Arrow Deposit

Saskatchewan, Canada · Underground

Under Development
Uranium
Mine life
11 years
Overview
The Arrow Deposit is the land-based, basement-hosted resource for the Rook I Project. On March 5, 2026, the Canadian Nuclear Safety Commission (CNSC) gave its final federal approval, issuing a Licence to Prepare Site and Construct for the project. This follows the provincial Environmental Assessment approval received in November 2023. NexGen has made a Final Investment Decision and intends to commence official construction in the summer of 2026. The construction period is expected to be four years. The mine will be a conventional underground operation using long-hole stope mining methods. The project is the largest development-stage uranium project in Canada. The Arrow Deposit is located approximately 155 km north of La Loche.
Production
A 2021 feasibility study contemplates production of 233.6 million pounds of recovered yellowcake from probable mineral reserves. The mine is designed to produce up to 30 million pounds of uranium per year.
Processing
The project will include an onsite mill to process an average of 1,400 tonnes of ore per day.
Companies & ownership
  • NexGen Energy Ltd.
    ASX:NXG · TSX:NXE · NYSE:NXE
Lees Quarry

Western Australia, Australia · Quarry

Care And Maintenance
Soda AshSilica Sand
Overview
The Lees Quarry is a clay and sand extraction site in Upper Swan, Western Australia, currently undergoing rehabilitation. Rehabilitation efforts in 2019 and 2023 involved recontouring and backfilling. Operations are governed by Ministerial Statement No. 658 and various environmental management plans, with clay extracted for brick manufacturing.
Companies & ownership
  • Brickworks Limited
    ASX:BKW
Horsley Park Plant 23 Quarry

New South Wales, Australia · Quarry

Operating
CoalKaolinSilica Sand
Opened
1971-01-01
End year
2029
Production
The quarry supplies raw materials to the Horsley Park brick plants. For instance, Plant 23 requires approximately 530,000 tonnes of clay/shale annually to produce up to 130 million bricks. An Environment Protection Licence for the broader site allows for the crushing, grinding or separating of up to two million tonnes of material annually.
Processing
No clay or shale processing occurs within the quarry itself; raw materials are used for the adjacent brick manufacturing plants. Extraction is conducted by scrapers for clay materials or by excavator and haul truck for shale and sandstone, with ripping by bulldozer as required. No blasting is performed.
Equipment
scrapers, excavator, haul truck, bulldozer
Expansion
A modification was approved in August 2022 for the Plant 2 facility to increase its operational throughput capacity from 80 million to 130 million standard brick equivalents per year by moving to a 24/7 continuous shift model. The new state-of-the-art Horsley Park Plant 2 was substantially completed in FY2023. Parts of the quarry are undergoing progressive rehabilitation. In FY2023, the Horsley Park Plant 23 quarry was successfully relinquished to facilitate stages 2 to 4 of the new Oakdale Industrial Estate. An 11-hectare site in the south-western corner of the quarry, previously used for stockpiling, has been rehabilitated for the Oakdale East Industrial Estate.
Companies & ownership
  • Brickworks Limited
    ASX:BKW
Bowral Quarry Extension

New South Wales, Australia · Quarry

Operating
Kaolin
Opened
1995-01-01
End year
2027
Overview
The quarry primarily supplies Ashfield Shale, also referred to as Ashford Shale, with smaller amounts of clay and sandstone for brick manufacturing. The associated mining lease also permits the extraction of kaolin and structural clay minerals.
Production
Historical records show that approximately 789,860 tonnes of dark/light firing Ashfield Shale were extracted from the Bowral Quarry Extension up to 31 January 2018. More recent production figures have not been publicly disclosed in available reports.
Processing
Material from the quarry is used for manufacturing at the adjacent Bowral Brick Plant. The processing involves using the extracted clays and shales, which are compacted into individual moulds at high pressure to produce dry pressed bricks.
Companies & ownership
  • Brickworks Limited
    ASX:BKW
Almeria Parade

Western Australia, Australia · Open Pit

Operating
Kaolin
Opened
2004-01-01
End year
2035
Overview
The Almeria Parade project is an open-cut extractive industry mining clay for brick production. The extracted clay is transported off-site for processing. Operations are conducted in short, intensive periods, with excavation and carting limited to two one-week campaigns per year. Progressive rehabilitation is undertaken.
Production
Anticipated to extract up to 14,000 tonnes of clay annually.
Processing
No on-site processing; clay is stockpiled and transported off-site by truck to Austral Bricks' brickmaking factories.
Expansion
Development approval and extractive industry license renewal application submitted in late 2024 seeking to continue operations until 2035.
Companies & ownership
  • Brickworks Limited
    ASX:BKW
Rocky Ridge Plant

Maryland, United States · Processing Facility

Operating
KaolinSilica Sand
Overview
The Rocky Ridge Plant in Maryland, operated by Brickworks Limited, has been comprehensively upgraded and was re-commissioned in the second half of FY2024. As of March 2025, the commissioning was finalised, and brick shipments to local and UK markets have commenced. The facility will produce a range of moulded bricks specifically for the UK market, with a supply agreement with Brickability for 10 million bricks per annum. In addition, the plant will produce US modular brick and a premium long format brick.
Production
10 million bricks per annum (supply agreement with Brickability for UK market)
Expansion
The plant has been comprehensively upgraded and re-commissioned. Upgrade works were finalised in the first half of the 2025 financial year.
Companies & ownership
  • Brickworks Limited
    ASX:BKW
Glen-Gery Lawrenceville Plant

Virginia, United States · Processing Facility

Care And Maintenance
KaolinSilica Sand
Companies & ownership
  • Brickworks Limited
    ASX:BKW
Glen-Gery Corporation, Pittsburgh Plant

Pennsylvania, United States · Processing Facility

Operating
Kaolin
Workforce
three employees
Overview
The Glen-Gery Corporation's Pittsburgh Plant, formerly known as the Harmar Plant, is located in Pennsylvania, United States. The facility's name was officially changed in August 2020 to align with plant improvements and investments in its mining operations. These investments were aimed at building layered stockpiles of red and cream burning clays to ensure colour consistency and eliminate historical lime issues.
Expansion
plant improvements and investments in its mining operations. These investments were aimed at building layered stockpiles of red and cream burning clays to ensure colour consistency and eliminate historical lime issues.
Companies & ownership
  • Brickworks Limited
    ASX:BKW
United Brick Pit

Iowa, United States · Open Pit

Care And Maintenance
KaolinSilica Sand
Companies & ownership
  • Brickworks Limited
    ASX:BKW
Brick Yard Pit

Iowa, United States · Open Pit

Care And Maintenance
KaolinSilica Sand
Companies & ownership
  • Brickworks Limited
    ASX:BKW
Hanley Plant Quarries

Pennsylvania, United States · Quarry

Operating
KaolinSilica Sand
Companies & ownership
  • Brickworks Limited
    ASX:BKW
Mid-Atlantic Quarry

Pennsylvania, United States · Quarry

Operating
ChromiumManganeseTungstenVanadiumRare Earth ElementsPhosphate+19
Overview
The Mid-Atlantic Quarry is an active surface operation located in Shoemakersville, Berks County, Pennsylvania. It is owned and operated by Glen-Gery Corporation, a wholly-owned subsidiary of the Australian company Brickworks Limited. The quarry provides raw materials for the adjacent Mid-Atlantic brick manufacturing plant.
Expansion
plans have been lodged with local authorities for a 185,000 square metre industrial estate on surplus quarry land at what the company refers to as its "Mid Atlantic property"
Companies & ownership
  • Brickworks Limited
    ASX:BKW
Wollert

Victoria, Australia · Quarry

Operating
CoalIron Ore
Mine life
50 years
Overview
The Wollert facility, operated by Brickworks Limited's subsidiary, The Austral Tile Company Pty Ltd, is a major brick manufacturing plant with an associated on-site quarry. Located at Brick Makers Drive, Wollert, Victoria, it comprises two plants, Wollert East (operational since 2006) and Wollert West, doubling overall capacity. It is among the largest and most modern brick manufacturing facilities globally, operating 24/7 with a production capacity of 170 million bricks per year. The site is self-sufficient in water and practices progressive rehabilitation.
Production
170 million bricks per year
Processing
modern and efficient technology, including the use of robots in the manufacturing process. The kiln is fuelled by natural gas.
Companies & ownership
  • Brickworks Limited
    ASX:BKW
Shale Rd

Western Australia, Australia · Quarry

Operating
KaolinSilica Sand
Companies & ownership
  • Brickworks Limited
    ASX:BKW
Rockleigh

New South Wales, Australia · Quarry

Operating
KaolinSilica Sand
Overview
The Rockleigh Shale Quarry's continued operation is detailed in a Statement of Environmental Effects. Clay and shale extraction at the Rockleigh Quarry is complemented by operations at the Lot 2 Bunnygalore Quarry, located 2 kilometres to the southeast. Both sites supply raw materials to the Bowral Brick Plant, which is owned and operated by The Austral Brick Company Pty Limited, a subsidiary of Brickworks.
Expansion
Recent official documents from Brickworks reference a "Rockleigh Forward Program 2024-2027" with the identifier FWP0001318 and a "Rockleigh Annual Rehabilitation Report 2024" with the identifier ARR0001391.
Companies & ownership
  • Brickworks Limited
    ASX:BKW
Punchbowl

New South Wales, Australia · Processing Facility

Operating
KaolinSilica Sand
Overview
Converted into a terracotta tile operation. Site sold by Brickworks in 2018 and leased back to Austral Bricks. Kiln taken offline in 2021.
Processing
Terracotta tile manufacturing (kiln taken offline in 2021).
Expansion
Converted into a terracotta tile operation. Kiln taken offline in 2021.
Companies & ownership
  • Brickworks Limited
    ASX:BKW
Paddys River

New South Wales, Australia · Quarry

Operating
KaolinSilica Sand
Overview
The Paddys River mine in New South Wales is an operating quarry owned and managed by Brickworks Limited. The primary commodities extracted are kaolin and silica sand.
Companies & ownership
  • Brickworks Limited
    ASX:BKW
New Berrima

New South Wales, Australia · Quarry

Operating
KaolinSilica Sand
Companies & ownership
  • Brickworks Limited
    ASX:BKW
Mulgoa Quarries

New South Wales, Australia · Quarry

Operating
CobaltSoda Ash
Opened
1964-01-01
Workforce
over 110 staff (as of November 2022)
Overview
Mulgoa Quarries has long-term contracts for selective mining and stockpiling of clay and shale for major brick manufacturers, including Austral Bricks (a subsidiary of Brickworks), Boral Bricks, and PGH Bricks & Pavers. It also supplies quarry materials like natural and recycled aggregates, sand, and road base.
Production
over 1,000,000 tonnes of clay and shale annually
Equipment
over 75 items of earthmoving equipment and 28 truck and trailer combinations, including six new Volvo A45 Articulated Dump Trucks, a Caterpillar 352 excavator, and a Caterpillar 336 excavator equipped with GPS technology
Expansion
Quarry East Project, Austral Plant 3 site bulk earthworks for a new masonry plant, roads and factory pads
Companies & ownership
  • Brickworks Limited
    ASX:BKW
Morangup

Western Australia, Australia · Quarry

Operating
KaolinSilica Sand
End year
2069
Mine life
21 years
Overview
The operation involves the extraction and cartage of clay, which is an essential raw material for the manufacturing of roof tiles, bricks, and paving blocks.
Processing
The operation involves the extraction and cartage of clay, which is an essential raw material for the manufacturing of roof tiles, bricks, and paving blocks.
Companies & ownership
  • Brickworks Limited
    ASX:BKW
Marulan Shale Quarry

New South Wales, Australia · Quarry

Operating
KaolinSilica Sand
Production
Annual production capacity of 0-30,000 tonnes.
Companies & ownership
  • Brickworks Limited
    ASX:BKW
Longford

Tasmania, Australia · Quarry

Operating
KaolinSilica Sand
Overview
The Longford quarry in Tasmania, operated by Brickworks Limited, extracts clay and shale to manufacture carbon-neutral clay bricks and pavers, using sawdust as a primary biofuel.
Processing
raw materials are mixed, milled, extruded, fired in a tunnel kiln, cooled, stacked, and packaged
Equipment
kilns
Companies & ownership
  • Brickworks Limited
    ASX:BKW
Lees

Western Australia, Australia · Quarry

Operating
KaolinSilica Sand
Companies & ownership
  • Brickworks Limited
    ASX:BKW
Horsley Park

New South Wales, Australia · Quarry

Operating
KaolinSilica Sand
Companies & ownership
  • Brickworks Limited
    ASX:BKW