← Map view|Directory

Directory

Browse minesites, mining companies and suppliers. Use the tabs below to switch sections.

Minesites Directory

Browse minesites. Each card shows company ownership and their most recent associated articles.

Filter by mine details and commodity attributes.
Page 100 of 147 (3508 total)
Redcliffe Gold Project

Western Australia, Australia · Open Pit

Under Development
Gold
Overview
The Redcliffe Gold Project is located in the Eastern Goldfields region of Western Australia, approximately 45-60 kilometres northeast of Leonora. The project was previously acquired by Dacian Gold Limited in March 2021 through a merger with NTM Gold Limited. The primary commodity is gold. The project is currently in the development stage, with key approvals in place.
Processing
Proposed processing involves trucking ore to a nearby processing plant, such as the Mt Morgans mill.
Companies & ownership
  • Dacian Gold Limited
    ASX:DCN
Kelly

Western Australia, Australia · Open Pit

Under Development
Gold
Overview
The Kelly deposit is a gold project located in the Eastern Goldfields region of Western Australia, Australia. It forms part of the Redcliffe Project. Geologically, the Kelly deposit is described as being 1,090 metres long and extending 110 metres below the surface. The mineralisation strikes at 000° with a -35° dip to the east and is contained within 15 domains of variable thickness, ranging from 2 to 30 metres with an average width of 10 metres.
Processing
ore to be processed at Mt Morgans processing plant
Companies & ownership
  • Dacian Gold Limited
    ASX:DCN
Bindy

Western Australia, Australia · Open Pit

Feasibility
Gold
Overview
The Bindy deposit is a gold project in the Eastern Goldfields region of Western Australia, approximately 45-60km northeast of Leonora, and is part of the Redcliffe Project. The deposit is 950 metres long and extends 285 metres below the surface, with mineralisation consisting of eight domains averaging 8 metres width. As of 30 June 2021, the Mineral Resource was estimated to be 3,080,000 tonnes at 1.3 grams per tonne of gold, containing 129,000 ounces of gold.
Processing
Ore is expected to be processed at the Jupiter Processing Facility, part of the Mt Morgans Gold Operation.
Companies & ownership
  • Dacian Gold Limited
    ASX:DCN
Nambi

Western Australia, Australia · Open Pit

Under Development
Gold
Overview
Nambi is a gold deposit located in the Eastern Goldfields region of Western Australia, Australia. It is situated approximately 45 kilometres north-east of Leonora. The project is part of Dacian Gold's Redcliffe Gold Project, which the company owns 100%.
Production
The plan projected that the Nambi pit would provide 308,000 tonnes at 2.7g/t for 27,000 ounces.
Expansion
Nambi was intended to be a cutback on the historic pit.
Companies & ownership
  • Dacian Gold Limited
    ASX:DCN
GTS (Gindalbie Tectonic Zone South)

Western Australia, Australia · Open Pit

Under Development
Gold
Opened
2024-01-01
Overview
GTS (Gindalbie Tectonic Zone South) is a gold deposit within the Redcliffe Project, which is part of the Mt Morgans Gold Operation in Western Australia. The project is owned by Dacian Gold, which is a subsidiary of Genesis Minerals Limited. The Redcliffe Project is located 45-60 kilometres northeast of Leonora in the Eastern Goldfields Region of Western Australia, approximately 750 kilometres north-east of Perth.
Production
As of 30 June 2022, the Mineral Resource estimate for the GTS deposit included 930,000 tonnes at 1.9 g/t gold for 56,000 ounces in the indicated category, and 1,360,000 tonnes at 1.2 g/t gold for 51,000 ounces in the inferred category. A 2021 mine plan indicated the GTS pit was expected to provide 293,000 tonnes at 2.4 g/t for 23,000 ounces.
Processing
Metallurgical test work has been conducted, with recoveries based on rock types. Ore from the project would likely be processed at Dacian's 2.9Mtpa CIL treatment plant at the Mt Morgans operation.
Expansion
development was deferred due to a high strip ratio and the required capital investment. Regulatory approvals for mining were pending at that time. A five-year mine plan issued in August 2021 scheduled mining to transition to the GTS deposit during the 2024 financial year.
Companies & ownership
  • Dacian Gold Limited
    ASX:DCN
Hub

Western Australia, Australia · Open Pit

Under Development
Gold
Overview
The Hub deposit is part of the Redcliffe Project, located 45-60km northeast of Leonora in the Eastern Goldfields Region of Western Australia. It is planned as a high-grade open pit mine, with potential for underground extraction. As of October 2023, it was under development with final mining approvals received and an access agreement executed.
Production
A five-year mine plan announced in August 2021 projected the Hub open pit would mine a total of 212,000 tonnes at 5.0 g/t Au for 34,000 ounces. An updated Ore Reserve as of 30 June 2023 for the Hub open pit was 580,000 tonnes at 3.4 g/t for 64,000 ounces. The total Mineral Resource for the Hub deposit as of 30 June 2023 was 1.7 million tonnes at 3.1 g/t for 168,000 ounces.
Processing
Ore from the Redcliffe deposits is expected to be transported to and processed at the Mt Morgans processing plant. Metallurgical test work indicated a fixed gold recovery of 92%.
Companies & ownership
  • Dacian Gold Limited
    ASX:DCN
Heffernans

Western Australia, Australia · Open Pit

Care And Maintenance
Gold
End year
2025
Overview
Heffernans is an open-pit gold mine located in the North Eastern Goldfields region of Western Australia, Australia. It is part of the Jupiter mining complex, which is a component of the larger Mt Morgans Gold Operation (MMGO), owned and operated by Dacian Gold. Heffernans is one of three main syenite pipes that constitute the Jupiter syenite intrusive complex, the other two being Doublejay and Ganymede. This complex has a north-south extent of about 2 kilometres. The mineralisation at Heffernans is described as syenite-related gold mineralisation.
Processing
Carbon-in-Leach (CIL) treatment plant
Companies & ownership
  • Dacian Gold Limited
    ASX:DCN
Doublejay

Western Australia, Australia · Open Pit

Care And Maintenance
Gold
Overview
The Doublejay mine is a key component of the Jupiter open-pit mining complex, which is part of the broader Mt Morgans Gold Operation. The project is located in the Laverton gold district of Western Australia, Australia, approximately 25 to 30 kilometres south-west of Laverton.
Production
For the 2019 financial year, the Jupiter open pit (which includes Doublejay) mined 2 million tonnes of ore for 65,000 ounces of gold. A 2015 scoping study estimated potential high-grade production from the Doublejay open pit as 2.9 million tonnes at a grade of 1.40 grams per tonne (g/t) for 133,000 ounces, with an additional 0.9 million tonnes of low-grade production at 0.57 g/t for 16,000 ounces.
Processing
2.5 million tonnes per annum (Mtpa) Carbon-In-Leach (CIL) treatment plant
Equipment
conventional fleet which can include excavators and haul trucks
Expansion
cut-back of the historic Joanne and Jenny pits; mining conducted in three stages
Companies & ownership
  • Dacian Gold Limited
    ASX:DCN
Mt Marven

Western Australia, Australia · Open Pit

Care And Maintenance
Gold
Workforce
Specific numbers for Mt Marven not detailed. Dacian Gold had 136 employees plus contractors across all operations as of June 2022.
Overview
Mt Marven is an open-pit gold mine operated by Dacian Gold, located in Western Australia, Australia. It is a satellite pit situated approximately 3 kilometres west of the Jupiter processing plant, within the broader Mt Morgans Gold Operation (MMGO) near Laverton.
Production
No specific production figures solely for Mt Marven. Part of Mt Morgans Gold Operation which produced 106,919 ounces of gold in the 2021 financial year and 90,809 ounces in the 2022 financial year. A planned southern extension for FY2023 targeted 27,000 ounces of gold.
Processing
Ore from Mt Marven is transported by road train to the Jupiter Processing Facility for processing. The processing method used at the plant is a Carbon-in-Leach (CIL) process with a nameplate capacity of approximately 2.5 to 3 million tonnes per annum. Metallurgical recoveries from the ore are approximately 92%.
Equipment
trucks and excavators
Expansion
A future southern extension of the Mt Marven pit was planned to mine 662,000 tonnes at 1.3 g/t Au for 27,000 ounces in FY2023.
Companies & ownership
  • Dacian Gold Limited
    ASX:DCN
Cameron Well

Western Australia, Australia · Open Pit

Under Development
Gold
Overview
Cameron Well is a gold prospect located approximately 25 kilometres west of Laverton, Western Australia, as part of Dacian Gold's Mt Morgans Gold Operation (MMGO). Discovered in 2017, it was identified as a significant near-surface oxide gold anomaly. Exploration activities are ongoing, targeting both oxide and primary bedrock mineralisation.
Processing
Ore was intended to be processed at the 2.5Mtpa CIL treatment plant at the Mt Morgans Gold Operation.
Equipment
Potential to utilise synergies with the existing open pit mining fleet and personnel at Mt Morgans.
Companies & ownership
  • Dacian Gold Limited
    ASX:DCN
Jupiter

Western Australia, Australia · Open Pit

Care And Maintenance
Gold
Workforce
The Mt Morgans Gold Operation includes a 400-person mining camp.
Overview
The Jupiter mine is a large open pit gold mine located in the Laverton gold district of Western Australia, approximately 20 to 35 kilometres southwest of Laverton. It is part of the Mount Morgans Gold Operation (MMGO). The mine area is defined by a single large open pit, 1.8 kilometres long, up to 650 metres wide, and 220 metres deep, consisting of several sub-pits including Doublejay, Heffernans, Saddle, Ganymede, and Mt Marven.
Production
For the 2022 financial year, 2,674 kilotonnes of ore at a grade of 1.0 g/t Au, containing 86,537 ounces of gold, was mined from the Mt Morgans open pits.
Processing
Adjacent Jupiter Processing Facility (Mt Morgans mill), a Carbon-In-Leach (CIL) treatment plant with a capacity of 2.5-2.9 million tonnes per annum (Mtpa).
Equipment
Standard open pit mining equipment, 19.8 MW gas-fired power station. Contract with Macmahon Holdings for drilling and blasting, loading, hauling, and technical services.
Companies & ownership
  • Dacian Gold Limited
    ASX:DCN
Ramornie Complex

Western Australia, Australia · Open Pit

Care And Maintenance
Gold
Overview
Ramornie is a gold deposit located in the Eastern Goldfields region of Western Australia, forming part of the Mt Morgans Gold Operation. The project consists of the Ramornie, Ramornie North, and Sarah open pits, collectively known as the Ramornie Complex. Gold mineralisation is hosted within north-northeast trending shear-hosted lodes in greenschist facies altered basalt flows. The deposit has potential for both open pit and underground mining.
Processing
Ore from any future mining at the Ramornie Complex is intended to be processed at the Jupiter Processing Facility, part of the Mt Morgans infrastructure.
Companies & ownership
  • Dacian Gold Limited
    ASX:DCN
Craic

Western Australia, Australia · Underground

Under Development
Gold
Overview
The Craic deposit is a gold project located in Western Australia, Australia, part of the Mt Morgans Gold Operation (MMGO) near Laverton. It has been subject to both open pit and underground mining in the past. A five-year mine plan outlined intentions for an underground mining campaign for FY2023, targeting 13,000 ounces of gold.
Production
Targeting the production of 66,000 tonnes at 6.1 g/t Au for 13,000 ounces of supplementary high-grade mill feed in FY2023. Mineral Resource (July 2023): 100,000 tonnes at 6.5 g/t for 21,000 ounces (Inferred: 70,000 tonnes at 5.9 g/t for 13,000 ounces; Indicated: 30,000 tonnes at 7.9 g/t for 8,000 ounces).
Processing
Ore from the Mt Morgans operations is processed at a 2.5Mtpa Carbon-In-Leach (CIL) treatment plant.
Expansion
Dewatering the underground mine and rehabilitating the existing decline during FY2022 to enable grade control infill drilling, followed by an underground mining campaign for FY2023.
Companies & ownership
  • Dacian Gold Limited
    ASX:DCN
Transvaal project

Western Australia, Australia · Underground

Care And Maintenance
Gold
Opened
2020-01-01
Overview
The Transvaal project, operated by Dacian Gold, is an underground gold mine located within the broader Mt Morgans Gold Operation, approximately 25 kilometres west of Laverton in the North Eastern Goldfields region of Western Australia, Australia. The project is situated on mining lease M39/228, which is 100% owned by Mt Morgans WA Mining Pty Ltd, a subsidiary of Dacian Gold. The Transvaal deposit is characterised as an Archean lode gold style deposit. Gold mineralisation is primarily hosted within altered basalt.
Processing
Carbon-In-Leach (CIL) treatment plant
Companies & ownership
  • Dacian Gold Limited
    ASX:DCN
Allanson

Western Australia, Australia · Underground

Care And Maintenance
Gold
Opened
2018-01-01
Overview
Allanson is an underground mine, part of the Westralia Mine Area at the Mt Morgans Gold Operation, which is owned by Dacian Gold. It is located in the Laverton gold district of Western Australia, Australia, approximately 25 kilometres west of the town of Laverton. It is one of two underground mines that make up the Westralia Mine Area, the other being Beresford. The mine is accessed via the rehabilitation of an existing portal and decline.
Processing
2.5 million tonnes per annum Carbon-In-Leach (CIL) treatment plant
Companies & ownership
  • Dacian Gold Limited
    ASX:DCN
Beresford

Western Australia, Australia · Underground

Care And Maintenance
Gold
Overview
Beresford is an underground gold mine located in the Goldfields region of Western Australia, Australia. It is part of the Westralia Mine Area within the broader Mt Morgans Gold Project, situated near Laverton. The mine consists of the Beresford South and Beresford North declines. The first cut of the Beresford portal was established at the base of the historical Westralia open pit. The mine, along with the nearby Allanson mine, was developed to access high-grade gold lodes beneath the previously mined open pit.
Production
Combined 101,000 tonnes of ore at 3.4 g/t gold (FY22, with Westralia and Craic); Mt Morgans operation milled 2.91 million tonnes, producing 90,809 ounces of gold (FY22).
Processing
carbon-in-leach (CIL) processing
Companies & ownership
  • Dacian Gold Limited
    ASX:DCN
Westralia Mining Area

Western Australia, Australia · Underground

Care And Maintenance
Gold
Overview
Westralia Mining Area is a component of the Mt Morgans Gold Operation, which is owned by Dacian Gold and located near Laverton in Western Australia, Australia. The project is situated approximately 30 kilometres southwest of Laverton, within the Shire of Laverton. The Westralia Mining Area itself is part of the broader Greater Westralia Mining Area (GWMA).
Production
In the 2019 financial year, the Westralia underground mine produced over 830,000 tonnes of ore for 85,000 ounces of gold mined. For the first half of the 2020 financial year, the underground mine production at Westralia was 417,000 tonnes at 2.7 g/t for 36,526 ounces of contained gold.
Processing
conventional Carbon-In-Leach (CIL) processing
Equipment
2.5 million tonne per annum (mtpa) CIL treatment plant, 400-person accommodation village and other related mine infrastructure
Expansion
two new underground mines, Beresford and Allanson, developed beneath the historically mined Westralia pit
Companies & ownership
  • Dacian Gold Limited
    ASX:DCN
Mount Morgans Gold Operation

Western Australia, Australia · Open Pit

Care And Maintenance
Gold
Workforce
In 2021, 141 direct employees and 365 contractors for specialist services and mining operations (company-wide).
Overview
Gold mine in the Laverton gold district, Western Australia, 20-37 km west-southwest of Laverton. Features both open pit (Jupiter complex including Heffernans, Doublejay, Ganymede deposits) and underground (Westralia mine area including Beresford, Allanson mines) operations.
Production
FY 2019: 138,911 oz gold; FY 2020: 138,814 oz gold (AISC $1,619/oz); FY 2022: 90,809 oz gold (AISC $1,955/oz); Dec 2022 Q: 12,039 oz gold. Processing plant capacity: 2.5-2.9 Mtpa.
Processing
carbon-in-leach (CIL) treatment facility
Equipment
Processing plant, tailings storage facility, water supply, workshops, offices, 400-person accommodation, 19.8 MW gas-fired power station. Open pit: Epiroc SmartROC T45 rigs. Underground: twin boom jumbos, 10-15t loaders, 60t trucks.
Companies & ownership
  • Dacian Gold Limited
    ASX:DCN
Huasco Water Project

Atacama Region, Chile · Processing Facility

Under Development
Overview
The Huasco Water Project is a water infrastructure initiative focused on the extraction, treatment, and transport of seawater and desalinated water for industrial use, primarily to support mining operations.
Production
The first stage of the project is designed to pump 500 litres of raw seawater per second. Future stages aim to expand capacity, with a second stage introducing the desalination plant to supply 1300 L/s, and a potential third stage to increase desalinated supply to 2300 L/s. There is an identified demand of over 4,000 L/s for desalinated water in the region.
Processing
extraction of seawater, followed by treatment and desalination using a reverse osmosis plant to produce water suitable for industrial use.
Equipment
seawater intake facilities, a modular reverse osmosis desalination plant, seven strategically located pumping stations, and a large-diameter pipeline system. The initial phase involves a single pipeline running 62km from the Pacific Ocean to the Costa Fuego copper-gold project.
Expansion
Future stages aim to expand capacity, with a second stage introducing the desalination plant to supply 1300 L/s, and a potential third stage to increase desalinated supply to 2300 L/s.
Companies & ownership
  • Hot Chili Limited
    ASX:HCH · TSX:HCH · OTC:HHLKF
Valentina copper deposit

Atacama Region, Chile · Underground

Under Development
CopperSilver
Opened
1953-01-01
Overview
The Valentina project is a high-grade copper-silver deposit located in the coastal range of the Atacama Region, Chile. It is part of Hot Chili Limited's El Fuego project, which is a component of the larger Costa Fuego Copper-Gold Project. Current activities are focused on resource definition and exploration to assess its potential as a satellite high-grade ore source for the Costa Fuego development.
Processing
Metallurgical test work has indicated the ore is amenable to flotation. The intention is for ore from El Fuego to be processed through a central plant as part of the integrated Costa Fuego hub.
Equipment
Exploration activities have utilised drill rigs, including diamond drill (DD) and Reverse Circulation (RC) rigs. At one point, two drill rigs were in operation across the Valentina and San Antonio deposits.
Expansion
Hot Chili Limited has moved to secure 100% ownership of the Valentina landholdings through a renegotiated option agreement termed the "El Fuego Option", which is exercisable in September 2026. Previously, the company had an agreement to acquire a 90% interest.
Companies & ownership
  • Hot Chili Limited
    ASX:HCH · TSX:HCH · OTC:HHLKF
Costa Fuego Copper-Gold Project

Atacama, Chile · Open Pit

Feasibility
CopperGoldSilverMolybdenum
Mine life
20 years
Overview
The Costa Fuego Copper-Gold Project is a significant copper and gold development located in the Atacama region of Chile, approximately 600 km north of Santiago and 17 km south of the town of Vallenar. The project consolidates several deposits within a 10 km radius, primarily Productora, Cortadera, and San Antonio.
Production
expected to produce an average of 95,000 tonnes of copper and 48,000 ounces of gold annually over the first 14 years; forecast to deliver 1.5 million tonnes of copper and 780,000 ounces of gold over the full 20-year mine life.
Processing
central processing plant at Productora site; sulphide concentrator for transitional and fresh ore; heap leach circuit for oxide ore; low-grade dump leach for all material classifications; oxide processing circuit includes crushing, agglomeration, and a Solvent Extraction/Electrowinning (SX/EW) plant; pyrite flotation also considered.
Equipment
electric-powered mining fleet, truck and shovel operations
Companies & ownership
  • Hot Chili Limited
    ASX:HCH · TSX:HCH · OTC:HHLKF
La Verde Discovery

Atacama, Chile · Open Pit

Under Development
CopperGold
Overview
La Verde Discovery is a copper-gold porphyry discovery operated by Hot Chili Limited. It is located in the Atacama region of Chile, approximately 30 kilometres south of the company's planned central processing hub for its Costa Fuego project. The project is envisioned as a potential open-pit mine.
Processing
No processing plant at La Verde; planned to be integrated with the Costa Fuego project's central processing hub. Initial metallurgical test work indicated similar recoveries to Costa Fuego, using seawater for processing.
Equipment
diamond drill (DD) rigs, Reverse Circulation (RC) drill rigs, ground magnetics surveys, surface geochemical sampling
Expansion
potential high-grade starter pit for the larger Costa Fuego project, could add significant open-pit material to the front end of Costa Fuego's mine schedule
Companies & ownership
  • Hot Chili Limited
    ASX:HCH · TSX:HCH · OTC:HHLKF
Valentina Mine

Atacama Region, Chile · Underground

Under Development
CopperGoldSilver
Overview
Located near San Antonio, Valentina is also a historic underground copper mine. It is part of the El Fuego Copper Project, which is in an exploration and resource definition phase.
Companies & ownership
  • Hot Chili Limited
    ASX:HCH · TSX:HCH · OTC:HHLKF
San Antonio Mine

Atacama Region, Chile · Underground

Under Development
CopperGoldSilver
Opened
1964-01-01
Overview
This historic underground mine has reportedly produced approximately 2 million tonnes of ore at a grade of 2% copper and 0.3 g/t gold since mining began in 1964. The mineralisation is associated with a sequence of moderately east-dipping sandstone and limestone/andesite units with extensive skarn alteration. Hot Chili is conducting drilling programs to define and upgrade the resource, with the aim of incorporating it into the larger Costa Fuego development plan as a potential open-pit operation.
Companies & ownership
  • Hot Chili Limited
    ASX:HCH · TSX:HCH · OTC:HHLKF
Page 100 of 147 (3508 total)