Minesites Directory

Browse minesites. Each card shows company ownership and their most recent associated articles.

Filter by mine details and commodity attributes.
Page 26 of 147 (3508 total)
Lucky Friday

Idaho, United States · Underground

Operating
SilverLeadZinc
Commodities, grades and output
YearCommodityAv. GradeOutput
2025Silver-5300000 oz
2024Silver11.8 oz/t4900000 oz
2024Lead7.6 %31300
2024Zinc3.5 %13500
2022Silver-4410000 oz
2021Silver-3600000 oz
Opened
1942-01-01
Mine life
19 years
Workforce
Workforce: 444 (2025), 431 (2024), 386 (2023), 383 (2022), 353 (2021)
Production
Production overview - 2025: silver 5300000 oz; 2024: silver 4900000 oz.
Processing
The mine has a concentrator facility with a 1,000 tons of ore per day mill that produces silver-lead and zinc concentrates. These concentrates are transported by truck to a smelter in Trail, British Columbia, Canada. For the 2025 reserve calculations, actual metallurgical recoveries were 94.5% for silver, 94.3% for lead, and 85.1% for zinc.
Equipment
Primary access to the mine is via the 6,205-foot-deep Silver Shaft. A key development is the #4 Shaft, an internal shaft which extends 9,600 feet below the surface, providing access to the high-grade Gold Hunter and Lucky Friday Expansion Area deposits.
Expansion
Hecla Mining is investing up to $73 million in the operation. This capital is for underground development, a new tailings facility, and a surface cooling project critical for mining at deeper, hotter levels. The cooling project is expected to be completed by mid-2026. The mine uses a patented Underhand Closed Bench (UCB) mining method, which has significantly improved safety and productivity in the deep, narrow veins. In 2025, 88% of the tons mined were produced using the UCB method.
Companies & ownership
  • Hecla Mining Company
    NYSE:HL
Keno Hill

Yukon Territory, Canada · Underground

Operating
SilverLeadZinc
Commodities, grades and output
YearCommodityAv. GradeOutput
2025Silver36.4 oz/t3020000 oz
2025Lead-3633
2025Zinc-2247
2024Silver-2773873 oz
2024Lead-2930
2024Zinc-1507
2023Silver32 oz/t1502577 oz
2023Lead-1225
2023Zinc-1339
Opened
2023-01-01
Mine life
11 years
Production
Production overview - 2025: silver 3020000 oz, lead 3295.7 t, zinc 2038.5 t; 2024: silver 2773873 oz, lead 2658 t, zinc 1367 t.
Processing
The mine has a fully permitted 400 tonne per day mill that produces silver, lead, and zinc concentrates. The company is working towards a permitted throughput of 440 tons per day over the next couple of years. A backfill plant has been constructed and was being commissioned as of early 2026.
Expansion
Hecla Mining Company is focusing on resource conversion and expansion in the Bermingham Bear Zone. Exploration for 2026 includes three surface diamond drills testing a high-potential vein intersection northeast of the Deep Bermingham ore body. The exploration and pre-development budget for Hecla in 2026 is approximately $55 million, with Keno Hill accounting for 27% of this budget. The company anticipates an additional 50 million ounces of silver potential at Keno Hill. Hecla has a medium-term goal of producing up to 20 million ounces of silver company-wide, with growth fueled by the expansion of Keno Hill.
Companies & ownership
  • Hecla Mining Company
    NYSE:HL
Lucky Friday

Idaho, USA · Underground

Operating
SilverLeadZinc
Companies & ownership
  • Hecla Mining Company
    NYSE:HL
Greens Creek

Alaska, USA · Underground

Operating
SilverGoldLeadZinc
Commodities, grades and output
YearCommodityAv. GradeOutput
2025Silver247.3 oz/t8700000 oz
2025Gold1.94 oz/t59349 oz
2025Lead12.1 %18200 t
2025Zinc22.7 %51300 t
2024Silver-8500000 oz
2024Gold-55275 oz
2023Silver-9700000 oz
2023Gold-60900 oz
2023Lead-19600 t
2023Zinc-51500 t
2022Silver-9740000 oz
2022Gold-48216 oz
2022Lead-19480 t
2022Zinc-52312 t
Opened
1989-01-01
Mine life
13 years
Workforce
512
Production
Production overview - 2025: silver 8700000 oz, gold 59349 oz, lead 18200 t, zinc 51300 t; 2024: silver 8500000 oz, gold 55275 oz.
Processing
The mine uses underground cut-and-fill and long-hole stoping methods. It processes approximately 2,300 tons of ore per day. The facility includes an ore concentrating mill, a dry stacked tailings facility, a ship-loading facility, and camp facilities. A conventional flotation concentrator produces a gravity gold concentrate, a silver concentrate, a zinc concentrate, and a precious metals concentrate.
Expansion
In January 2026, the Greens Creek Surface Exploration Project completed its federal permitting process. This five-year plan for surface exploration aims to increase the mine's reserve base and extend its operational life.
Companies & ownership
  • Hecla Mining Company
    NYSE:HL
Kipushi Zinc Mine

Haut-Katanga province, Democratic Republic of Congo · Underground

Operating
ZincCopperSilverLithium
Commodities, grades and output
YearCommodityAv. GradeOutput
2025Zinc-203168 t
2022Zinc35.34 %-
2022Copper0.8 %-
2022Silver23 g/t-
2022Lithium64 g/t-
Opened
1924-01-01
Production
Production overview - 2025: zinc 203168 t.
Processing
A new concentrator with a capacity of 800,000 tonnes per annum was completed in May 2024 and first concentrate was produced in June 2024. The plant incorporates dense media separation, milling, and flotation. A debottlenecking program was completed in August 2025, increasing the concentrator throughput capacity by 20% to 960,000 tonnes of ore per annum.
Expansion
Ivanhoe Mines and its state-owned partner Gécamines signed a new joint venture agreement in late 2023 to return the mine to production. Construction of the new concentrator began in September 2022. In July 2025, a three-year offtake agreement was signed with Mercuria for up to one-third of the unallocated offtake of zinc concentrate.
Companies & ownership
  • Ivanhoe Mines Ltd.
    TSX:IVN · OTC:IVPAF
  • Gécamines S.A.
Platreef PGM-Nickel Mine

Limpopo province, South Africa · Underground

Operating
PlatinumPalladiumRhodiumNickelGoldCopper
Opened
2025-11-18
Mine life
35 years
Capex (est.)
USD 70.00M
Workforce
over 2,000 employees
Production
The Phase 1 concentrator began operations in late 2025. The first sale of concentrate was completed to Northam Platinum in the fourth quarter of 2025. The concentrator is ramping up and is expected to reach approximately 80% of its nameplate capacity by mid-2026. It is initially processing lower-grade development ore, with higher-grade ore to be introduced in the second quarter of 2026.
Processing
The mine uses a concentrator to process ore. The Phase 1 concentrator has a milling capacity of 770,000 tonnes per annum (ktpa). Development ore is hoisted via Shaft 1 and stockpiled on the surface. The orebody is described as high-grade, thick, and flat-lying, which is suited to large-scale, mechanised mining. The platinum-to-palladium ratio is approximately 1-to-1.
Equipment
The mine's infrastructure includes multiple shafts. Shaft 1 is used for initial hoisting. Shaft 3 is expected to be operational by April 2026, increasing the mine's hoisting capacity five-fold to 5 million tonnes per annum. The larger Shaft 2 is being developed to support future expansions, with hoisting targeted from Q3 2028. The mining method is described as safe, mechanised, and highly productive bulk mining.
Expansion
The mine is being developed in multiple phases. Phase 1 commenced production in Q4 2025. Phase 2 development is underway and is targeted for completion in Q4 2027. This phase includes a new 3.3-million-tonne-per-annum (Mtpa) concentrator module, which will increase total processing capacity to 4.1 Mtpa. The Phase 2 expansion is expected to increase annual production to over 450,000 ounces of platinum, palladium, rhodium, and gold (3PE+Au), plus more than 30 million pounds of nickel and copper. A Preliminary Economic Assessment (PEA) has been completed for a potential Phase 3 expansion to 10.7 Mtpa. This would further increase annual production to over 1.0 million ounces of 3PE+Au, plus approximately 22,000 tonnes of nickel and 13,000 tonnes of copper.
Power sources
Solar
Companies & ownership
  • Ivanhoe Mines Ltd.
    TSX:IVN · OTC:IVPAF
  • ITOCHU Corporation
  • JGC Holdings Corporation
  • Japan Organization for Metals and Energy Security
  • Broad-based Black Economic Empowerment (B-BBEE) structure
Kamoa-Kakula Copper Complex

Lualaba Province, Democratic Republic of Congo · Underground

Operating
Copper
Commodities, grades and output
YearCommodityAv. GradeOutput
2025Copper-388841 t
2024Copper4.46 %437061 t
2023Copper-393551 t
Opened
2021-07-01
Workforce
approximately 6,000 (as of February 2025)
Production
Production overview - 2025: copper 388841 t; 2024: copper 437061 t.
Processing
The complex utilises underground mining and flotation processing with its Phase 1, 2, and 3 concentrators. The Phase 3 concentrator began commercial production in the third quarter of 2024. A new on-site, 500,000 tonnes-per-annum direct-to-blister copper smelter, the largest in Africa, commenced heat-up on 21 November 2025 and produced its first copper anode on 29 December 2025.
Equipment
The mining fleet is undergoing electrification.
Expansion
The mine plan for 2026 and 2027 has been refocused on developing long-term infrastructure to support future productivity. The company now targets annualised copper production to exceed 500,000 tonnes from 2028 onwards. A March 2026 technical report outlines a Mineral Reserve of 0.5 billion tonnes at a grade of 2.82% copper and an Indicated Mineral Resource of 1.3 billion tonnes at a grade of 2.65% copper, which supports a multi-decade mine life and a potential Phase 4 expansion. Capital expenditure guidance for 2026 is between $1.10 billion and $1.40 billion, which includes underspend from 2025. Capital expenditure guidance for 2027 is set at $750 million to $950 million.
Power sources
Hydroelectric
Companies & ownership
  • Ivanhoe Mines Ltd.
    TSX:IVN · OTC:IVPAF
  • Zijin Mining Group
  • Crystal River Global Limited
  • Government of the Democratic Republic of Congo
Forrestania Nickel Operation

Western Australia, Australia · Processing Facility

Care And Maintenance
Nickel
Commodities, grades and output
YearCommodityAv. GradeOutput
2024Nickel-7571 t
End year
2024
Workforce
By 2010, the Forrestania Operation employed almost 300 people, and this number rose to over 500 by 2013. More recent workforce figures have not been found.
Overview
The Forrestania Operation is located 400 kilometres east of Perth in Western Australia. Production at the site ceased in September 2024, and it was transitioned to care and maintenance. The operation includes the Flying Fox and Spotted Quoll underground mines and the Cosmic Boy processing facility.
Production
Production overview - 2024: nickel 7571 t.
Processing
The ore is treated at the Cosmic Boy Concentrator. The process includes primary crushing, conveying, coarse ore storage, and SAG milling incorporating flash flotation to produce a nickel concentrate. The concentrate is then dewatered through thickening and filtration. The plant was originally designed for a throughput of 250,000 tonnes per annum, with provisions to expand to 650,000 tpa. The capacity was later stated as 550,000 tpa.
Companies & ownership
  • IGO Limited
    ASX:IGO
Lake Mackay Project

Western Australia, Northern Territory, Australia · Open Pit

Under Development
CopperZincSilverGoldCobaltNickel+1
Commodities, grades and output
YearCommodityAv. GradeOutput
2023Copper1.14 %3.3
2023Zinc0.97 %3.3
2023Silver9.1 g/t3.3
2023Gold0.26 g/t3.3
2022Copper0.23 %-
2022Zinc0.35 %-
2022Silver1.2 g/t-
2022Gold2.59 g/t-
2021Copper3.03 %17.47
2021Gold1.78 g/t17.47
2021Silver14 g/t17.47
2020Gold1.5 g/t16
2019Copper0.84 %14
2019Gold4.9 g/t8
2019Silver4.1 g/t14
2019Cobalt0.6 %4
2019Nickel0.49 %4
2017Copper0.8 %11.4
2017Gold7.9 g/t11.4
2017Silver20.7 g/t11.4
2017Zinc1.1 %11.4
2017Lead0.5 %11.4
2017Cobalt0.1 %11.4
2015Copper3.2 %7
2015Gold3.3 g/t7
2015Silver37.7 g/t7
2015Lead0.9 %7
2015Zinc1.3 %7
2015Cobalt0.08 %7
Overview
The Lake Mackay Project is a large-scale, underexplored tenement package considered prospective for a range of deposit styles, including copper-gold-silver, nickel-cobalt-manganese, and orogenic gold. Exploration activities, including drilling, are ongoing. In May 2022, IGO and Prodigy Gold restructured their agreement, resulting in Prodigy Gold holding a majority interest in the gold tenements, while IGO retains the majority share of the base metal tenements. Recent exploration has focused on several prospects, including Phreaker (copper-gold), Arcee (gold), and Goldbug (gold). Drilling at the Phreaker prospect in 2022 and 2023 returned encouraging polymetallic results.
Companies & ownership
  • IGO Limited
    ASX:IGO
  • Prodigy Gold NL
    ASX:PRX
  • Castile Resources Pty Ltd
Paterson

Western Australia, Australia · Underground

Under Development
CopperGold
End year
2025
Overview
IGO Limited withdrew from a farm-in agreement with Antipa Minerals, effective 30 April 2025, returning 100% ownership of the 1,520 square kilometre Paterson Project to Antipa. This project surrounds Antipa's flagship Minyari Dome Project. Following the withdrawal, Antipa consolidated its landholding in the Paterson Province to approximately 4,060 square kilometres, now referred to as the Minyari Project. The project is prospective for gold and copper deposits. An upcoming 2025 drilling program will focus on priority targets.
Companies & ownership
  • IGO Limited
    ASX:IGO
  • Cyprium Metals Ltd.
  • Antipa Minerals Ltd.
Fraser Range

Western Australia, Australia · Open Pit

Under Development
NickelCopperCobalt
Companies & ownership
  • IGO Limited
    ASX:IGO
Copper Wolf Project

Arizona, United States of America · Underground

Under Development
CopperMolybdenum
Commodities, grades and output
YearCommodityAv. GradeOutput
2023Copper0.4 %-
2023Molybdenum0.06 %-
Overview
The Copper Wolf Project is a copper-molybdenum exploration project in Arizona, USA, targeting underground bulk mineable mineralisation within a prolific porphyry copper belt. IGO Limited has consolidated 100% ownership of the central project area (~12.5km2).
Equipment
Diamond drilling rigs (including larger rigs with greater technical and depth capabilities), HQ (63.5mm width) core size.
Companies & ownership
  • Buxton Resources
  • IGO Limited
    ASX:IGO
Cosmos Project

Western Australia, Australia · Underground

Care And Maintenance
Nickel
Commodities, grades and output
YearCommodityAv. GradeOutput
2024Nickel-295000 t
Capex (est.)
USD 78.00M
Workforce
Approximately 400 IGO employees and contractors, including 179 from Perenti/Barminco, prior to care and maintenance transition.
Overview
IGO Limited transitioned the Cosmos Project into care and maintenance by June 2024 due to reduced mine life, delays in reaching full capacity, increased costs, and deteriorating commodity prices. IGO plans to restart operations if market conditions improve.
Production
Production overview - 2024: nickel 295000 t.
Processing
Processing existing ore from the run-of-mine (ROM) pad. Operations restarted on 6 November 2023 and ceased on 22 May 2024.
Expansion
Concentrator upgrade finalised at $78 million, increasing capacity to 1.1 Mtpa. Included new primary, secondary, and tertiary crushing and screening circuits, a new primary mill, refurbished secondary and regrind mills, and new and refurbished flotation and thickening circuits.
Companies & ownership
  • IGO Limited
    ASX:IGO
Kwinana Lithium Hydroxide Refinery

Western Australia, Australia · Processing Facility

Operating
Lithium
Commodities, grades and output
YearCommodityAv. GradeOutput
2025Lithium-6782 t
2024Lithium-3508 t
2023Lithium-1884 t
Opened
2021-01-01
Workforce
175 permanent staff once fully operational
Overview
The Kwinana Refinery is a downstream processing facility designed to convert spodumene concentrate from Greenbushes into battery-grade lithium hydroxide. It has faced operational challenges and is subject to ongoing discussions between the joint venture partners to determine its optimal pathway.
Production
Production overview - 2023: lithium 1884 t.
Processing
The refinery converts spodumene concentrate into battery-grade lithium hydroxide. The process involves a 2-stage cyclone preheater rotary kiln with an indirect rotary cooler. It also includes filtration and cake washing of by-products. The facility is one of the first fully automated battery-grade lithium hydroxide facilities globally. Train 1 has a nameplate capacity of 24,000 tonnes per annum.
Equipment
The plant includes pyroprocessing equipment from FLSmidth, such as a 2-stage cyclone preheater rotary kiln, an indirect rotary cooler, and a natural gas-fired kiln burner. The filtration circuit, supplied by TH, includes seven APN18 L filter presses, slurry pumps, and hydraulic units. The electrical, instrumentation, and controls package included multiple substations and extensive cabling.
Expansion
The joint venture partners, IGO and Tianqi Lithium Corporation, have agreed to cease all work and activities on a second production train (Lithium Hydroxide Plant 2).
Companies & ownership
  • Tianqi Lithium Corporation
  • IGO Limited
    ASX:IGO
Greenbushes Lithium Operation

Western Australia, Australia · Open Pit

Operating
Lithium
Commodities, grades and output
YearCommodityAv. GradeOutput
2025Lithium1.9 %1350000 t
Mine life
22 years
Workforce
approximately 1,700
Production
Production overview - 2025: lithium 1350000 t.
Processing
The operation involves traditional drill and blast mining methods. The ore is processed through four plants: a technical grade plant, two chemical grade plants (CGP1 and CGP2), and a tailings retreatment plant. These plants use gravity, heavy media, flotation, and magnetic processes to produce a range of lithium concentrates. A third chemical grade plant (CGP3) commenced commissioning with first ore feed on 18 December 2025.
Equipment
For a crushing and screening project, the contractor utilised a jaw crusher, impact crusher, screener, D10 dozer, 980 loader, 36-tonne excavator, and an 18m radial stacker.
Expansion
The Chemical Grade Plant 3 (CGP3) project, which has a capacity of approximately 500,000 tonnes per annum of spodumene concentrate, commenced commissioning in December 2025. The total project cost for CGP3 is estimated to be approximately $A880 million. A further expansion is proposed to increase waste rock storage and water supply to support increased mining and production rates. This includes the construction of new waste rock landforms and a new mine water supply dam.
Companies & ownership
  • IGO Limited
    ASX:IGO
  • Albemarle Corporation
    NYSE:ALB
  • Tianqi Lithium Corporation
Nova Operation

Western Australia, Australia · Underground

Operating
NickelCopperCobalt
Commodities, grades and output
YearCommodityAv. GradeOutput
2025Nickel-16371 t
2025Copper-7324 t
2025Cobalt-581 t
2024Nickel-20806 t
2024Copper-9922 t
2024Cobalt-735 t
2023Nickel-22915 t
2023Copper-10266 t
2023Cobalt-803 t
2022Nickel1.85 %26675 t
2022Copper0.75 %11483 t
2022Cobalt0.07 %982 t
End year
2026
Workforce
As of 30 June 2022, IGO Limited's total workforce, including employees and contractors, was 741, with 436 being direct employees.
Overview
The Nova-Bollinger deposit is a magmatic nickel-copper-cobalt deposit located in the Fraser Range. It is an underground operation that commenced commercial production in July 2017 and is expected to cease operations by late 2026, with a focus on end-of-life operational phase and subsequent closure.
Production
Production overview - 2025: nickel 16371 t, copper 7324 t, cobalt 581 t; 2024: nickel 20806 t, copper 9922 t, cobalt 735 t.
Processing
The Nova Operation includes a processing facility that produces saleable nickel, copper, and cobalt concentrates.
Equipment
Underground mining services at the Nova Operation are provided by Barminco, a subsidiary of Perenti.
Companies & ownership
  • IGO Limited
    ASX:IGO
Casa Berardi Mine

Quebec, Canada · Open Pit

Operating
GoldSilver
Commodities, grades and output
YearCommodityAv. GradeOutput
2023Gold-90363 oz
2023Silver-22415 oz
2021Gold-134510 oz
Opened
1988-01-01
End year
2037
Mine life
49 years
Workforce
497 people (as of the end of 2023)
Production
Production overview - 2023: gold 90363 oz, silver 22415 oz; 2021: gold 134510 oz.
Processing
mill with a capacity of 3,730 tonnes per day (expandable to 4,400 tonnes per day), crushing, grinding, gravity circuit, carbon-in-leach (CIL) circuit
Equipment
hydraulic excavators, front-end loaders, rigid-frame trucks, articulated trucks
Companies & ownership
  • Hecla Mining Company
    NYSE:HL
  • Orezone Gold Corporation
    ASX:ORE · TSX:ORE · OTC:ORZCF
Silver Valley / Star

Idaho, United States · Underground

Under Development
SilverLeadZinc
End year
1982
Overview
The Silver Valley / Star mine, also known as the Star Mine or historically as the Star-Morning Mine, is a past-producing underground silver, lead, and zinc mine. It was the deepest in the United States, reaching a depth of 7,900 feet. Hecla Mining Company shut down operations in 1982. The mine is currently inactive but considered a pre-development project, with studies initiated in 2011 to evaluate reopening and exploration programs conducted in 2011-2012.
Production
In 2011, drilling resulted in a resource calculation of 3.8 million ounces of silver, in addition to lead and zinc. As of the end of 2025, indicated and inferred resources were reported using a net smelter return cut-off of $280 per ton and a minimum mining width of 4.3 feet, with metallurgical recovery rates of 93% for silver, 93% for lead, and 87% for zinc.
Processing
flotation plant
Companies & ownership
  • Hecla Mining Company
    NYSE:HL
Tiger Deposit

Yukon, Canada · Open Pit

Under Development
Gold
Commodities, grades and output
YearCommodityAv. GradeOutput
2020Gold3.19 g/t464000 oz
Overview
Project Rackla, operated by Hecla Mining Company, is an advanced-stage exploration project located in the Mayo Mining District of central Yukon, Canada. Hecla acquired the project on 7 July 2023, through the acquisition of ATAC Resources Ltd. The project is comprised of a large land package of over 1,700 square kilometres, which includes the Tiger and Osiris deposits.
Production
Production overview - 2020: gold 464000 oz.
Processing
proposed processing method in the PEA included conventional crushing, grinding, and cyanidation by carbon-in-pulp (CIP) to produce gold doré
Companies & ownership
  • Hecla Mining Company
    NYSE:HL
Libby Exploration Project

Montana, United States · Underground

Feasibility
SilverCopper
Commodities, grades and output
YearCommodityAv. GradeOutput
2024Silver1.6 oz/t-
2024Copper0.7 %-
Overview
The Libby Exploration Project is at an exploration and evaluation stage and is not currently an operating mine. Hecla has submitted a Plan of Operations to the U.S. Forest Service for underground exploration and evaluation activities designed to collect data to inform project engineering, environmental requirements, and overall feasibility. The U.S. Forest Service has issued a final decision notice and finding of no significant impact, allowing exploration and data collection to proceed. The proposed exploration project is expected to last for approximately 16 years, a period that includes post-reclamation monitoring.
Companies & ownership
  • Hecla Mining Company
    NYSE:HL
Rock Creek

Montana, United States · Underground

Feasibility
SilverCopper
Commodities, grades and output
YearCommodityAv. GradeOutput
2023Silver1.49 oz/t148291000 oz
2023Copper0.66 %656060
Overview
The Rock Creek project in Sanders County, Montana, was acquired by Hecla Mining Company in 2015. It is currently on hold, with Hecla not actively seeking permits for its construction. In February 2022, the Plan of Operations was withdrawn. The project, which has faced legal challenges, has inferred resources based on a technical report summary.
Production
Production overview - 2023: silver 148291000 oz, copper 595167.5 t.
Companies & ownership
  • Hecla Mining Company
    NYSE:HL
Republic

Washington, United States · Underground

Under Development
GoldSilver
Overview
Hecla Mining Company is actively exploring the Republic project, a gold and silver property in Washington, United States. The project is in the exploration stage, considered an 'emerging opportunity' with 1% of the 2025 exploration budget allocated. Hecla is using modern exploration tools and 3D modelling, yielding high-grade gold intercepts and indicating potential for underground and bulk-tonnage discoveries across 3,583 acres.
Companies & ownership
  • Hecla Mining Company
    NYSE:HL
Hollister

Nevada, United States · Underground

Care And Maintenance
GoldSilver
Opened
1990-01-01
Overview
The Hollister mine is a low-sulphidation, epithermal gold-silver deposit located in Elko County, Nevada, on the Carlin Trend. It is currently on care and maintenance, with exploration advancing on the Hatter Graben vein system.
Expansion
Development of a drift from the Hollister underground workings to the Hatter Graben area commenced in the third quarter of 2018. As of December 2025, state and federal approvals will be required for waste rock and underground water management for any development of the Hatter Graben or other mine expansions.
Companies & ownership
  • Hecla Mining Company
    NYSE:HL
Fire Creek

Nevada, United States · Underground

Care And Maintenance
GoldSilver
Commodities, grades and output
YearCommodityAv. GradeOutput
2017Gold-107143 oz
2017Silver-72283 oz
2016Gold-101286 oz
2016Silver-80593 oz
2015Gold-77055 oz
2015Silver-92114 oz
Overview
The Fire Creek mine, located in Lander County, Nevada, is an underground gold and silver mine wholly owned and operated by Hecla Mining Company. It entered care and maintenance in Q2 2021 after processing remaining ore. The deposit is a low-sulfidation, epithermal gold deposit. Hecla acquired the mine in July 2018. Its future depends on successful exploration and development to justify a restart.
Production
Production overview - 2017: gold 107143 oz, silver 72283 oz; 2016: gold 101286 oz, silver 80593 oz.
Processing
Ore from Fire Creek was shipped to Hecla's Midas mill for gold recovery.
Companies & ownership
  • Hecla Mining Company
    NYSE:HL