← Map view|Directory

Directory

Browse minesites, mining companies and suppliers. Use the tabs below to switch sections.

Minesites Directory

Browse minesites. Each card shows company ownership and their most recent associated articles.

Filter by mine details and commodity attributes.
Page 101 of 147 (3508 total)
Productora

Atacama Region, Chile · Open Pit

Feasibility
CopperGoldMolybdenumSilver
Mine life
20 years
Overview
The Productora project is an advanced stage copper-gold-molybdenum project operated by Hot Chili Limited. It is located in the Atacama Region of Chile, approximately 600 kilometres north of Santiago and 15 minutes from the city of Vallenar. Productora is a key component of Hot Chili's larger Costa Fuego Copper-Gold Project.
Production
For the integrated Costa Fuego project, the average annual production during the first 14 years is projected to be 95,000 tonnes of copper and 48,000 ounces of gold. Sulphide concentrator throughput of 20.7 Mtpa, oxide leach facility processing 4 Mtpa of ore, producing up to 12,000 tonnes per annum of copper cathode.
Processing
Central processing facilities for the entire Costa Fuego project will be located at Productora. These facilities will include a sulphide concentrator with a nominal throughput of 20.7 million tonnes per annum (Mtpa) to produce copper and molybdenum concentrates with gold and silver credits. Additionally, there will be an oxide leach facility designed to process 4 Mtpa of ore via a heap leach and a solvent extraction-electrowinning (SX-EW) plant to produce up to 12,000 tonnes per annum of copper cathode.
Equipment
truck and shovel operation
Expansion
Productora is a key component of Hot Chili's larger Costa Fuego Copper-Gold Project, which also includes the Cortadera and San Antonio deposits. A Pre-Feasibility Study (PFS) for the integrated Costa Fuego project was announced in March 2025, with a Definitive Feasibility Study (DFS) and an Environmental Impact Assessment (EIA) planned to follow. First production from the Costa Fuego project is anticipated before the end of the decade.
Companies & ownership
  • Hot Chili Limited
    ASX:HCH · TSX:HCH · OTC:HHLKF
Cortadera

Atacama Region, Chile · Open Pit

Feasibility
CopperGoldMolybdenumSilver
Mine life
20 years
Overview
The Cortadera project is a large-scale copper-gold porphyry discovery located in the Atacama Region of Chile. It is operated by the Australian mining company Hot Chili Limited, which holds a 100% interest in the deposit through its wholly-owned subsidiary, Sociedad Minera La Frontera SpA. Cortadera is the centrepiece of Hot Chili's larger Costa Fuego copper-gold project, which also includes the Productora and San Antonio deposits.
Production
The production target for the Cortadera portion of the project is based on 45% of the material from Probable Ore Reserves and 67% from Indicated Mineral Resources.
Processing
Ore from Cortadera is planned to be transported to a central processing facility via a rope conveyor. The centralised processing facilities for the Costa Fuego project will include a 20.7 Mtpa sulphide concentrator and a 4 ktpa cathode solvent extraction, electrowinning (SX-EW) plant. The processing will utilise raw sea water, which will be extracted from a permitted coastal location 60 km from the plant. Metallurgical testwork has indicated weighted recoveries for Cortadera and San Antonio of 82% for copper, 55% for gold, 82% for molybdenum, and 37% for silver.
Equipment
truck and shovel operations, rope conveyor
Expansion
Cortadera is the centrepiece of Hot Chili's larger Costa Fuego copper-gold project, which also includes the Productora and San Antonio deposits. A Pre-Feasibility Study (PFS) was completed in March 2025. An Environmental Impact Assessment for Costa Fuego was planned for submission in 2025.
Companies & ownership
  • Hot Chili Limited
    ASX:HCH · TSX:HCH · OTC:HHLKF
Buckland Project

Western Australia, Australia · Open Pit

Under Development
Iron Ore
Mine life
15 years
Overview
The Buckland Project was a development project in the West Pilbara, Western Australia, focused on iron ore. It included a proposed mine at Bungaroo South and an integrated mine-to-port operation.
Production
Proposed 8 million tonnes per annum (Mtpa) operation. Ore Reserves of 134.3 million tonnes at 57.6% Fe.
Processing
Direct shipping ore (DSO) product.
Equipment
Haul trucks with increased payloads of 260 tonnes per truck and the adoption of a semi-autonomous convoy road haulage solution.
Expansion
Investigation into expanding the proposed infrastructure solution to 20 Mtpa to also serve third parties.
Companies & ownership
  • BC Iron Limited
    ASX:BCI
Nullagine Iron Ore Project

Western Australia, Australia · Open Pit

Care And Maintenance
Iron Ore
Workforce
approximately 30 BC Iron employees and 200 contractors at the time of suspension
Overview
The Nullagine Iron Ore Project is located in the Pilbara region of Western Australia, approximately 140km north of Newman and 20km southwest of Nullagine. It operated as a surface mining operation, initially as a 50/50 joint venture between BC Iron Limited and Fortescue Metals Group, later becoming a 75/25 unincorporated joint venture with BC Iron holding the majority share. Operations were suspended in December 2015 due to a decline in iron ore prices and the project was placed on care and maintenance.
Production
initial production target of 3 million tonnes per annum, with plans to increase to 5 million tonnes per annum
Processing
mining, crushing, and screening the ore on-site using a Striker crushing and screening plant
Equipment
Striker crushing and screening plant, 55km private, sealed haul road, standard road trains, Powertrans Pit Haulers (quad-axle haul trucks with 360 tonnes payload capacity)
Expansion
Nullagine Iron Ore Extension Project proposed to mine an additional 22 million tonnes of iron ore from the Bonnie East and Warrigal North mesas, extending mine life by up to five years
Companies & ownership
  • BC Iron Limited
    ASX:BCI
Häggån Polymetallic Project

Sweden · Open Pit

Under Development
UraniumVanadiumMolybdenumNickel
Companies & ownership
  • Aura Energy Limited
    ASX:AEE · LSE:AURA
Paso Project

Jujuy Province, Argentina · Underground

Closed
Lithium
Overview
The Paso Project is a lithium brine exploration project located in the Jujuy Province of Argentina. It was previously 100% owned by Lake Resources and covered approximately 300 square kilometres. Lake Resources sold the project to Austroid Corporation in November 2024 as part of a strategic shift to focus on its Kachi Project.
Companies & ownership
  • Lake Resources NL
    ASX:LKE
Olaroz Project

Jujuy Province, Argentina · Solution

Historic Mine
Lithium
Overview
The Olaroz Project was a lithium brine project located in the Jujuy Province of Argentina. Lake Resources divested its 100% ownership in November 2024 to Austroid Corporation.
Companies & ownership
  • Lake Resources NL
    ASX:LKE
Cauchari Project

Jujuy Province, Argentina · Solution

Under Development
Lithium
Overview
The Cauchari Project is a lithium brine project located in the Jujuy Province of Argentina, situated in the Lithium Triangle. Drilling confirmed high-grade lithium brines, suggesting an extension from the adjacent world-class Cauchari project.
Processing
direct lithium extraction technology
Companies & ownership
  • Lake Resources NL
    ASX:LKE
Kachi Project

Catamarca Province, Argentina · Solution

Under Development
Lithium
Opened
2027-01-01
End year
2052
Mine life
25 years
Overview
The Kachi Project is a lithium brine project located in Catamarca Province, Argentina, within the Lithium Triangle. It is operated by Australian mining company Lake Resources NL and will employ a direct lithium extraction (DLE) process using ion-exchange technology.
Production
Phase One targets an annual production of 25,000 tonnes of lithium carbonate.
Processing
Direct lithium extraction (DLE) process using ion-exchange technology, involving brine extraction from wells, piping to a brine storage pond, filtering of suspended solids, processing in a direct extraction plant, recovery and concentration into an eluate stream, further concentration and purification using reverse osmosis, and treatment with sodium carbonate to produce lithium carbonate.
Equipment
network of wells for brine extraction and reinjection
Expansion
Phase One targets an annual production of 25,000 tonnes of lithium carbonate. A final investment decision is anticipated by the end of 2026. First commercial production is targeted for 2027.
Companies & ownership
  • Lake Resources NL
    ASX:LKE
Sugar Zone

Ontario, Canada · Underground

Operating
Gold
Companies & ownership
  • Vault Minerals Limited
    ASX:VAU
Spanish Galleon

Western Australia, Australia · Underground

Operating
GoldCopper
Companies & ownership
  • Vault Minerals Limited
    ASX:VAU
Santa Open Pit Complex

Western Australia, Australia · Open Pit

Operating
Gold
Companies & ownership
  • Vault Minerals Limited
    ASX:VAU
Rothsay

Western Australia, Australia · Underground

Operating
Gold
Companies & ownership
  • Vault Minerals Limited
    ASX:VAU
Mount Monger Gold Operations

Western Australia, Australia · Open Pit

Operating
Gold
Companies & ownership
  • Vault Minerals Limited
    ASX:VAU
Darlot

Western Australia, Australia · Underground

Operating
Gold
Companies & ownership
  • Vault Minerals Limited
    ASX:VAU
Deflector Gold-Copper Operations

Western Australia, Australia · Underground

Operating
GoldCopper
Companies & ownership
  • Vault Minerals Limited
    ASX:VAU
Abujar Gold Project

Cavally, Côte d'Ivoire · Open Pit

Operating
Gold
Companies & ownership
  • Tietto Minerals
    ASX:TIE
Endako Mine

British Columbia, Canada · Open Pit

Care And Maintenance
Molybdenum
Companies & ownership
  • Centerra Gold Inc.
    TSX:CG · NYSE:CGAU
Langeloth Metallurgical Facility

Pennsylvania, United States · Processing Facility

Operating
Molybdenum
Companies & ownership
  • Centerra Gold Inc.
    TSX:CG · NYSE:CGAU
Thompson Creek Mine

Idaho, United States · Open Pit

Care And Maintenance
Molybdenum
Companies & ownership
  • Centerra Gold Inc.
    TSX:CG · NYSE:CGAU
Goldfield Project

Nevada, United States · Open Pit

Under Development
Gold
Companies & ownership
  • Centerra Gold Inc.
    TSX:CG · NYSE:CGAU
Kemess Project

British Columbia, Canada · Open Pit

Under Development
GoldCopper
Companies & ownership
  • Centerra Gold Inc.
    TSX:CG · NYSE:CGAU
Öksüt Mine

Kayseri province, Türkiye · Open Pit

Operating
Gold
End year
2029
Mine life
9 years
Workforce
335 employees
Overview
Gold mining operation in Türkiye, located in the Develi district of Kayseri province. It is an open-pit operation with two pits, Keltepe and Güneytepe.
Production
In 2024, 200,525 ounces of gold. For 2025, 127,734 ounces of gold. Production guidance for 2026 is between 250,000 and 280,000 ounces of gold.
Processing
Heap leaching, involving two-stage crushing (jaw and cone crushers), cyanide solution on a heap leach pad, and gold recovery as dore bars via carbon-in-column and ADR plant.
Equipment
36-tonne trucks and CAT 374, CAT 349, and CAT 330 excavators
Companies & ownership
  • Centerra Gold Inc.
    TSX:CG · NYSE:CGAU
PT Trisula Kencana Sakti (TKS)

Central Kalimantan, Indonesia · Open Pit

Operating
Coal
Companies & ownership
  • PT Golden Energy Mines Tbk
Page 101 of 147 (3508 total)