Minesites Directory

Browse minesites. Each card shows company ownership and their most recent associated articles.

Filter by mine details and commodity attributes.
Page 119 of 147 (3508 total)
Huaron mine

Pasco, Peru · Underground

Operating
SilverZincLeadCopper
Overview
The Huaron mine is an active underground polymetallic mine wholly owned and operated by Pan American Silver Corp. in the Pasco region of central Peru, producing silver, zinc, lead, and copper.
Production
Average plant throughput of 2,500 tonnes per day. Produced 3.52 million ounces of silver in 2024. Forecast for 2025 is 3.70-3.90 million ounces of silver.
Processing
Ore is processed on-site to produce silver-rich zinc, lead, and copper concentrates through a flotation process. Average plant throughput is 2,500 tonnes per day. A new filter plant and filter-stack tailings storage facility was completed in Q4 2024.
Equipment
Underground mobile mining fleet includes: Two 6.0 cubic yard scooptrams, Nine 4.2 cubic yard scooptrams, Four 2.2 cubic yard scooptrams, Ten 1-boom drill jumbos, Four 1-boom long hole drills, Four 1-boom bolting jumbos, One 15-tonne mine haul truck, Seventeen 2.7-tonne scissor lifts, Fourteen 25-tonne Volvo trucks.
Companies & ownership
  • Pan American Silver Corp.
    TSX:PAAS · NYSE:PAAS
El Peñón

Antofagasta Region, Chile · Underground

Operating
GoldSilver
End year
2031
Workforce
351 employees in one union and 121 in the supervisors' union (as of March 2021)
Overview
El Peñón is an operating underground gold and silver mine in the Atacama Desert, Antofagasta Region, Chile, owned 100% by Pan American Silver Corp. It is a significant contributor to Chile's gold production.
Production
In 2024, 126.8 thousand ounces of gold and 3.87 million ounces of silver. For the full year 2025, 115.2 thousand ounces of gold and 3.91 million ounces of silver.
Processing
Crushing and grinding followed by a leaching and Merrill-Crowe process to produce doré. The processing plant infrastructure includes a primary crusher, a SAG mill, and a ball mill. The process continues with pre-leaching thickening, leaching, counter-current decantation for concentrate solution recovery, clarification, zinc precipitation, and refining. The facility also has a filtered tailings stack storage facility.
Equipment
16 Caterpillar AD30 haul trucks, 11 scoops with a 6 cubic yard capacity, 4 Toro-LH 203 scoops with a 2 cubic yard capacity, 1 Toro-LH 210 scoop with a 1 cubic yard capacity, 7 Atlas Copco M2C jumbo drills, 1 Atlas Copco Boomer 282 jumbo drill, 2 Atlas Copco Boltec drills (H235 and another unspecified model)
Companies & ownership
  • Pan American Silver Corp.
    TSX:PAAS · NYSE:PAAS
Dolores

Chihuahua, Mexico · Open Pit

Operating
GoldSilver
End year
2026
Overview
The Dolores mine is owned and operated by Compañía Minera Dolores S.A. de C.V., a wholly-owned subsidiary of Pan American Silver Corp. Royal Gold, Inc. holds a 3.25% net smelter return royalty on gold and a 2.0% royalty on silver. Construction on the mine began in late 2006, with the first doré produced in November 2008 and commercial production starting in May 2009. Mining activities from known ore reserves concluded in the third quarter of 2024. Following the completion of processing low-grade stockpiles in the first quarter of 2025, the mine entered the residual leaching phase, which is expected to continue until the end of 2026. The underground operation was placed on care and maintenance in April 2022. The company is advancing closure studies and conducting progressive closure work for the site.
Production
971 thousand ounces of silver and 37.6 thousand ounces of gold for the year ending December 31, 2025
Processing
crushing plant, conveying and stacking facilities, heap leach pads, solution ponds, and Merrill-Crowe and refining facilities; pulp agglomeration plant
Equipment
crushing plant, conveying and stacking facilities, heap leach pads, solution ponds, Merrill-Crowe and refining facilities, pulp agglomeration plant
Expansion
An expansion in 2017 added a pulp agglomeration plant to process high-grade ore from both the open-pit and a new underground mine.
Companies & ownership
  • Pan American Silver Corp.
    TSX:PAAS · NYSE:PAAS
  • Royal Gold, Inc.
    NYSE:RGLD
Cerro Moro

Santa Cruz, Argentina · Open Pit

Operating
GoldSilver
End year
2027
Mine life
5 years
Workforce
In 2013, it was projected that the project would create 1,000 direct and indirect jobs. During COVID-19 related restrictions in April 2020, the mine was operating with about 20% of personnel.
Production
In 2021, production was 79,988 ounces of gold and 5,582,197 ounces of silver. For the fourth quarter of 2025, the mine produced 27,600 ounces of gold and 920,000 ounces of silver. Gold production for the full year 2025 saw a 7% year-over-year increase, while silver production dipped 15% from 2024 due to mine sequencing into lower-grade zones. The production forecast for 2026 is projected to be between 2.80 and 3.00 million ounces of silver.
Processing
Ore is processed at a plant with a throughput of 1,000 tonnes per day. The processing method involves crushing, grinding, and gravity recovery circuits, followed by intensive leaching with cyanide for high-grade concentrate. A flotation circuit and a Merrill-Crowe plant are used to recover remaining metals. The final product is a gold/silver doré created on site through electro-winning and smelting.
Equipment
Underground operations are carried out by the owner-operator, with some development work handled by a contractor. The underground equipment fleet was purchased new when operations began and is reported to be in excellent condition. A 2017 report indicated that mobilization for open-pit operations was underway.
Companies & ownership
  • Franco-Nevada Corporation
    TSX:FNV
  • Pan American Silver Corp.
    TSX:PAAS · NYSE:PAAS
10X rare earth magnet manufacturing campus

Texas, United States · Processing Facility

Under Development
Rare Earth Elements
Companies & ownership
  • MP Materials Corp.
    NYSE:MP
Independence Magnet Manufacturing Facility

Texas, United States · Processing Facility

Operating
Rare Earth Elements
Companies & ownership
  • MP Materials Corp.
    NYSE:MP
Oracle Nickel project

Central Sulawesi, Indonesia · Processing Facility

Operating
Nickel
Companies & ownership
  • Nickel Industries Limited
    ASX:NIC · OTC:NICMF
Mountain Pass Mine

California, United States · Open Pit

Operating
Rare Earth Elements
Companies & ownership
  • MP Materials Corp.
    NYSE:MP
Huayue Nickel Cobalt (HNC) HPAL project

Central Sulawesi, Indonesia · Processing Facility

Operating
NickelCobalt
Commodities, grades and output
YearCommodityAv. GradeOutput
2025Nickel-16635 t
2024Nickel-83410 t
2024Cobalt-7687 t
2023Nickel-19550 t
Workforce
The Huayue Nickel Cobalt (HNC) project employs approximately 4,000 people.
Overview
The Indonesia Morowali Industrial Park Nickel and Cobalt Operations comprise two distinct facilities: the Huayue Nickel Cobalt (HNC) HPAL project and the Ranger Nickel project. Both are located within the Indonesia Morowali Industrial Park (IMIP) in Central Sulawesi, Indonesia, and Nickel Industries Limited is a stakeholder in both. The HNC project commenced production in November 2021, while Ranger Nickel began NPI production in May 2019.
Production
In 2024, the Huayue Nickel Cobalt (HNC) project produced 83,410 tonnes of nickel and 7,687 tonnes of cobalt contained in MHP. The Ranger Nickel project produced 19,550 tonnes of nickel metal in NPI in 2023, and 16,635 tonnes of nickel for the 2025 financial year.
Processing
The Huayue Nickel Cobalt (HNC) project is a High-Pressure Acid Leach (HPAL) facility that processes limonite ore to produce Mixed Hydroxide Precipitate (MHP) for the electric vehicle battery supply chain. The Ranger Nickel project is a Rotary Kiln Electric Furnace (RKEF) plant that produces nickel pig iron (NPI) for the stainless-steel industry.
Equipment
The Huayue Nickel Cobalt (HNC) facility is equipped with four autoclaves. The Ranger Nickel plant consists of two Rotary Kiln Electric Furnace (RKEF) lines.
Companies & ownership
  • Nickel Industries Limited
    ASX:NIC · OTC:NICMF
Hengjaya Nickel Project

Central Sulawesi, Indonesia · Processing Facility

Operating
Nickel
Overview
The Hengjaya Nickel project's processing facilities are located within the Indonesia Morowali Industrial Park (IMIP), producing Nickel Pig Iron (NPI) and nickel matte for the EV battery supply chain.
Production
Combined annual nameplate capacity of 15,000 tonnes of nickel. Produced 20,020 tonnes of nickel metal in 2021, 19,363 tonnes in 2022, 5,291 tonnes in Q3 2023, and 8,860 tonnes in H1 2024.
Processing
Rotary Kiln Electric Furnace (RKEF) lines
Equipment
two Rotary Kiln Electric Furnace (RKEF) lines; electric vehicles for haulage
Companies & ownership
  • Nickel Industries Limited
    ASX:NIC · OTC:NICMF
Hengjaya Mine

Central Sulawesi, Indonesia · Open Pit

Operating
NickelCobalt
Workforce
Nearly 500 people as of 2024.
Overview
The Hengjaya Mine is an active, open-pit mine located in the Morowali Regency, on the east coast of the province of Central Sulawesi, Indonesia. It is operated by PT Hengjaya Mineralindo, in which Nickel Industries Limited holds an 80% interest.
Production
454,615 wet metric tonnes (wmt) of nickel ore mined in year ended 30 June 2019; 2,457,694 wmt of saprolite ore and 1,161,600 wmt of limonite mined in 2021; record quarterly ore sales of 3,021,678 tonnes in June quarter of 2025; approved sales quota (RKAB) for 2026 increased to 14.3 million wmt (6.0 million wmt saprolite, 8.3 million wmt limonite); targeting annual RKAB of 19 million tonnes.
Processing
Direct shipping operation supplying nickel laterite ore to processing facilities; saprolite ore to Rotary Kiln Electric Furnace (RKEF) operations; limonite ore intended for High-Pressure Acid Leach (HPAL) plants; plans for slurry pipeline and in-pit tailings storage system.
Equipment
haul road, jetty, stockpile area, truck and shovel/loader, EV trucks, solar power system
Companies & ownership
  • Nickel Industries Limited
    ASX:NIC · OTC:NICMF
Excelsior Nickel Cobalt (ENC) HPAL project

North Maluku, Indonesia · Processing Facility

Under Development
NickelCobalt
Companies & ownership
  • Nickel Industries Limited
    ASX:NIC · OTC:NICMF
Sambalagi Project

Central Sulawesi, Indonesia · Processing Facility

Under Development
Nickel
Workforce
Approximately 5,000 workers once operational.
Overview
The Sambalagi Project is an integrated nickel mining and processing operation developed by PT Vale Indonesia Tbk, located in the Morowali Regency of Central Sulawesi, Indonesia. The project consists of mining operations in the Bungku Timur and Bahodopi subdistricts, with the processing facilities situated in Sambalagi Village, Bungku Pesisir subdistrict. The entire development is also referred to as the Indonesia Growth Project (IGP) Morowali.
Production
Annual production capacity of between 73,000 and 80,000 tonnes of nickel contained in ferronickel (from RKEF facility).
Processing
One part of the project involves the construction of a ferronickel smelter that will utilise saprolite nickel ore, employing Rotary Kiln-Electric Furnace (RKEF) technology. The second component is a High-Pressure Acid Leach (HPAL) plant designed to process limonite nickel ore to produce Mixed Hydroxide Precipitate (MHP).
Companies & ownership
  • PT Vale Indonesia Tbk
    ASX:INCO
Tanamalia project

South Sulawesi, Indonesia · Open Pit

Feasibility
Nickel
Workforce
approximately 250 local workers
Overview
The Tanamalia project is located in an area with nickel laterite deposits. A second phase of the feasibility study is ongoing, which covers technical, economic, operational, legal, and sustainability aspects for the development of the Tanamalia Block mine.
Processing
High-Pressure Acid Leaching (HPAL)
Companies & ownership
  • PT Vale Indonesia Tbk
    ASX:INCO
Angel Nickel project

North Maluku province, Indonesia · Processing Facility

Operating
Nickel
Workforce
approximately 2,000 people
Overview
The Angel Nickel project, also referred to as ANI, is operated by PT Angel Nickel Industry in the Indonesia Weda Bay Industrial Park (IWIP) on Halmahera Island, North Maluku province, Indonesia. The project is a processing facility, not a mine, and produces Nickel Pig Iron (NPI), a key ingredient for stainless steel.
Production
Nameplate production capacity of 36,000 tonnes of contained nickel metal per annum. Production: 2022: 29,887 tonnes of nickel metal in NPI; 2023: 49,058 tonnes of nickel metal in NPI; First Half 2024: 22,389 tonnes of nickel metal.
Processing
using these RKEF lines to process nickel ore into NPI
Equipment
four Rotary Kiln Electric Furnace (RKEF) lines and a dedicated 380-megawatt (MW) captive power plant
Companies & ownership
  • Nickel Industries Limited
    ASX:NIC · OTC:NICMF
HPAL Sorowako project

South Sulawesi, Indonesia · Processing Facility

Under Development
Nickel
Workforce
392 people (construction workforce as of July 2025)
Overview
The project involves the development of a High-Pressure Acid Leaching (HPAL) smelter to process limonite ore from the existing Sorowako operation. The project is currently in the construction phase.
Production
approximately 60,000 tonnes of nickel contained in MHP annually
Processing
High-Pressure Acid Leaching (HPAL) technology
Companies & ownership
  • PT Vale Indonesia Tbk
    ASX:INCO
Bahodopi Block

Central Sulawesi, Indonesia · Open Pit

Under Development
Nickel
End year
2044
Mine life
19 years
Workforce
Expected up to 15,000 jobs during construction. 503 individuals involved in development at Bahodopi Block 1 commencement (Sept 2025); 680 workers during earthwork construction.
Overview
Integrated low-carbon nickel mining and processing project in phased development, producing ferronickel and Mixed Hydroxide Precipitate (MHP). Operations commenced in July 2025 with first ore shipment.
Production
RKEF facility designed for up to 73,000 metric tons nickel in ferronickel annually; HPAL smelter up to 60,000 tons nickel. Approved to sell 2.2 million tonnes saprolite ore; first sales ~80,000 tons. Expected ore production 1.0-1.2 million wet metric tonnes per quarter for H2 2025.
Processing
Rotary Kiln Electric Furnace (RKEF) technology for ferronickel; High-Pressure Acid Leach (HPAL) smelter for Mixed Hydroxide Precipitate (MHP).
Equipment
mining facilities, processing plant, disposal areas, settling ponds, stockpiles, camps, workshops, Mining Haul Roads (MHR), Rotary Kiln Electric Furnace (RKEF) plant, High-Pressure Acid Leach (HPAL) plant, liquefied natural gas (LNG) power plant. PT Petrosea Tbk contracted for mining services.
Companies & ownership
  • PT Vale Indonesia Tbk
    ASX:INCO
Indonesia Growth Project (IGP) Morowali

Central Sulawesi, Indonesia · Open Pit

Under Development
Nickel
Workforce
Up to 15,000 during construction, around 5,000 for operational phase. Over 2,000 employed as of November 2024.
Overview
Integrated nickel mining and processing initiative in Central Sulawesi, Indonesia, focused on downstream nickel for EV and renewable energy sectors. Groundbreaking on 10 February 2023, with an investment of approximately US$2 billion.
Production
RKEF smelter capacity of 73,000-80,000 tonnes nickel content per year; HPAL plant capacity of 60,000 tonnes nickel per year (MHP). Approximately 2.2 million tonnes of nickel ore sold in 2025.
Processing
RKEF smelter to produce ferronickel; HPAL plant to produce Mixed Hydroxide Precipitate (MHP).
Equipment
Heavy equipment being mobilised; RKEF facility planned with eight lines of rotary kiln-electric furnace processing capacity.
Companies & ownership
  • PT Vale Indonesia Tbk
    ASX:INCO
Pomalaa Block

Southeast Sulawesi, Indonesia · Open Pit

Under Development
NickelCobalt
Opened
2022-11-27
End year
2045
Workforce
The project is expected to generate around 12,000 construction jobs. As of November 2023, approximately 400 workers were reported to be in the mining area. One report from January 2026 mentioned the project is expected to employ 5,150 workers.
Production
The mine is planned to produce 7 million tonnes of saprolite ore and 21 million tonnes of limonite ore annually. The associated High-Pressure Acid Leach (HPAL) plant is expected to produce up to 120,000 tonnes of contained nickel and approximately 15,000 tonnes of cobalt per year in the form of MHP.
Processing
High-Pressure Acid Leach (HPAL) technology
Equipment
The processing plant will feature five autoclaves. Supporting infrastructure includes workshops, offices, operational camps, a main entrance, operation and maintenance buildings, residences, solid waste treatment facilities, sedimentation ponds, wastewater and leachate treatment facilities, and a nursery for post-mining reclamation.
Companies & ownership
  • PT Vale Indonesia Tbk
    ASX:INCO
Sorowako Block

South Sulawesi, Indonesia · Open Pit

Operating
NickelCobalt
Opened
1978-01-01
End year
2035
Overview
The Sorowako Block is a large, active open-pit lateritic nickel mine in the Verbeek Mountains, South Sulawesi, Indonesia, operated by PT Vale Indonesia Tbk.
Production
70,728 metric tonnes of nickel in matte from 13,452,663 tonnes of ore mined in 2023. 2024 target: 70,800 metric tons of nickel in matte.
Processing
Pyrometallurgical and smelting technologies, including drying kilns, reduction kilns, and electric furnaces, to produce nickel in matte (78% Ni, 1-2% Co). Future plans include processing limonite ore into Mixed Hydroxide Precipitate (MHP).
Equipment
Drying kilns, reduction kilns, electric furnaces, three hydroelectric power plants, electric trucks.
Companies & ownership
  • PT Vale Indonesia Tbk
    ASX:INCO
Çayeli

Rize Province, Turkey · Underground

Operating
CopperZinc
Opened
1994-01-01
End year
2036
Workforce
476 staff and almost 500 sub-contractors; 466 employees in 2025 (412 local hires).
Overview
The Çayeli mine, operated by Çayeli Bakır İşletmeleri A.Ş., is an underground copper-zinc mine located on the Black Sea coast of north-eastern Turkey, extracting minerals from a volcanic hosted massive sulphide (VHMS) deposit since 1994.
Production
Ore processing capacity of 1.3 million tonnes per year. In 2025, production of copper concentrate was 49,800 tonnes and zinc concentrate was 5,000 tonnes.
Processing
Three stages of crushing, primary and secondary ball mill grinding, conventional flotation to produce separate copper and zinc concentrates, dewatering and filtering.
Equipment
Fleet management system (Micromine Pitram), Atlas Copco Boomer 282, Tamrock Solomatic Long Hole Drill, Volvo A35 Articulated Dump Truck, Tamrock EJC 430 Fuel Truck, 17' x 5' Aerofall Mill, 11' x 18-8" Ball Mill
Companies & ownership
  • First Quantum Minerals Ltd.
    TSX:FM
Cobre Las Cruces

Seville, Spain · Open Pit

Care And Maintenance
CopperZincLeadSilver
Workforce
approximately 700 people
Overview
Cobre Las Cruces is a mining and metallurgical operation located in the province of Seville, in southern Spain, approximately 20 kilometres northwest of the city of Seville. From 2009, the operation involved a high-grade open-pit copper mine, producing London Metal Exchange-Grade A copper cathodes. The open-pit mining was completed in 2020, and production continued through processing tailings until July 2023, when the operation transitioned to a care and maintenance phase. The company is now focused on the development of a future underground mining project to exploit a polymetallic primary sulphide deposit, which will involve a new polymetallurgical refinery to produce copper, zinc, lead, and silver.
Production
Total production from 2009 to 2023 amounted to 700,000 tonnes of copper cathode. Copper production ceased in the second quarter of 2023.
Processing
hydrometallurgical process involving atmospheric leaching, solvent extraction, and electrowinning to produce high-purity copper cathodes. The plant includes a water treatment facility that was expanded in 2024 to increase its processing capacity by 50%.
Equipment
hydrometallurgical plant, water treatment facility
Companies & ownership
  • First Quantum Minerals Ltd.
    TSX:FM
Ravensthorpe Nickel Operation

Western Australia, Australia · Open Pit

Care And Maintenance
NickelCobalt
Opened
2011-01-01
End year
2040
Workforce
Peak workforce of around 650 people.
Overview
Open-pit mine in Western Australia producing nickel and cobalt, with a final product of Mixed Hydroxide Precipitate suitable for battery production.
Production
In 2023, produced approximately 30,000 tonnes of nickel and 1,000 tonnes of cobalt. Annual nickel capacity is 30,000 tonnes.
Processing
Advanced hydrometallurgical plant with crushing facilities and a 9-kilometre overland conveying system.
Equipment
Offices, run-of-mine pads, heavy equipment workshops, power lines, raw water pipelines, crushing facilities, 9-kilometre overland conveying system, power plant with three 18MW steam turbines and five MTU Onsite Energy 20V 4000 G63 diesel generator sets.
Companies & ownership
  • First Quantum Minerals Ltd.
    TSX:FM
Tanjung Enim Coal Mine

South Sumatra, Indonesia · Open Pit

Operating
Coal
Opened
1981-01-01
Workforce
Majority of PT Bukit Asam's approximately 1,683 personnel.
Overview
Major mining complex in Muara Enim Regency, South Sumatra, Indonesia. Cornerstone of PT Bukit Asam Tbk's operations, covering 66,414 hectares with three main open pits: Air Laya, Muara Tiga Besar Utara (MTBU), and Banko Barat.
Production
37.14 million tonnes in 2022, 41.75 million tonnes in 2023. Total coal resources 5,851 million tonnes, proven reserves 3,018 million tonnes (2022).
Processing
Coal handling facilities (CHF) with 20 million tons/year capacity for processing and sizing. Extensive belt conveyor systems, new train-loading stations (3,000 tonnes/hour each) under construction (early 2024).
Equipment
Truck-and-shovel system, hydraulic excavators (Komatsu PC 3000E-6, PC 400 Lc), haul trucks (BelAZ-75135, Hino FM 320FI), bulldozers (D 375A), bucket wheel excavators, dump trucks, belt conveyor systems.
Companies & ownership
  • PT Bukit Asam Tbk
    ASX:PTBA