← Map view|Directory

Directory

Browse minesites, mining companies and suppliers. Use the tabs below to switch sections.

Minesites Directory

Browse minesites. Each card shows company ownership and their most recent associated articles.

Filter by mine details and commodity attributes.
Page 117 of 147 (3508 total)
Peats Ridge

New South Wales, Australia · Quarry

Operating
GraphiteSilica SandKaolinHalloysiteTitaniumIron Ore (Magnetite)+39
Companies & ownership
  • Boral Limited
    ASX:BLD
Orange Grove Quarry

Western Australia, Australia · Quarry

Operating
Opened
1962-01-01
Workforce
over 20 full-time employees and more than 30 truck drivers
Overview
Orange Grove Quarry, also known as Boral Quarries Orange Grove (Browns Creek), is an operational hard rock quarry located in Orange Grove, Western Australia, Australia. The quarry is situated 18.6 kilometres southeast of Perth. It is Boral's main hard rock quarry in Western Australia and produces approximately one million tonnes of crushed rock annually.
Production
approximately one million tonnes of crushed rock annually
Processing
Rock is extracted using blasting and excavation methods and is then processed on site. The processing involves crushing and screening of the hard rock.
Equipment
water truck, automatic water cannons for dust suppression, enclosed conveyors, hotmix storage silos, mobile asphalt plant
Expansion
In the 2019 financial year, reinvestments at the quarry were completed, and it was reported to be producing at its targeted capacity.
Companies & ownership
  • Boral Limited
    ASX:BLD
Marulan South (Limestone Mine)

New South Wales, Australia · Open Pit

Operating
LithiumKaolin
End year
2051
Mine life
30 years
Workforce
Approximately 118 people on-site and an additional 73 off-site workers.
Overview
Long-standing, continuously operating open-cut mine extracting limestone and clay/shale, with mining activities dating back to the 1830s. Received development consent in 2021 to continue operations for up to 30 years.
Production
Up to 4 million tonnes of limestone and up to 200,000 tonnes of clay/shale per year. Combined processing limit on-site is 4.2 million tonnes annually.
Processing
Crushing, screening, conveying, stockpiling, and lime production via rotary kiln.
Equipment
Haul trucks, front-end loaders, hydraulic hammer, primary and secondary crushers, screening, conveying, stockpiling plant, lime plant with rotary kiln.
Expansion
Received development consent (SSD 7009) on 19 August 2021 to continue operations for up to 30 years.
Companies & ownership
  • Boral Limited
    ASX:BLD
Jesmond

New South Wales, Australia · Quarry

Operating
GraphiteSilica SandKaolinHalloysiteTitaniumIron Ore (Magnetite)+39
Companies & ownership
  • Boral Limited
    ASX:BLD
Holbrook

New South Wales, Australia · Quarry

Operating
GraphiteSilica SandKaolinHalloysiteTitaniumIron Ore (Magnetite)+39
Companies & ownership
  • Boral Limited
    ASX:BLD
Cringila

New South Wales, Australia · Quarry

Operating
GraphiteSilica SandKaolinHalloysiteTitaniumIron Ore (Magnetite)+39
Companies & ownership
  • Boral Limited
    ASX:BLD
Ballina

New South Wales, Australia · Quarry

Operating
GraphiteSilica SandKaolinHalloysiteTitaniumIron Ore (Magnetite)+39
Companies & ownership
  • Boral Limited
    ASX:BLD
Agua de la Falda (ADLF)

Atacama, Chile · Open Pit

Under Development
GoldSilverCopper
Overview
Project in Atacama, Chile. Pan American Silver held 57.74% interest, acquired via Yamana Gold, then sold to Rio Tinto. Historically focused on precious metals, now explored for copper.
Companies & ownership
  • Pan American Silver Corp.
    TSX:PAAS · NYSE:PAAS
Waterloo Property

California, United States · Underground

Under Development
SilverBariteGold
Overview
The Waterloo Property, located in San Bernardino County, California, United States, was an exploration-stage project for Pan American Silver Corp. and not an operational mine during their ownership. The primary commodities of interest were silver and barite, with gold mineralisation also identified. Pan American Silver sold the property to Apollo Silver Corp. in July 2021, retaining a 2% net smelter return royalty.
Companies & ownership
  • Pan American Silver Corp.
    TSX:PAAS · NYSE:PAAS
La Arena II

La Libertad, Peru · Open Pit

Under Development
CopperGold
Mine life
21 years
Overview
The La Arena II project is an undeveloped porphyry-hosted copper-gold asset in the La Libertad region of Peru. A Preliminary Economic Assessment (PEA) outlined a large open-pit mine with a 21-year mine life and a flotation processing plant. Pan American Silver Corp. held 100% interest until its sale on December 3, 2024, retaining a 1.5% net smelter return royalty on gold.
Processing
flotation
Equipment
truck and shovel
Companies & ownership
  • Pan American Silver Corp.
    TSX:PAAS · NYSE:PAAS
Minera Agua Rica Alumbrera (MARA)

Catamarca, Argentina · Open Pit

Feasibility
CopperGoldSilverMolybdenum
Mine life
27 years
Overview
The Minera Agua Rica Alumbrera (MARA) project is a large-scale copper, gold, silver, and molybdenum project in Catamarca, Argentina. It is a brownfield development, integrating the existing infrastructure of the previously operational Alumbrera mine with the undeveloped Agua Rica deposit.
Production
Proven and probable mineral reserves of 1.105 billion tonnes of ore, containing 5.4 million tonnes of copper and 7.4 million ounces of gold. The Alumbrera plant has an annual throughput capacity of approximately 40 million tonnes.
Processing
Utilises existing Alumbrera processing plant with crushing, grinding, and flotation. Ore from Agua Rica pit transported via 35km conveyor to Alumbrera plant (40 million tonnes annual throughput capacity). Produces copper concentrate with gold, silver, molybdenum by-products, transported via pipeline to Tucumán and then rail to Rosario port.
Equipment
Conventional open-pit mining machinery including large shovels and haul trucks. Existing Alumbrera infrastructure includes a primary gyratory crusher (8,500 tph capacity), 1.7km conveyor, and two grinding lines.
Companies & ownership
  • Pan American Silver Corp.
    TSX:PAAS · NYSE:PAAS
Mapur

Bangka Belitung Islands, Indonesia · Placer

Operating
Tin
Overview
Mapur is an area where PT Timah Tbk has mining activities within its Mining Business Permit (IUP) in Desa Mapur, Riau Silip District, Bangka Regency, Indonesia. Mining is conducted through partner-operated, small-scale mining known as TI Rajuk.
Equipment
TI Rajuk
Companies & ownership
  • PT Timah Tbk
Kabaena Nickel Mine

Southeast Sulawesi, Indonesia · Open Pit

Operating
Nickel
End year
2029
Overview
Nickel mining operation in Kabaena District, Bombana Regency, Southeast Sulawesi, Indonesia, operated by PT Timah Investasi Mineral, a subsidiary of PT Timah Tbk. Holds a Mining Business Permit (IUP) for nickel production covering 300 hectares.
Processing
The mine's processing method includes the use of five settling pond units for wastewater management.
Companies & ownership
  • PT Timah Tbk
Batu Besi

Bangka Belitung Islands Province, Indonesia · Open Pit

Care And Maintenance
Tin
Opened
2019-01-01
End year
2034
Mine life
15 years
Overview
The Batu Besi mine is a primary tin deposit located in Burung Mandi Village, Damar District, East Belitung Regency, Bangka Belitung Islands Province, Indonesia. It is an onshore, open-pit mining operation and a key focus for PT Timah as the company shifts towards exploiting its primary tin reserves.
Production
production target of 3-4 tonnes of tin per month, with an overburden removal rate of 70 M³/hour
Processing
selective mining with X-ray fluorescence (XRF), comminution using a ball mill, rotary dryer burner equipment (now using gas instead of fuel oil)
Equipment
digging, loading, and unloading equipment, transportation equipment, ball mill, rotary dryer burner equipment
Companies & ownership
  • PT Timah Tbk
Paku Primary Mine

Bangka Belitung, Indonesia · Open Pit

Under Development
Tin
Overview
The project is focused on the extraction of primary tin deposits from hard rock material. The development of the Paku Primary Mine is a strategic priority for PT Timah Tbk as the company anticipates a decline in its alluvial tin reserves by 2029. Activities at the site include the recalculation of pit optimisation and pit design, as well as the completion of a Feasibility Study. Exploration activities were ongoing in 2024.
Equipment
excavators and dump trucks
Companies & ownership
  • PT Timah Tbk
De Punt Prospecting Right

Western Cape, South Africa · Open Pit

Under Development
ZirconRutileIlmeniteMineral Sands
Overview
The project targets the southern extensions of the Western and Eastern Strandline deposits found at the adjacent Tormin mine. These are palaeo-marine strandlines that host concentrations of high-grade Valuable Heavy Minerals.
Equipment
air core drilling equipment, fixed-wing aircraft for surveys
Companies & ownership
  • Mineral Commodities Ltd
    ASX:MRC
Xolobeni Mineral Sands Project

Eastern Cape, South Africa · Open Pit

Under Development
IlmeniteRutileZircon
Mine life
22 years
Overview
One of the largest undeveloped, high-grade mineral sands deposits in the world, with a JORC-compliant Measured, Indicated, and Inferred Resource of 346 million tonnes at 5% Total Heavy Mineral (THM). The project is currently undeveloped due to community opposition and a ministerial moratorium.
Production
Historical studies projected annual production of 250,000 tonnes of ilmenite, 19,000 tonnes of rutile, and 15,000 tonnes each of zircon and leucoxene.
Processing
wet separation plant
Companies & ownership
  • Mineral Commodities Ltd
    ASX:MRC
Munglinup Graphite Project

Western Australia, Australia · Open Pit

Under Development
Graphite
Mine life
14 years
Workforce
Mining operations are planned to occur during the day shift on a 5/2 roster, while Run of Mine (ROM) operations will be owner-operated and continue 24/7. This structure is intended to attract employees who can reside in Esperance and operate on a daily bus-in/bus-out basis.
Overview
The Munglinup Graphite Project is located in the South Coast region of Western Australia, approximately 640 kilometres southeast of Perth. It is currently in the development and permitting stage, with a Definitive Feasibility Study (DFS) completed in January 2020 confirming its viability. The project is recognised by the Australian Government as a Critical Mineral Project.
Production
anticipated average annual production is approximately 52,000 tonnes of graphite concentrate with a grade of over 95% Total Graphitic Carbon (TGC). The Ore Reserve is estimated at 4.24 million tonnes at an average grade of 12.8% TGC.
Processing
conventional, multi-stage milling and flotation to produce high-grade graphite concentrates. The flotation circuit will feature a trommel front end, a rougher, and five cleaner flotation stages with attritioning between stages.
Equipment
traditional truck and hydraulic excavator operation
Companies & ownership
  • Mineral Commodities Ltd
    ASX:MRC
Skaland Graphite Operation

Troms, Norway · Underground

Operating
Graphite
Opened
1917-01-01
Workforce
approximately 40 people
Overview
The Skaland Graphite Operation is an underground mine located on the island of Senja in northern Norway. It is noted for being the highest-grade operating flake graphite mine in the world, with a mill feed grade averaging around 25% carbon. It is also the largest crystalline graphite producer in Europe and the fourth largest producer globally outside of China.
Production
approximately 40,000 tonnes of ore in 2019, annual production capacity is around 10,000 tonnes of graphite concentrate, with regulatory approvals to increase production to 16,000 tonnes per annum. In October 2024, the operation produced 1,000 tonnes of saleable product.
Processing
crushing ore from the mine, which is then dumped into a Run-of-Mine (ROM) ore bin and conveyed to an autogenous mill. This is followed by a front-end, open-ended milling circuit before the ore undergoes a three-stage flotation and cleaner circuit.
Equipment
primary production drill rig, an underground loader, a surface truck, and a crusher
Companies & ownership
  • Mineral Commodities Ltd
    ASX:MRC
Tormin Mineral Sands Operation

Western Cape, South Africa · Open Pit

Care And Maintenance
ZirconRutileIlmenite
Opened
2013-01-01
Workforce
approximately 300 workers
Overview
Located on the Western Cape of South Africa, approximately 360 kilometres north of Cape Town. It is a 50-50 joint venture between Mineral Commodities Ltd and Blue Bantry Investments 255 (Pty) Ltd, mining high-grade placer beach sands and inland strandline deposits.
Processing
ore transported to Primary Concentrator Plant and Secondary Concentrator Plant; minerals separated using chemical-free gravity process in Primary Beach Concentrator; garnet stripping plant separates garnet; non-magnetic material separated from heavy mineral concentrate; plans for a Minerals Separation Plant (MSP) using magnetic and gravity separation techniques
Equipment
mobile excavators, front-end loaders, trucks, diesel generators (Cat C15 units, Olympian generator sets), mobile lighting towers, dozers
Companies & ownership
  • Mineral Commodities Ltd
    ASX:MRC
Lithium Technical Development Center

Nevada, United States · Processing Facility

Operating
Lithium
Overview
A state-of-the-art laboratory and piloting facility in Reno, Nevada, processing Thacker Pass ore to produce battery-quality lithium carbonate.
Production
Produces battery-quality lithium carbonate samples for potential customers and partners.
Processing
mixing clay ore with sulfuric acid to leach the lithium into a solution, followed by a series of purification steps to create a high-purity lithium carbonate product.
Equipment
full-scale hydrocyclone
Companies & ownership
  • Lithium Americas Corp.
    TSX:LAC · NYSE:LAC
Thacker Pass

Nevada, United States · Open Pit

Under Development
Lithium
Mine life
85 years
Workforce
As of the end of December 2025, approximately 950 personnel were on site (740 manual craft workers, 210 additional site workers). The workforce is expected to increase to approximately 1,800 at peak construction in 2026. Phase 1 construction is anticipated to create nearly 2,000 direct jobs, including 1,800 skilled contractors.
Overview
The Thacker Pass project is located in Humboldt County in Northern Nevada, United States, approximately 100 kilometres northwest of Winnemucca, at the southern end of the McDermitt Caldera. It is a shallow open-pit mine with a co-located processing facility, currently under construction. Initial construction commenced in March 2023, with mechanical completion of Phase 1 targeted for late 2027. The project covers approximately 9 square miles of public land.
Production
Phase 1 is designed for a nominal production capacity of 40,000 tonnes per year of battery-quality lithium carbonate. The total nominal design capacity over five phases is 160,000 tonnes per year.
Processing
The processing method involves open-pit mining of mineralised soft clay, followed by crushing and an acid leaching process using on-site produced sulfuric acid. The process is designed as a closed-loop, zero liquid discharge facility with high water recycle and reuse. The lithium-bearing solution will be processed to produce high-purity lithium carbonate. Tailings will be filtered and dry-stacked.
Equipment
Bechtel is the engineering, procurement, and construction management contractor. The site will include a 642-acre plant complex with 600,000 square feet of processing plant buildings. Key equipment includes a sulfuric acid plant and a steam turbine generator. Foundation, rebar, and concrete work are underway for facilities including the Filter Building and the Magnesium Sulfate Building. The mine plan involves block mining.
Companies & ownership
  • Lithium Americas Corp.
    TSX:LAC · NYSE:LAC
Vicuña Project

San Juan Province, Argentina · Open Pit

Under Development
CopperGoldSilver
Opened
2030-01-01
End year
2100
Mine life
70 years
Workforce
During the construction phase, the project is expected to create 5,500 direct and 19,000 indirect jobs.
Overview
The Vicuña Project is a development-stage mining asset operated by Vicuña Corp., a 50/50 joint venture between Lundin Mining Corporation and BHP. The project is located in the Vicuña District, spanning the border of Argentina and Chile, with deposits in the San Juan Province of Argentina and the Atacama Region of Chile. Development is planned in three stages, with a final investment decision targeted for the end of 2026.
Production
Projected production figures for the first 25 years of operation average 400,000 tonnes of copper, 700,000 ounces of gold, and 22 million ounces of silver annually. Peak annual production over a ten-year period is forecast to be over 500,000 tonnes of copper, 800,000 ounces of gold, and 20 million ounces of silver.
Processing
Stage 1: sulphide concentrator with a capacity of 175,000 tonnes per day, conventional crushing, grinding, and flotation to produce copper concentrate. Stage 2: heap leach circuit and a solvent extraction and electrowinning (SX/EW) plant to produce copper cathodes and gold-silver dore. Stage 3: expansion of concentrator to 293,000 tonnes per day, roasting plant to treat concentrate with high arsenic levels.
Equipment
shared fleet of ultra-class haul trucks with a 360-tonne payload, loaded by a combination of electric rope shovels and large hydraulic excavators. The initial fleet is expected to consist of 20-30 haul trucks, expanding to 90-100 trucks and 8-10 primary loading units at peak production. Wheel loaders will be used for stockpile management, and large-diameter rotary blast hole drills are planned for production drilling. Infrastructure to be developed includes access roads, power transmission lines, a water supply, and tailings management facilities. A desalination plant and associated pipelines are planned for Stage 3.
Companies & ownership
  • Lundin Mining Corp.
    TSX:LUN
Chapada

Goiás, Brazil · Open Pit

Operating
CopperGold
Companies & ownership
  • Lundin Mining Corp.
    TSX:LUN
  • Sandstorm Gold Royalties
    TSX:SSL
Page 117 of 147 (3508 total)