Goose Mine

Nunavut, Canada · Open Pit

Operating
Gold
Opened
2025-06-30
End year
2034
Mine life
12 years
Workforce
approximately 1,150 people. Of these, over 200 are Inuit.
Overview
The Goose Mine is located in the Kitikmeot Region of Nunavut, Canada, approximately 400 kilometres southwest of Cambridge Bay. It is part of the larger Back River Gold District, which encompasses an 80-kilometre belt. The project was acquired by B2Gold Corp. through its acquisition of Sabina Gold & Silver Corp. in April 2023. The mine, which is B2Gold's first operating asset in Canada, achieved its first gold pour on 30 June 2025 and reached commercial production on 2 October 2025. The operation is a combined open-pit and underground mine.
Production
Processing plant design throughput of 4,000 tonnes per day.
Processing
Conventional system including crushing, grinding, gravity concentration, agitated leaching, and carbon-in-pulp recovery to produce doré bullion.
Equipment
Haul trucks with a 51-tonne capacity. Loaders with a 17-tonne capacity. A CAT6015 excavator. Two CATD9 dozers. Five CAT775 trucks. One CAT14M grader. Dual control jumbos for underground drilling. Longhole drill rigs. A supplemental mobile crusher.
Expansion
potential for expansion to 6,000 tpd; studying the addition of a semi-autogenous grinding (SAG) mill.
Companies & ownership
  • B2Gold Corp.
    TSX:BTO · NYSE:BTG
  • Sabina Gold & Silver Corp.
    TSX:SBB · OTC:OTCQX
Waihi North Project

Waikato, New Zealand · Underground

Under Development
GoldSilver
Opened
2025-01-01
End year
2043
Mine life
18 years
Workforce
approximately 800 jobs over its 18-year life
Overview
The New Zealand government granted permit approval for the Waihi North Project in December 2025. This allows for the development and operation of the project, which includes the high-grade Wharekirauponga Underground mine (WUG), the Gladstone Open Pit, an expansion of the current processing plant and water treatment plant, and the construction of a new tailings storage facility. The project is a staged expansion of OceanaGold's existing Waihi mining operations.
Processing
Expansion and upgrades to the processing plant to increase throughput capacity, and a water treatment plant.
Equipment
Expansion of current processing plant and water treatment plant, construction of a new tailings storage facility, increased exploration drill pads, six drill rigs.
Expansion
Staged expansion of OceanaGold's existing Waihi mining operations, including the Wharekirauponga Underground mine (WUG), Gladstone Open Pit, processing plant and water treatment plant expansion, and a new tailings storage facility.
Companies & ownership
  • OceanaGold Corporation
Waihi Operation

Waikato, New Zealand · Underground

Operating
Gold
Commodities, grades and output
YearCommodityAv. GradeOutput
2023Gold-49300 oz
Opened
1988-01-01
End year
2038
Capex (est.)
USD 40.00M
Workforce
357 people in 2023
Production
Production overview - 2023: gold 49300 oz.
Processing
The processing method at Waihi involves several stages. Ore is first crushed and then ground in a semi-autogenous grinding (SAG) mill with water and steel balls to form a slurry. Lime and a weak sodium cyanide solution are added to the slurry in leach tanks to dissolve the gold and silver. The slurry then passes through adsorption tanks containing carbon granules, which attract the dissolved gold and silver. The metals are then stripped from the carbon, and through a process of electrowinning, a gold and silver-bearing sludge is produced. This sludge is dried, mixed with fluxes, and smelted in a furnace at 1200 degrees Celsius to form doré bullion bars. These bars, which are approximately 99% pure gold and silver, are then sent to a refinery in Perth, Australia, for final separation.
Expansion
OceanaGold has received permit approval for the Waihi North Project, a significant expansion of the Waihi Operation. This project includes the development of the new high-grade Wharekirauponga Underground (WUG) mine, located about 10 kilometres north of the existing operations. The approval also allows for the expansion of the current processing and water treatment facilities and the construction of a new tailings storage facility. The development of the Waihi North Project is expected to extend the mine life of the Waihi Operation to at least 2038. The existing Martha Underground (MUG) is expected to be the primary source of ore until 2033, with the new Wharekirauponga mine transitioning into the main production source thereafter. First ore from the Wharekirauponga Underground is anticipated in 2032. The company has an early-works capital budget of $40 to $45 million for 2025 to progress design and construction activities for the Waihi North Project. A pre-feasibility study for the Waihi District, which includes both the existing operations and the Wharekirauponga underground mine, projects a combined production of 1.6 million ounces of payable gold over a 15-year mine life. As of February 2025, an initial mineral reserve of 4.1 million tonnes at a grade of 9.2 g/t for 1.21 million ounces of gold has been declared for the Wharekirauponga deposit.
Companies & ownership
  • OceanaGold Corporation
Macraes Operation

Otago, New Zealand · Open Pit

Operating
Gold
Commodities, grades and output
YearCommodityAv. GradeOutput
2023Gold-137018 oz
Opened
1990-01-01
End year
2030
Workforce
around 650 OceanaGold employees and over 200 contractors
Production
Production overview - 2023: gold 137018 oz.
Processing
The processing method involves crushing, grinding, flotation, fine grinding, pressure oxidation, carbon-in-leach, elution, electrowinning, and smelting.
Expansion
OceanaGold is proceeding with the Macraes Phase 4 project, which involves expanding current open pit operations, revisiting previously mined areas, and processing low-grade stockpiled ore. This includes expansions of the Innes Mills and Coronation Pits, and returning to mining at the Golden Bar Pit. A key part of this project is the development of a new tailings storage facility in the existing Frasers Open Pit. The project aims to maintain an approximate annual output of 130,000 ounces.
Companies & ownership
  • OceanaGold Corporation
Haile Gold Mine

South Carolina, USA · Open Pit

Operating
Gold
Companies & ownership
  • OceanaGold Corporation
Didipio Mine

Nueva Vizcaya, Quirino, Philippines · Underground

Operating
GoldCopper
Commodities, grades and output
YearCommodityAv. GradeOutput
2023Gold-138500 oz
2023Copper-14200 t
2022Gold-113200 oz
2022Copper-14400 t
Opened
2013-01-01
End year
2035
Workforce
1,788 (in 2017)
Overview
The Didipio mine is located in Barangay Didipio, Kasibu, in the provinces of Nueva Vizcaya and Quirino on the island of Luzon. It is operated by OceanaGold (Philippines), Inc., a subsidiary of OceanaGold Corporation. Following an Initial Public Offering (IPO) on the Philippine Stock Exchange on 13 May 2024, OceanaGold Corporation holds an 80% indirect interest in the mine. Large-scale open-pit mining was completed in May 2017. Current mining activities are solely from underground operations, which began in 2015, and are supplemented by the processing of surface stockpiles. The underground mining method is longhole open stoping with cemented paste backfill. The operation is governed by a Financial or Technical Assistance Agreement (FTAA) with the Philippine government, which was renewed in 2021 for a 25-year term.
Production
Production overview - 2023: gold 138500 oz, copper 14200 t; 2022: gold 113200 oz, copper 14400 t.
Processing
The processing plant uses a conventional SAG mill-ball mill grinding circuit, froth flotation, and a gravity gold recovery circuit. The combined processing rate of underground ore and surface stockpiles is approximately 4.0 million tonnes per annum (Mtpa).
Expansion
A pre-feasibility study is in progress to identify requirements to support an optimised underground mining production rate of approximately 2.5 Mtpa and to evaluate process plant augmentation needs. This study is expected to be completed in 2026. The company is also conducting exploration to expand resources, including at the Napartan prospect located about nine kilometres from the Didipio mine.
Companies & ownership
  • OceanaGold Corporation
Coronel Oviedo Project

Caaguazú, Paraguay · Solution

Under Development
Uranium
Commodities, grades and output
YearCommodityAv. GradeOutput
2012Uranium0.062 %-
Overview
The Coronel Oviedo Project is an exploration-stage uranium project in central Paraguay, covering over 223,000 acres. It has a geological setting similar to the South Texas uranium belt. UEC conducted drilling in 2012 and has an Exploration Target of 23-56 million pounds grading 0.040%-0.052% U3O8. As of early 2025, UEC is appealing the Paraguayan Ministry of Public Works and Communications' (MOPC) position regarding the extension of concessions.
Processing
Preliminary studies and aquifer tests indicate the project is amenable to in-situ recovery (ISR) methods. The aquifer properties are reported to be within the range of values for other uranium ISR projects in Wyoming, Texas, and Nebraska.
Equipment
UEC owns equipment for radon gas and surface gamma surveys.
Companies & ownership
  • Uranium Energy Corp
    NYSE:UEC
Triangulation Mine

Colorado, United States · Underground

Under Development
Uranium
Overview
The Triangulation Mine, consisting of 12 claims covering 247.92 acres in Colorado, was previously listed as an asset by Uranium Energy Corp. Recent company disclosures have not prominently featured updates on these Colorado holdings.
Companies & ownership
  • Uranium Energy Corp
    NYSE:UEC
US Project

Texas, United States · Processing Facility

Under Development
Rare Earth Elements
Overview
A planned industrial-scale separation and processing facility for Heavy and Light Rare Earth Elements, located in Seadrift, Calhoun County, Texas. It is being developed by Lynas USA LLC in collaboration with the United States Department of Defense to reduce US reliance on foreign rare earth sources. The facility is designed to produce 2,500-3,000 tonnes of heavy rare earth products and about 5,000 tonnes of light rare earths annually, including approximately 1,250 tonnes of NdPr.
Production
designed to have the capacity to produce 2,500 to 3,000 tonnes of heavy rare earth products and about 5,000 tonnes of light rare earths annually, including approximately 1,250 tonnes of neodymium-praseodymium (NdPr)
Processing
state-of-the-art wastewater recovery techniques and environmental controls
Companies & ownership
  • Lynas Rare Earths Ltd
    ASX:LYC · LSE:0A2N · OTC:LYSDY
Unca Creek

Northern Territory, Australia · Open Pit

Under Development
CopperSilverGold
Overview
Unca Creek is an exploration project in the Northern Territory, Australia, operated by KGL Resources (100% ownership) under exploration licence EL 28082. Located 380 km NE of Alice Springs, it surrounds the Jervois Copper Project. The 72.7 sq km tenement, acquired in March 2017, focuses on copper, silver, and gold exploration using advanced 3D modelling and seismic surveys.
Companies & ownership
  • KGL Resources Limited
    ASX:KGL
Jervois Copper Project

Northern Territory, Australia · Open Pit

Under Development
CopperSilverGold
Commodities, grades and output
YearCommodityAv. GradeOutput
2025Copper1.77 %30000 t
2025Silver26.27 g/t1106000 koz
2025Gold0.26 g/t8900 koz
2022Copper2.02 %-
2022Silver25.3 g/t-
2022Gold0.25 g/t-
Mine life
10 years
Workforce
320 (construction), 280 (peak production)
Overview
KGL Resources is advancing toward a Final Investment Decision in 2025, with the goal of bringing Jervois into production in 2027. The project has all necessary approvals to commence construction. The development plan includes two open pits (Reward and Bellbird) and four underground mining areas (Rockface, Reward, Marshall, and Bellbird).
Production
Production overview - 2025: copper 30000 t, silver 1106000 koz, gold 8900 koz.
Processing
The project will use a flotation plant to process up to 2 million tonnes of ore per annum, producing a copper concentrate with by-products. The concentrate will have a grade of 27% copper.
Expansion
KGL Resources is advancing toward a Final Investment Decision in 2025, with the goal of bringing Jervois into production in 2027. The project has all necessary approvals to commence construction. The construction schedule is 18 months, followed by a six-month plant commissioning and ramp-up period. The development plan includes two open pits (Reward and Bellbird) and four underground mining areas (Rockface, Reward, Marshall, and Bellbird). A February 2025 Feasibility Study Update confirmed the project is technically robust and financially viable.
Companies & ownership
  • KGL Resources Limited
    ASX:KGL
Coronel Oviedo Property

Caaguazú, Paraguay · Open Pit

Under Development
Uranium
Companies & ownership
  • Uranium Energy Corp
    NYSE:UEC
Yuty project

Caazapá, Paraguay · Solution

Under Development
Uranium
Commodities, grades and output
YearCommodityAv. GradeOutput
2022Uranium0.04 %2203000 lbs
Overview
The Yuty project is located in southeastern Paraguay. It is in the exploitation phase, having advanced to this stage in 2015. The planned mining method is In-Situ Recovery (ISR), a low-cost and environmentally friendly method. The geology is characterised by roll front mineralisation, similar to Uranium Energy Corp's projects in South Texas and Wyoming. The project holds long-term value, though near-term priorities are on US-based production platforms.
Production
Production overview - 2022: uranium 2203000 lbs.
Companies & ownership
  • Uranium Energy Corp
    NYSE:UEC
Millennium

Saskatchewan, Canada · Underground

Under Development
Uranium
Commodities, grades and output
YearCommodityAv. GradeOutput
2023Uranium2.39 %75.9 Mlbs
Mine life
10 years
Workforce
estimated to employ about 150 people
Overview
The proposed mine is in the Athabasca Basin of northern Saskatchewan, approximately 35 km north of Cameco's Key Lake operation. The project is at a development stage, but its progression is currently on hold.
Production
Production overview - 2023: uranium 75.9 Mlbs.
Processing
The project is planned as a mine-only development, with no on-site milling facilities. Ore would be transported to a licensed mill for processing.
Expansion
The project is at a development stage, but its progression is currently on hold. In May 2014, Cameco announced it would not proceed with the licensing process at that time due to economic conditions, and the environmental assessment and licensing process remains paused. No work is planned for the Millennium project in 2026.
Companies & ownership
  • Uranium Energy Corp
    NYSE:UEC
Kiggavik

Nunavut, Canada · Open Pit

Care And Maintenance
Uranium
Mine life
17 years
Overview
The Kiggavik project is a uranium project located in the Kivalliq region of Nunavut, Canada, approximately 80 kilometres west of Baker Lake. It is currently in a care and maintenance phase. In 2015, the Nunavut Impact Review Board (NIRB) recommended against the project due to an indefinite start date, a decision upheld by the federal Minister in 2016. The project was proposed as a combination of open pit and underground mining operations at two main sites: Kiggavik and Sissons, including a mill to process ore into yellowcake.
Production
7.8 million pounds of uranium per year
Processing
mill to process the ore into yellowcake
Companies & ownership
  • Uranium Energy Corp
    NYSE:UEC
Horseshoe-Raven Project

Saskatchewan, Canada · Open Pit

Under Development
Uranium
Commodities, grades and output
YearCommodityAv. GradeOutput
2022Uranium0.117 %6259.575 t
Overview
The Horseshoe-Raven Project is an advanced exploration stage project owned 100% by Uranium Energy Corp, located in the eastern Athabasca Basin in Saskatchewan, approximately 5 km from Cameco's Rabbit Lake mill. The project has outlined resources and is undergoing resource expansion. It has direct access to all-weather roads and power infrastructure. The uranium mineralisation at the Horseshoe and Raven deposits is hosted in basement rocks with no sandstone cover and is found at depths between 100 m and 450 m below the surface. This suggests the deposits are potentially amenable to development without the need for costly ground freezing.
Production
Production overview - 2022: uranium 6259.575 t.
Processing
A 2016 scoping study indicated that heap leaching is a potential extraction method.
Expansion
undergoing resource expansion
Companies & ownership
  • Uranium Energy Corp
    NYSE:UEC
Shea Creek

Saskatchewan, Canada · Underground

Under Development
Uranium
Companies & ownership
  • Uranium Energy Corp
    NYSE:UEC
Christie Lake Project

Saskatchewan, Canada · Underground

Under Development
Uranium
Commodities, grades and output
YearCommodityAv. GradeOutput
2021Uranium1.57 %20350000 lbs
Overview
The Christie Lake Project is a high-grade, resource-stage uranium project located in the eastern Athabasca Basin of northern Saskatchewan, Canada. It is situated approximately 9 kilometres northeast of Cameco's McArthur River Mine and is considered to be at the exploration and resource-definition stage. The most recent mineral resource estimate for the project has an effective date of 31 December 2021, identifying an inferred mineral resource of 20.35 million pounds of U3O8.
Production
Production overview - 2021: uranium 20350000 lbs.
Expansion
In October 2022, Uranium Energy Corp announced a new discovery of high-grade uranium in an area named the Sakura Zone. Subsequent drilling programs in 2023 continued to expand the footprint of this high-grade mineralisation, with a new resource report planned.
Companies & ownership
  • Uranium Energy Corp
    NYSE:UEC
Roughrider

Saskatchewan, Canada · Underground

Under Development
Uranium
Companies & ownership
  • Uranium Energy Corp
    NYSE:UEC
Crain project

Utah, United States · Open Pit

Under Development
Uranium
Companies & ownership
  • Uranium Energy Corp
    NYSE:UEC
Triangulation properties

Colorado, United States · Open Pit

Under Development
Uranium
Companies & ownership
  • Uranium Energy Corp
    NYSE:UEC
Raven property

Colorado, United States · Open Pit

Under Development
Uranium
Companies & ownership
  • Uranium Energy Corp
    NYSE:UEC
Carnotite property

Colorado, United States · Underground

Under Development
UraniumVanadium
Overview
The Slick Rock Project is a conventional uranium and vanadium project located in San Miguel County, Colorado. It comprises 315 contiguous mineral lode claims covering approximately 5,333 acres.
Companies & ownership
  • Uranium Energy Corp
    NYSE:UEC
Workman Creek Project

Arizona, United States · Underground

Under Development
Uranium
Commodities, grades and output
YearCommodityAv. GradeOutput
2023Uranium0.113 %4459000 lbs
Overview
The Workman Creek Project is a conventional uranium project at the development and exploration stage in Gila County, central Arizona. It consists of 198 unpatented mining claims covering approximately 3,871 acres. An updated 2023 inferred mineral resource estimate is 4,459,000 lbs eU3O8 at 0.113% eU3O8 grade. The project area hosted 18 historic uranium mines (1953-1960) with underground adits and small open cuts. Uranium mineralisation is hosted in flat-lying quartzite.
Production
Production overview - 2023: uranium 4459000 lbs.
Companies & ownership
  • Uranium Energy Corp
    NYSE:UEC