Minesites Directory

Browse minesites. Each card shows company ownership and their most recent associated articles.

Filter by mine details and commodity attributes.
Page 56 of 147 (3508 total)
Sunrise Bauxite Project (Binjour)

Queensland, Australia · Open Pit

Under Development
Bauxite
Overview
The Sunrise Bauxite Project aims to extract direct shipping ore (DSO) bauxite for export through the Port of Bundaberg.
Production
The initial development stage is focused on securing permits to extract at least 800,000 tonnes of DSO bauxite. The project has a JORC-compliant resource of 37 million tonnes of gibbsite-type metallurgical bauxite.
Processing
The project plan involves the extraction of direct shipping ore (DSO) bauxite for export through the Port of Bundaberg. An updated project design plans to use common user infrastructure at the port, which is expected to reduce capital costs and time to production.
Expansion
A two-stage development program is underway following a strategic investment from GII. Stage 1 involves finalising the mine plan, securing government approvals and land access, and designing port infrastructure. Stage 2 will involve the construction of mine and port infrastructure.
Companies & ownership
  • ABx Group Limited
    ASX:ABX
Temple Bar Rare Earths Discovery

Tasmania, Australia · Open Pit

Under Development
Rare Earth Elements
Overview
A new rare earths province discovered 50 km east of Deep Leads.
Companies & ownership
  • ABx Group Limited
    ASX:ABX
Wind Break Rare Earths Project

Tasmania, Australia · Open Pit

Under Development
Rare Earth Elements
Overview
The Wind Break Rare Earths Project is an emerging ionic adsorption clay-hosted rare earth element discovery in northern Tasmania, located 40-45 km west of Launceston. It is part of a larger project area with Deep Leads and Rubble Mound. ABx Group is developing the project for commercial production of a mixed rare earth carbonate (MREC) from its ionic rare earth resources, leveraging existing infrastructure. The combined JORC-compliant mineral resource is 89 million tonnes, featuring high dysprosium and terbium. Initial drilling confirmed thick, clay-hosted high-grade REE.
Companies & ownership
  • ABx Group Limited
    ASX:ABX
Rubble Mound Rare Earths Project

Tasmania, Australia · Open Pit

Under Development
Rare Earth Elements
Overview
Part of the broader REE discovery in Tasmania and is often mentioned in conjunction with Deep Leads.
Companies & ownership
  • ABx Group Limited
    ASX:ABX
Deep Leads Rare Earths Project

Northern Tasmania, Australia · Open Pit

Under Development
Rare Earth Elements
Overview
The Deep Leads project is located approximately 40 to 50 kilometres west of Launceston in a commercial pine plantation. It is a significant ionic adsorption clay (IAC) rare earths project, a type of deposit that is rare outside of China and can be processed with lower costs. In late 2022, a maiden JORC resource of 3.94 million tonnes averaging 918ppm TREO (total rare earth oxide) was declared. More recent announcements state a JORC-compliant mineral resource of 89 million tonnes across the Deep Leads, Rubble Mound and Wind Break deposits. The project is noted for its high concentration of valuable heavy rare earths dysprosium (Dy) and terbium (Tb).
Production
The company's strategy is to commence commercial production of a mixed rare earth carbonate (MREC) as soon as possible.
Processing
The ionic adsorption clay allows for a low-cost, three-step leaching method using ammonium sulphate. Tests conducted by the Australian Nuclear Science and Technology Organisation (ANSTO) have shown high extraction rates, exceeding 80 per cent. ABx Group has successfully produced a mixed rare earth carbonate (MREC) sample, which is the standard tradable product. This MREC has been validated as high-quality and suitable for commercial processing by the US-based company Rare Earth Technologies Inc. (RETi). ABx and RETi are now in discussions regarding a potential commercial supply agreement.
Expansion
As of March 2026, ABx Group announced the discovery of new areas of high-extraction ionic adsorption clay, which has prompted the move to the project development stage.
Companies & ownership
  • ABx Group Limited
    ASX:ABX
Stibnite Gold Project

Idaho, United States · Open Pit

Under Development
GoldAntimonySilver
Mine life
12 years
Workforce
expected to create an average of approximately 550 jobs in the region during operations
Overview
The project is designed to restore an abandoned mine site while producing gold and the only mined source of antimony in the United States.
Production
The project is expected to produce approximately 450,000 ounces of gold annually over its first four years of production. It holds gold reserves of about 4.8 million ounces. The project is also expected to supply up to 35 percent of U.S. antimony demand during its first six years of operations.
Processing
The plan of operations includes open pits, ore transportation equipment, ore processing facilities, development rock storage facilities, a tailings storage facility, and a water treatment facility. Hatch Ltd. has been selected as the Engineering, Procurement, and Construction Management contractor for the process plant and site infrastructure.
Equipment
ore transportation equipment, ore processing facilities, development rock storage facilities, tailings storage facility, water treatment facility
Expansion
In January 2025, Perpetua Resources received the Final Record of Decision for the project. The last federal permit required, the Clean Water Act Section 404 permit, was issued by the U.S. Army Corps of Engineers in May 2025. Early works construction began in October 2025 after the company posted $139 million in construction phase financial assurance. A final investment decision is expected in the spring of 2026.
Companies & ownership
  • Perpetua Resources Corp.
    TSX:PPTA · NYSE:PPTA
Kainantu Gold Mine

Eastern Highlands province, Papua New Guinea · Underground

Operating
GoldCopperSilver
End year
2034
Workforce
Over 90% of employees and contractors are from Papua New Guinea.
Production
For the year ended December 31, 2025, the Kainantu Gold Mine produced 174,134 ounces of gold equivalent, which comprised 164,484 ounces of gold, 5,942,203 pounds of copper, and 159,309 ounces of silver. The production guidance for 2026 is between 190,000 and 225,000 ounces of gold equivalent.
Processing
The mine utilises a new 1.2 million tonnes-per-annum Stage 3 Expansion Process Plant which achieved its first production in October 2025. This plant produces a gold-copper-silver concentrate. For the year ended December 31, 2025, the mine processed 557,156 tonnes of ore with metallurgical recoveries of 94.7% for gold and 94.5% for copper.
Equipment
The mining fleet is fully mechanised and includes twin- and single-boom jumbos, 1300-1700 class LHDs, and 20-45 tonne trucks. The operation also uses surface trucks with 60-tonne payloads.
Expansion
The mine is undergoing significant expansion. The Stage 2A expansion was completed in May 2023, increasing throughput capacity. The Stage 3 expansion, featuring a new 1.2 million tonnes per annum process plant, was completed and commissioned in late 2025. A Stage 4 expansion is planned for commissioning in the second half of 2027, which is expected to increase throughput to 1.8 million tonnes per annum. The Stage 4 expansion is projected to result in annual production of over 400,000 ounces of gold equivalent.
Companies & ownership
  • K92 Mining Inc.
    TSX:KNT
Gold Bar mine

Nevada, United States · Open Pit

Operating
GoldSilver
Overview
The Gold Bar mine is located in the southern Roberts Mountains on the Battle Mountain-Eureka-Cortez gold trend in Eureka County, central Nevada. It is an open-pit, heap leach operation. Commercial production was achieved in May 2019. The objective is to transform the Gold Bar mine into a long-life operation.
Production
In 2025, the Gold Bar mine produced 33,227 ounces of gold. Production guidance for 2026 is between 39,000 and 43,000 gold ounces.
Processing
Ore is mined from open pits and processed via crushing and/or run-of-mine heap leaching. A carbon adsorption-desorption recovery (ADR) plant is used to produce a final gold-silver doré product.
Expansion
The operation is now referred to as the Gold Bar Mine Complex, which includes the main Gold Bar mine and nearby deposits that are being advanced towards production, such as Lookout Mountain, Windfall, and Trinity Ridge. McEwen Mining is actively exploring and consolidating the land package around the Gold Bar Mine Complex, acquiring Timberline Resources Corporation in August 2024 and announcing an agreement to acquire Golden Lake Exploration Inc. in January 2026.
Companies & ownership
  • McEwen Mining Inc.
    TSX:MUX · NYSE:MUX
El Gallo mine

Sinaloa, Mexico · Open Pit

Under Development
GoldSilver
Mine life
10 years
Overview
Reactivation. Active mining and crushing ceased in mid-2018. Production since has been from residual leaching. The mine is now being redeveloped under the "Fenix Project". An extension for the Environmental Impact Assessment was granted in December 2025, allowing for the commencement of Phase 1 mill construction.
Production
Phase 1 is projected to produce approximately 20,000 gold equivalent ounces annually once commercial production is achieved. The first gold pour is anticipated in mid-2027. In 2025, production from residual activities was 1,152 gold equivalent ounces. From 2012 until mining ceased in 2018, the mine produced 279,000 ounces of gold and 134,000 ounces of silver.
Processing
The redevelopment includes constructing a new mill to reprocess material from the historical heap leach pad in Phase 1. A ball mill has been purchased and is on-site. Phase 2 will transition to processing in-situ silver deposits.
Expansion
The mine is undergoing a two-phased redevelopment known as the Fenix Project. Phase 1 involves the construction of a mill to reprocess the heap leach material, with construction scheduled to start in mid-2026. The remaining capital expenditure for this phase is an estimated US$25 million. Phase 2 will focus on the in-situ silver deposits, including the El Gallo Silver, Palmarito, and El Gallo deep deposits. The company plans to update the resource estimates for El Gallo in 2026.
Companies & ownership
  • McEwen Mining Inc.
    TSX:MUX · NYSE:MUX
Los Azules project

San Juan, Argentina · Open Pit

Under Development
CopperSilverGold
Mine life
21 years
Production
The October 2025 Feasibility Study projects an average annual production of 148,200 tonnes of copper cathode over the life of the mine. For the first five years, production is expected to average 204,800 tonnes per year.
Processing
The project will use heap leaching and a solvent extraction and electrowinning (SX/EW) facility to produce high-purity copper cathodes on site.
Expansion
The project received its Environmental Impact Assessment (EIA) approval for construction and operation in December 2024. In September 2025, the project was admitted to Argentina's Large Investment Incentive Regime (RIGI), providing 30 years of fiscal and legal stability. Construction is targeted to begin in 2027, with first copper production anticipated in 2029 or 2030. The initial capital expenditure is estimated at $3.17 billion. McEwen Copper is planning an Initial Public Offering (IPO) towards the end of 2026 to raise approximately $300 million as part of a larger $4 billion financing package for the project. The operation will be powered by 100% renewable energy. There is potential to extend the mine life by more than 30 years by processing primary sulfide ores with Nuton's technology or a conventional concentrator.
Companies & ownership
  • McEwen Mining Inc.
    TSX:MUX · NYSE:MUX
Fenix Project

Sinaloa, Mexico · Open Pit

Under Development
GoldSilver
Mine life
9.5 years
Overview
The Fenix Project is a redevelopment of McEwen Mining's El Gallo Complex in Sinaloa, Mexico. It involves two phases: Phase 1 reprocesses historical heap leach material, targeting 20,000 gold equivalent ounces annually, with construction starting mid-2026 and first gold pour by mid-2027. Phase 2 will process material from the El Gallo Silver open-pit deposit, projected to produce 4.2 million ounces of silver equivalent annually. The project utilizes existing infrastructure and an in-pit tailings storage method.
Production
Phase 1 is expected to produce approximately 20,000 gold equivalent ounces annually; Phase 2 is projected to produce an average of 4.2 million ounces of silver equivalent annually.
Processing
mill, reprocessing of heap leach material, in-pit tailings storage
Equipment
previously used gold processing plant and associated equipment, including a ball mill
Expansion
Phase 2 will transition to processing material from the open-pit mining of the El Gallo Silver deposit. Work on Phase 2 has commenced, and it could extend the mine's life beyond the initial 10 years.
Companies & ownership
  • McEwen Mining Inc.
    TSX:MUX · NYSE:MUX
Gold Bar mine

Nevada, USA · Open Pit

Operating
Gold
Companies & ownership
  • McEwen Mining Inc.
    TSX:MUX · NYSE:MUX
San José Mine

Santa Cruz, Argentina · Underground

Operating
GoldSilver
Opened
2007-01-01
Mine life
7 years
Workforce
1,788 (including contractors)
Overview
The San José mine is a high-grade underground gold and silver mine located in the Santa Cruz province of Argentina. It is a joint venture owned by McEwen Mining Inc. (49%) and Hochschild Mining plc (51%), with Hochschild acting as the operator. The mine has been in commercial production since 2007.
Production
For 2025, the total production (100% basis) is forecast to be 77,000 ounces of gold and 3.6 million ounces of silver. McEwen Mining's attributable production for 2025 was 58,120 gold equivalent ounces. The forecast for McEwen's attributable production in 2025 is between 59,000 and 64,000 gold equivalent ounces.
Processing
The processing method involves grinding and flotation, with a crushing and processing capacity of 2,000 tonnes per day. Mineralised material is processed at a mill site, producing both doré and concentrate which is then shipped.
Companies & ownership
  • McEwen Mining Inc.
    TSX:MUX · NYSE:MUX
Platteville Pit #115

Colorado, United States · Quarry

Operating
Silica Sand
Equipment
standard mining and processing plant equipment
Companies & ownership
  • Eagle Materials Inc.
Greeley Pit #120

Colorado, United States · Quarry

Operating
Silica Sand
Companies & ownership
  • Eagle Materials Inc.
Skyway Slag Cement LLC

Illinois, United States · Processing Facility

Operating
Opened
1991-01-01
Overview
Manufacturing plant producing Grade 100 slag cement (GGBFS) from granulated blast furnace slag. Capacity exceeds half a million tons per year. Process involves drying, pre-grinding with roll presses, and further grinding in a ball mill. Product stored in silos for shipment by truck, rail, or barge.
Production
in excess of half a million tons of slag cement per year
Processing
granulation and grinding; molten slag from an iron blast furnace is quenched with water to form granules (GBFS), which are then dried, pre-ground, and further ground in a ball mill
Equipment
two high-pressure roll presses, 6,500 horsepower ball mill (15 feet in diameter and 50 feet long), weather-proof silos
Expansion
Eagle Materials acquired Skyway in 2015
Companies & ownership
  • Eagle Materials Inc.
Fairborn Cement Company

Ohio, United States · Processing Facility

Operating
Opened
1924-01-01
Overview
The facility manufactures various Portland and masonry cement products and has been in continuous operation since 1924.
Production
The facility produces multiple types of Portland cement, including Type IL, Type III, and Class A Oil Well Cement. It also manufactures a full line of masonry cements under the "MIAMI" brand name, including Types N, S, and M, as well as coloured masonry cements. Skyway slag cement is also marketed from the facility.
Processing
The facility manufactures various Portland and masonry cement products. The plant has the capacity to grind nearly one million tons of clinker annually.
Equipment
The plant operates one rotary cement kiln. A high-efficiency Finish Mill was installed in 1996.
Expansion
Eagle Materials Inc. acquired the Fairborn plant from a subsidiary of CEMEX S.A.B. de C.V. in a deal announced in September 2016, with the acquisition completed in 2017. The plant has been in continuous operation since 1924 and underwent an upgrade to its Rotary Cement Kiln Production line in 1974.
Companies & ownership
  • Eagle Materials Inc.
Imiter-bis

Drâa-Tafilalet, Morocco · Underground

Under Development
GoldSilverCopperLeadZinc
Overview
The Imiter-bis project, formerly known as the 233263 Permit, is an exploration property situated on Morocco's sub-Atlas range, five kilometres south of the Imiter Silver Mine.
Equipment
diamond drills
Companies & ownership
  • Aya Gold & Silver Inc.
    TSX:AYA
Songwe Hill Rare Earths Project

Phalombe District, Malawi · Open Pit

Under Development
Rare Earth Elements
Mine life
18 years
Overview
The Songwe Hill Rare Earths Project is operated by the Canadian company Mkango Resources Ltd., which holds a 100% interest in the project. It is located in the Phalombe District of south-eastern Malawi, approximately 90 kilometres from the commercial centre of Blantyre. The project is currently in the development phase, with a Definitive Feasibility Study (DFS) updated in March 2026. A mining development agreement between Mkango's subsidiary, Lancaster Exploration Limited, and the Government of Malawi was signed in July 2024, establishing the legal and fiscal framework for the project. The project has been selected as a Strategic Project under the European Union Critical Raw Materials Act.
Production
Planned average production of 5,954 tonnes per year of total rare earth oxides (TREO) for the first five years, and 4,081 tonnes per year for the remainder of the mine life.
Processing
processing plant with a capacity of approximately 1.0 million tonnes of ore per year; output is a purified mixed rare earth carbonate (MREC) with a grade of 55% TREO, depleted in cerium.
Equipment
processing plant with a capacity of approximately 1.0 million tonnes of ore per year; backup solar farm and diesel generators
Expansion
Definitive Feasibility Study (DFS) updated in March 2026; mining development agreement signed in July 2024; selected as a Strategic Project under the European Union Critical Raw Materials Act; initial capital expenditure estimated at US$297.8 million; total investment estimated at around $400 million, with construction targeted for 2027; U.S. International Development Finance Corporation (DFC) provided US$4.6 million in financing in September 2025
Companies & ownership
  • Malawi Government
Malingunde Natural Graphite Project

Central Region, Malawi · Open Pit

Feasibility
GraphiteRutile
Mine life
16 years
Overview
The Malingunde Graphite Project, operated by NGX Limited, was issued a Retention Licence by the Malawi government in January 2024. Located 20km southwest of Lilongwe, a Pre-Feasibility Study outlines a potential open-pit operation.
Production
average annual production of 52,000 tonnes of graphite concentrate over an initial mine life of 16 years.
Processing
The processing plant is designed to treat 600,000 tonnes of ore per year using a froth flotation process to produce a concentrate with 97% purity.
Expansion
NGX will review the 2018 PFS to optimize for the lithium-ion battery anode market and investigate rutile as a co-product. Total capital expenditure was estimated at US$70.4 million in the 2018 PFS.
Companies & ownership
  • Malawi Government
American Gypsum Company LLC - Gypsum Wallboard Plant

Colorado, United States · Processing Facility

Operating
Gypsum
Companies & ownership
  • Eagle Materials Inc.
American Gypsum Company LLC - Georgetown Wallboard Plant

South Carolina, United States · Processing Facility

Operating
Gypsum
Companies & ownership
  • Eagle Materials Inc.
American Gypsum Company LLC - Duke Wallboard Plant

Oklahoma, United States · Processing Facility

Operating
Gypsum
Companies & ownership
  • Eagle Materials Inc.
American Gypsum Company LLC - Bernalillo Wallboard Plant

New Mexico, United States · Processing Facility

Operating
Gypsum
Companies & ownership
  • Eagle Materials Inc.
Page 56 of 147 (3508 total)