Minesites Directory

Browse minesites. Each card shows company ownership and their most recent associated articles.

Filter by mine details and commodity attributes.
Page 35 of 147 (3508 total)
Halls Peak Project

New South Wales, Australia · Underground

Under Development
AntimonyZincLeadCopperSilver
Companies & ownership
  • Critical Resources Limited
    ASX:CRR
Vermillion Bay Project

Ontario, Canada · Open Pit

Under Development
Lithium
Companies & ownership
  • Critical Resources Limited
    ASX:CRR
Whiteloon Prospect

Ontario, Canada · Open Pit

Under Development
Lithium
Companies & ownership
  • Critical Resources Limited
    ASX:CRR
Plaid Prospect

Ontario, Canada · Open Pit

Under Development
Lithium
Companies & ownership
  • Critical Resources Limited
    ASX:CRR
Graphic Lake Project

Ontario, Canada · Open Pit

Under Development
Lithium
Companies & ownership
  • Critical Resources Limited
    ASX:CRR
Mavis Lake Lithium Project

Ontario, Canada · Open Pit

Under Development
Lithium
Companies & ownership
  • Critical Resources Limited
    ASX:CRR
Continental open pit copper mine

Montana, USA · Open Pit

Historic Mine
Copper
Companies & ownership
  • ASARCO LLC
Amarillo Copper Refinery

Texas, USA · Processing Facility

Operating
Copper
Companies & ownership
  • ASARCO LLC
Hayden Smelter and Concentrator

Arizona, USA · Processing Facility

Operating
Copper
Companies & ownership
  • ASARCO LLC
Silver Bell Mine

Arizona, USA · Open Pit

Operating
Copper
Commodities, grades and output
YearCommodityAv. GradeOutput
2020Copper-20400 t
2019Copper-20400 t
2015Copper0.283 %-
Opened
1954-01-01
End year
2034
Mine life
80 years
Workforce
The mine supports more than 600 direct jobs in 2025
Overview
The Silver Bell operations consist of four open pits: North Silver Bell, El Tiro, West Oxide, and East Oxide. The total production from the Silver Bell mining district between 1885 and 2015 was approximately 2.27 billion pounds of copper, 6.6 million pounds of molybdenum, 3.7 million pounds of lead, 40.8 million pounds of zinc, 2,100 ounces of gold, and 5.95 million ounces of silver. As of 31 December 2015, remaining reserves were reported to be 214.4 million tons, with an average grade of 0.283% copper.
Production
Production overview - 2020: copper 20400 t; 2019: copper 20400 t.
Processing
The mine is a leach-only operation. All copper from the pits is extracted from the ore utilising dump leaching and a solvent extraction/electrowinning (SX-EW) plant. The production capacity of the SX-EW plant was expanded to 65 tons per day in 2003.
Expansion
In September 2014, ASARCO LLC acquired the remaining 25% interest in the Silver Bell project from Mitsui Mining for $115.2 million, taking its ownership to 100%. Construction of the Mammoth Wash dump leach pad and leach solution ponds, situated between the West Oxide and El Tiro pits, was finished in January 2017. This facility is designed to treat approximately 80 million tons of copper ore.
Companies & ownership
  • ASARCO LLC
Ray Mine

Arizona, USA · Open Pit

Operating
Copper
Commodities, grades and output
YearCommodityAv. GradeOutput
2016Copper-62 Mlbs
Mine life
50 years
Autonomous haulage
Yes
Workforce
approximately 850 people
Production
Production overview - 2016: copper 62 Mlbs.
Processing
The Ray Mine is an open-pit operation. Ore is processed through crushing, grinding, and flotation at the on-site Ray Concentrator and the nearby Hayden Concentrator to produce copper concentrate. There is also a solvent extraction-electrowinning (SX-EW) plant for copper cathode production from leaching operations. The copper concentrate is transported to the Hayden Smelter.
Equipment
In 2025, the mine began implementing an autonomous haulage system, incorporating 11 new Caterpillar 794 autonomous haul trucks with a payload capacity of 327 tons.
Expansion
ASARCO has a long-term vision to potentially double the capacity of the Ray Mine. In June 2024, the United Steelworkers union members at the Ray Mine approved a new three-year labor agreement, which includes wage increases and improved benefits.
Companies & ownership
  • ASARCO LLC
Mission Mine

Arizona, USA · Open Pit

Operating
Copper
Commodities, grades and output
YearCommodityAv. GradeOutput
2023Copper-126 Mlbs
2012Copper-134 Mlbs
1994Copper0.67 %-
Opened
1961-01-01
End year
2033
Workforce
1,300
Production
Production overview - 2023: copper 126 Mlbs; 2012: copper 134 Mlbs.
Processing
The ore is crushed, ground in a wet process, and then subjected to froth flotation to produce copper and molybdenum concentrates. The concentrates are dewatered and filtered before being sent off-site for further processing.
Expansion
Construction work is ongoing for the tailings pumping system for Tailings Dam 4.
Companies & ownership
  • ASARCO LLC
Bécancour Battery Materials Plant

Québec, Canada · Processing Facility

Under Development
Graphite
Overview
The Bécancour Battery Materials Plant is a key component of Nouveau Monde Graphite's integrated strategy to supply the lithium-ion battery market. The plant will process graphite concentrate from the company's Matawinie Mine. The processes to be carried out at the facility include micronization, spheronization, purification, and coating to produce active anode material. The chosen purification method is aqueous chemical purification. The project is being developed in phases. Phase 1 involved demonstration-scale operations. The commercial-scale Phase 2 development is planned in two stages. In February 2026, Nouveau Monde Graphite acquired a 143,000-square-metre brownfield site with a 22,000-square-metre industrial facility, adjacent to its existing 200,000-square-metre greenfield property in Bécancour. This acquisition is intended to accelerate the development of the first stage of the Phase 2 plant. This initial stage at the brownfield site will be dedicated to producing 13,000 tonnes per annum of active anode material to fulfill an offtake agreement with Panasonic Energy, which will use the material in its battery manufacturing facilities in Nevada and Kansas. A final investment decision for this brownfield development is anticipated in the second half of 2026. The full Phase 2 Bécancour plant is designed to produce 44,100 tonnes per year of active anode material, and also market 14,720 tonnes per year of graphite concentrate and 43,334 tonnes per year of micronized by-product. The battery-grade material will have a minimum purity of 99.90% total carbon. The integrated Matawinie Mine and Bécancour plant projects are expected to create over one thousand jobs. The plant is strategically located in the Bécancour industrial park, which provides access to highways, railways, and port infrastructure.
Production
13,000 tonnes per annum of active anode material (first stage of Phase 2); 44,100 tonnes per year of active anode material (full Phase 2); 14,720 tonnes per year of graphite concentrate (full Phase 2); 43,334 tonnes per year of micronized by-product (full Phase 2)
Processing
micronization, spheronization, purification, and coating to produce active anode material. The chosen purification method is aqueous chemical purification.
Companies & ownership
  • Nouveau Monde Graphite
    TSX:NOU · NYSE:NMG
Matawinie Mine

Québec, Canada · Open Pit

Under Development
Graphite
Commodities, grades and output
YearCommodityAv. GradeOutput
2025Graphite4.28 %0.98 Mt
Mine life
25 years
Workforce
1000+ (projected for the integrated project)
Overview
The Matawinie Mine is a key part of Nouveau Monde Graphite's plan to create a fully integrated battery materials supply chain in North America. Located 120 km north of Montréal, the project is set to be the largest graphite mine in the G7. Construction is expected to begin in the first quarter of 2026, with production commencing by mid-2028. The project has secured a US$335 million debt commitment from Export Development Canada and the Canada Infrastructure Bank. Preparatory work, including the construction of an access road, began in 2021. The mine has been designated as a major project of national interest by the Government of Canada. Long-term offtake agreements are in place for 75% of the mine's future production. The project has agreements with the Atikamekw First Nation of Manawan and the local community of Saint-Michel-des-Saints.
Production
Production overview - 2025: graphite 0.98 Mt.
Processing
The ore will be processed at a concentrator on-site. The process will involve crushing and flotation to produce graphite concentrate. The plant is designed to produce a 97.5% pure concentrate.
Equipment
The mine will use conventional open-pit mining methods including drilling, blasting, loading, and hauling. An all-electric fleet is planned. Equipment suppliers will include Metso for the crushing station, apron feeders, mills, flotation cells and filter presses.
Companies & ownership
  • Nouveau Monde Graphite
    TSX:NOU · NYSE:NMG
Centenario-Ratones Project

Salta province, Argentina · Solution

Operating
Lithium
Commodities, grades and output
YearCommodityAv. GradeOutput
2024Lithium407 mg/L-
Mine life
40 years
Workforce
500
Overview
The project, operated by Eramet's subsidiary Eramine Sudamérica S.A., is located in the Salar de Centenario-Ratones at an altitude of approximately 4,000 metres. The French mining group Eramet initially partnered with China's Tsingshan Group but acquired Tsingshan's 49.9% stake in October 2024 to gain 100% ownership. The plant was inaugurated in July 2024, with commissioning starting the same month, and it delivered its first production in December 2024. The total drainable mineral resources are estimated at more than 15 million tonnes of LCE.
Production
First lithium carbonate was produced in December 2024. The Phase 1 plant has a nameplate capacity of 24,000 tonnes per year of battery-grade lithium carbonate equivalent (LCE). The company will ramp up production in 2025.
Processing
The project uses a Direct Lithium Extraction (DLE) plant. This process has a lithium recovery yield of over 90%. The plant is designed to recycle 60% of its process water.
Expansion
A feasibility study is underway for a second phase of development to add approximately 30,000 tonnes of LCE to the annual production capacity. The total resource is believed to support a potential long-term production capacity of over 75,000 tonnes per year of LCE.
Companies & ownership
  • Lithium Power International Limited
    ASX:LPI
  • Eramet
Apurimac Iron Ore Project

Apurímac, Peru · Open Pit

Under Development
Iron OreSulfur
Commodities, grades and output
YearCommodityAv. GradeOutput
2021Iron Ore65.99 %35000 t
2021Sulfur0.09 %-
Mine life
20 years
Overview
The Apurimac Iron Ore Project is under development, with Strike Resources aiming to resume small-scale mining. Permitting was paused in July 2025. Long-term plans for 20 Mtpa production depend on infrastructure like the proposed Andahuaylas-Marcona railway.
Production
Production overview - 2021: iron ore 35000 t.
Processing
The project plans to use conventional open-cut mining methods. High-grade Direct Shipping Ore (DSO) is processed through crushing plants. A pre-feasibility study considered coarse, wet magnetic beneficiation to produce a concentrate with over 68% Fe.
Expansion
The project has the potential to support a significant iron ore operation, with a long-term objective of producing 20 million tonnes per annum. This is largely dependent on the development of supporting infrastructure, such as the proposed Andahuaylas-Marcona railway, which would connect the project to a port.
Companies & ownership
  • Strike Resources Ltd
    ASX:SRK
La Guitarra Silver Mine

Mexico State, Mexico · Underground

Closed
SilverGold
Companies & ownership
  • First Majestic Silver Corp.
    TSX:AG · NYSE:AG
La Parrilla Silver Mine

Durango, Mexico · Underground

Closed
SilverLeadZinc
Companies & ownership
  • First Majestic Silver Corp.
    TSX:AG · NYSE:AG
Del Toro Silver Mine

Zacatecas, Mexico · Underground

Closed
SilverLeadZinc
Companies & ownership
  • First Majestic Silver Corp.
    TSX:AG · NYSE:AG
Jerritt Canyon

Nevada, United States · Underground

Care And Maintenance
Gold
Companies & ownership
  • First Majestic Silver Corp.
    TSX:AG · NYSE:AG
Los Gatos Silver Mine

Chihuahua, Mexico · Underground

Operating
SilverZincLead
Companies & ownership
  • First Majestic Silver Corp.
    TSX:AG · NYSE:AG
La Encantada Silver Mine

Coahuila, Mexico · Underground

Operating
Silver
Companies & ownership
  • First Majestic Silver Corp.
    TSX:AG · NYSE:AG
Santa Elena Silver/Gold Mine

Sonora, Mexico · Underground

Operating
SilverGold
Companies & ownership
  • First Majestic Silver Corp.
    TSX:AG · NYSE:AG
San Dimas Silver/Gold Mine

Durango, Mexico · Underground

Operating
SilverGold
Commodities, grades and output
YearCommodityAv. GradeOutput
2025Silver-15400000 oz
2025Gold-147433 oz
2024Silver-4500000 oz
2024Gold-50000 oz
Workforce
1,800
Production
Production overview - 2025: silver 15400000 oz, gold 147433 oz; 2024: silver 4500000 oz, gold 50000 oz.
Processing
Ore is processed at the 2,500 tonne-per-day capacity Tayoltita mill. The process involves conventional crushing and grinding, followed by cyanidation and zinc precipitation to recover gold and silver. The final product is silver and gold doré bars, which are then sent to refineries in Mexico and the United States.
Equipment
The mine utilises long-hole stoping and mechanised cut-and-fill mining methods. Equipment includes load-haul-dump (LHD) machines, haul trucks, drill jumbos, and jackleg drills.
Expansion
First Majestic has been actively engaged in exploration programs at San Dimas to test new mineral targets and convert mineral resources to reserves. Drilling in 2024 and 2025 has intersected significant high-grade silver and gold mineralisation in multiple veins, including the Perez, Sinaloa-Elia, Santa Teresa, and the newly discovered Coronado vein. These results suggest potential for resource expansion and future production growth. The company planned to invest approximately $182 million in capital expenditures in 2025 for sustaining and expansionary projects across its operations, with a focus on exploration and development at San Dimas and Santa Elena. For 2025, approximately 14,000 metres of underground development was planned for the San Dimas mine.
Companies & ownership
  • First Majestic Silver Corp.
    TSX:AG · NYSE:AG