persada Tbk
PT Obi Anugerah Mineral Concession

North Maluku, Indonesia · Open Pit

Operating
Nickel
Opened
2010-01-01
Companies & ownership
  • PT Trimegah Bangun Persada Tbk
PT Jikodolong Megah Pertiwi Concession

North Maluku, Indonesia · Open Pit

Operating
Nickel
Opened
2010-01-01
Companies & ownership
  • PT Trimegah Bangun Persada Tbk
PT Gane Permai Sentosa Concession

North Maluku, Indonesia · Open Pit

Operating
Nickel
Overview
The PT Gane Permai Sentosa concession operates an open-pit nickel mine on Obi Island, producing saprolite and limonite nickel ores. These ores are supplied as raw materials to the processing facilities of the Harita Nickel group on Obi Island. The concession has a Mining Business Permit (IUP) for an area of 1,276.99 hectares.
Companies & ownership
  • PT Trimegah Bangun Persada Tbk
Loji Mine

South Halmahera Regency, North Maluku Province, Indonesia · Open Pit

Operating
Nickel
Opened
2007-01-01
Overview
The Loji Mine covers 1,276.99 hectares with proven and probable saprolite nickel ore reserves of 13.85 million wmt (1.70% Ni) and limonite nickel ore reserves of 38.47 million wmt (1.12% Ni).
Production
Combined mining production output with Kawasi Mine was 9.34 million wet metric tonnes (wmt) in H1 2023.
Processing
Ore is processed at PT Trimegah Bangun Persada Tbk's facilities on Obi Island using Rotary Kiln Electric Furnace (RKEF) technology for saprolite ores into ferronickel, and a refinery for limonite ores into Mixed Hydroxide Precipitate (MHP), Nickel Sulphate, and Cobalt Sulphate.
Companies & ownership
  • PT Trimegah Bangun Persada Tbk
Kawasi Mine

North Maluku Province, Indonesia · Open Pit

Operating
Nickel
Opened
2010-01-01
Overview
The Kawasi Mine is an active nickel mining operation owned and operated by PT Trimegah Bangun Persada Tbk, part of the Harita Group. It is located in Kawasi Village, Obi subdistrict, South Halmahera Regency, North Maluku Province, Indonesia. All of the company's mining and downstream operations are situated on Obi Island.
Production
Proven and probable saprolite nickel ore reserves of 37.57 million wet metric tonnes (wmt) with 1.76% Ni as of June 2022. Proven and probable limonite nickel ore reserves of 70.82 million wmt with 1.08% Ni as of Sept 2022. Total remaining mine reserves were 84.51 million wmt as of Dec 2022. Mining production output was 9.34 million wmt in H1 2023.
Processing
Saprolite ore is processed into ferronickel in Rotary Kiln Electric Furnace (RKEF) smelters. Limonite ore is used to produce Mixed Hydroxide Precipitate (MHP) via High-Pressure Acid Leaching (HPAL) technology, which can be refined into nickel sulphate and cobalt sulphate.
Companies & ownership
  • PT Trimegah Bangun Persada Tbk
PT Piranti Jaya Utama (PJU)

Central Kalimantan, Indonesia · Open Pit

Operating
Coal
Companies & ownership
  • PT ABM Investama Tbk
    ASX:ABMM
PT Nirmala Coal Nusantara (NCN)

Aceh, Indonesia · Open Pit

Operating
Coal
Companies & ownership
  • PT ABM Investama Tbk
    ASX:ABMM
PT Bara Energi Lestari (BEL)

Aceh, Indonesia · Open Pit

Operating
Coal
Companies & ownership
  • PT ABM Investama Tbk
    ASX:ABMM
PT Mifa Bersaudara

Aceh, Indonesia · Open Pit

Operating
Coal
End year
2035
Workforce
2,920 people as of end of 2023 (2,918 workers in December 2023, with 1,929 local to Aceh).
Overview
Integrated coal mining business in the Aceh Barat (West Aceh) Regency of the Aceh Province, Indonesia, producing sub-bituminous coal known for its low ash and sulfur content. The mine operates under a Production Operation Mining Business License (IUP-OP) covering 3,134 hectares in the Meureubo District.
Production
7.1 million tonnes in 2023; 6.8 million tonnes sales in 2023; average annual production of 4.06 million tons for six years leading up to early 2020.
Processing
Crushing run-of-mine (ROM) coal to 100 mm (lumpy) and 50 mm (fines) at a plant with 2,500 tons per hour capacity. Crushed coal is transported via a 12 km hauling road to a Special Coal Terminal at Peunaga Cut Ujong, then loaded onto barges for transshipment to mother vessels at Anchorage Meulaboh.
Equipment
coal crushing plant, dedicated coal hauling roads, bulk coal loading system, three fixed plant units, one mobile plant crusher
Companies & ownership
  • PT ABM Investama Tbk
    ASX:ABMM
PT Tunas Inti Abadi (TIA)

South Kalimantan, Indonesia · Open Pit

Operating
Coal
Companies & ownership
  • PT ABM Investama Tbk
    ASX:ABMM
Eagle River Complex

Ontario, Canada · Underground

Operating
Gold
Opened
1995-01-01
Workforce
575, including 258 contractors (as of December 31, 2025)
Overview
The Eagle River Complex is operated by Wesdome Gold Mines Ltd. and is located 50 kilometres west of Wawa, Ontario, Canada, within the Mishibishu greenstone belt. The complex consists of the Eagle River Underground Mine and the Mishi Open Pit Mine. The Eagle River mine is an active, producing underground operation, while the Mishi open pit was mined out in 2021.
Production
In 2025, the Eagle River Complex produced 112,767 ounces of gold. The guidance for 2026 projects gold production to be between 105,000 and 115,000 ounces. For the full year 2025, 257,447 tonnes of ore were milled at a head grade of 14.1 grams per tonne.
Processing
Ore from the mine is processed on-site. The processing method involves crushing, grinding, and flotation to produce gold doré bars. The mill has a permitted capacity of 1,200 tonnes per day.
Equipment
highly mechanized, fixed and mobile equipment, leases certain mining equipment
Expansion
A total capital investment of $105 million was planned for 2026, including allocations for deferred development, fixed and mobile equipment, tailings and infrastructure, and delineation drilling. This includes $12 million for improvements to fixed equipment and $10 million for incremental mobile equipment to support higher production rates.
Companies & ownership
  • Wesdome Gold Mines Ltd.
    TSX:WDO
Moss Lake Project

Ontario, Canada · Open Pit

Under Development
Gold
Overview
The Moss Lake Project is a gold exploration and development project located in Ontario, Canada. During its ownership by Wesdome Gold Mines Ltd., the project was not in an operational phase but was the subject of exploration and economic evaluation.
Processing
Carbon-in-Leach (CIL) circuit
Expansion
In 2016, Wesdome consolidated its land position by acquiring adjacent properties, including the historically producing Coldstream Mine, followed by an exploration program in 2017 including drilling.
Companies & ownership
  • Wesdome Gold Mines Ltd.
    TSX:WDO
Kiena Complex

Québec, Canada · Underground

Operating
Gold
Opened
1981-01-01
Workforce
617 people, including 220 contractors (as of December 31, 2025)
Overview
The Kiena Complex is a 100% owned and producing asset of Wesdome Gold Mines Ltd. located in Val-d'Or, Québec, Canada.
Production
Gold production for 2025 was 73,000 ounces. The guidance for 2026 is set at 75,000 to 90,000 ounces of gold. Kiena mill has a permitted capacity of 2,040 tonnes per day. Presqu'île Zone is expected to deliver between 250 and 400 tonnes per day of additional ore.
Processing
Kiena mill has a permitted capacity of 2,040 tonnes per day. The processing of ore involves a conventional milling circuit.
Equipment
paste backfill plant, 930-metre production shaft, ramp system
Expansion
Presqu'île Zone will provide incremental ore to the mill via direct ramp access.
Companies & ownership
  • Wesdome Gold Mines Ltd.
    TSX:WDO
Mishi Open Pit

Ontario, Canada · Open Pit

Closed
Gold
Opened
2002-01-01
End year
2020
Overview
The Mishi Open Pit, also referred to as the Mishi Mine, is located in the province of Ontario, Canada, approximately 50 kilometres west of Wawa. It is a gold commodity mine. The mine is part of Wesdome Gold Mines Ltd.'s Eagle River Complex.
Production
From 2002 to 2012, the pit yielded 20,351 ounces of gold from 200,410 tonnes of ore at a grade of 3.2 grams of gold per tonne. From 2002 to 2019, the mine produced 59,700 ounces of gold from 831,000 tonnes at a grade of 2.2 g/t Au. In 2022, 23,153 tonnes were milled at a head grade of 3.2 g/t. In 2023, 6,150 tonnes were milled at a head grade of 2.3 g/t.
Processing
Ore from the Mishi pit was processed at a central mill located adjacent to the mine. This central processing facility has a permitted capacity of 1,200 tonnes per day. The processing method involves crushing, grinding, and flotation to produce gold doré bars.
Companies & ownership
  • Wesdome Gold Mines Ltd.
    TSX:WDO
Eagle River Underground Mine

Ontario, Canada · Underground

Operating
Gold
Opened
1995-01-01
Workforce
As of December 31, 2025, the workforce at the Eagle River operation totaled 575, including 258 contractors. A news article from August 2025 stated the underground mine and mill employed 532 people, including 182 contractors.
Overview
producing, 100% owned gold mine located in Ontario, Canada. It is situated 50 kilometres west of Wawa, within the Mishibishu greenstone belt. The mine is part of the Eagle River Complex, which also includes the Mishi Open Pit Mine and a common mineral processing facility.
Production
Production guidance for 2026 is between 105,000 and 115,000 ounces of gold. For 2025, the gold production was 113,000 ounces. In 2024, the mine produced 94,561 ounces of gold.
Processing
Ore from the Eagle River Mine is processed at the Eagle River Mill, located 17 kilometres by road from the mine. The mill has a permitted capacity of 1,200 tonnes per day. The processing method employed is the Merrill-Crowe zinc precipitation process. The circuit includes a gravity component, utilizing a Knelson Concentrator, which recovers about 40% of the gold. The ore is considered free of deleterious elements, contributing to historic recoveries of over 96%. The final product is doré bars, which are shipped to the Royal Canadian Mint for final refining.
Equipment
underground mobile mining fleet, as detailed in a March 2016 technical report, included one one-boom jumbo, three two-boom jumbos, a blockholer, four six-yard scooptrams, three four-yard scooptrams, one 3.5-yard scooptram, two two-yard scooptrams, eight haulage trucks, four scissor lifts, and twelve utility vehicles. The mine's hoist has a capacity of approximately 3,100 tonnes per day from a hoisting depth of 420 metres.
Companies & ownership
  • Wesdome Gold Mines Ltd.
    TSX:WDO
PLTM Cicatih (Cicatih Mini Hydro Power Plant)

West Java, Indonesia · Processing Facility

Operating
Overview
The PLTM Cicatih has a capacity of 6.4 MW and has been fully operational since October 2019. The project is part of PT Resource Alam Indonesia Tbk's business diversification into renewable energy.
Production
6.4 MW
Companies & ownership
  • PT Resource Alam Indonesia Tbk
    ASX:KKGI
Rockley Project

New South Wales, Australia · Open Pit

Under Development
GoldCopperZincLeadSilver
Overview
Early-stage exploration project in Central West NSW, Australia, prospective for volcanogenic massive sulphide (VMS), McPhillamys-style gold and base metals, and porphyry gold-copper with associated skarn deposits.
Companies & ownership
  • Alkane Resources
    ASX:ALK · TSX:ALK
Page 75 of 147 (3508 total)