← Map view|Directory

Directory

Browse minesites, mining companies and suppliers. Use the tabs below to switch sections.

Minesites Directory

Browse minesites. Each card shows company ownership and their most recent associated articles.

Filter by mine details and commodity attributes.
Page 2 of 8 (190 total)
Raven property

Colorado, United States · Open Pit

Under Development
Uranium
Companies & ownership
  • Uranium Energy Corp
    NYSE:UEC
Carnotite property

Colorado, United States · Underground

Under Development
UraniumVanadium
Overview
The Slick Rock Project is a conventional uranium and vanadium project located in San Miguel County, Colorado. It comprises 315 contiguous mineral lode claims covering approximately 5,333 acres.
Companies & ownership
  • Uranium Energy Corp
    NYSE:UEC
Workman Creek Project

Arizona, United States · Underground

Under Development
Uranium
Commodities, grades and output
YearCommodityAv. GradeOutput
2023Uranium0.113 %4459000 lbs
Overview
The Workman Creek Project is a conventional uranium project at the development and exploration stage in Gila County, central Arizona. It consists of 198 unpatented mining claims covering approximately 3,871 acres. An updated 2023 inferred mineral resource estimate is 4,459,000 lbs eU3O8 at 0.113% eU3O8 grade. The project area hosted 18 historic uranium mines (1953-1960) with underground adits and small open cuts. Uranium mineralisation is hosted in flat-lying quartzite.
Production
Production overview - 2023: uranium 4459000 lbs.
Companies & ownership
  • Uranium Energy Corp
    NYSE:UEC
Dry Mountain properties

Arizona, United States · Open Pit

Under Development
Uranium
Companies & ownership
  • Uranium Energy Corp
    NYSE:UEC
Crow Canyon

Arizona, United States · Open Pit

Under Development
Uranium
Companies & ownership
  • Uranium Energy Corp
    NYSE:UEC
Esther Basin

Arizona, United States · Open Pit

Under Development
Uranium
Companies & ownership
  • Uranium Energy Corp
    NYSE:UEC
Artillery Peak

Arizona, United States · Open Pit

Historic Mine
Uranium
Companies & ownership
  • Uranium Energy Corp
    NYSE:UEC
Los Cuatros Project

Arizona, United States · Open Pit

Feasibility
Uranium
Overview
The Los Cuatros Project, operated by Uranium Energy Corp (UEC), is an exploration-stage uranium project located in Maricopa County, Arizona, in the United States. Formerly known as the New River Project, the site is situated on state lands in a region with a history of mining. UEC holds a 100% interest in the project.
Companies & ownership
  • Uranium Energy Corp
    NYSE:UEC
Anderson Project

Arizona, United States · Open Pit

Feasibility
Uranium
Commodities, grades and output
YearCommodityAv. GradeOutput
2022Uranium0.099 %14539.9 t
Mine life
14 years
Capex (est.)
USD 51.90M
Overview
The Anderson Project is situated in Yavapai County in west-central Arizona, approximately 75 miles northwest of Phoenix. The project spans 8,268 acres, consisting of 386 unpatented lode mining and placer claims and one section of Arizona State land. The project is considered to be at an advanced stage. However, as of 2025, it is still classified as being in the exploration stage. The proposed mining method is a combination of conventional open-pit and underground mining. The northern part of the project area contains the open-pit resource, while the southern section holds the underground resource.
Production
Production overview - 2022: uranium 14539.9 t.
Processing
Metallurgical testing has shown that uranium can be recovered using conventional heap leach methods. The process would involve producing loaded resin to be transported to the White Mesa Mill located near Blanding, Utah.
Companies & ownership
  • Uranium Energy Corp
    NYSE:UEC
Grants Ridge project

New Mexico, United States · Open Pit

Closed
Uranium
Companies & ownership
  • Uranium Energy Corp
    NYSE:UEC
Laguna Trend project

New Mexico, United States · Open Pit

Under Development
Uranium
Companies & ownership
  • Uranium Energy Corp
    NYSE:UEC
West Ranch project

New Mexico, United States · Open Pit

Under Development
Uranium
Overview
The West Ranch project is situated in northwestern New Mexico, at the northwest end of the Ambrosia Lake trend within the Grants Uranium District. The project consists of approximately 3,180 acres of lode mining claims and private leases. Historical drilling by previous owners indicated the presence of uranium mineralisation.
Companies & ownership
  • Uranium Energy Corp
    NYSE:UEC
Charlie Project

Wyoming, United States · Solution

Feasibility
Uranium
Overview
The Charlie Project is a uranium project located in Johnson County, Wyoming, United States. It is owned by Uranium Energy Corp (UEC). The project is at an exploration stage, although it is intended to be mined as part of the Christensen Ranch mine plan. The planned mining method is In-Situ Recovery (ISR).
Expansion
UEC intends to update the existing Wyoming Department of Environmental Quality Permit to Mine to current standards for ISR mining and incorporate the project as two additional Mine Units of the Christensen Ranch Project.
Companies & ownership
  • Uranium Energy Corp
    NYSE:UEC
Barge

Wyoming, United States · Solution

Under Development
Uranium
Processing
As part of Uranium Energy Corp's Wyoming hub-and-spoke strategy, uranium recovered from the Barge project will be processed at the central processing plant (CPP) at Irigaray. The Irigaray plant has a licensed production capacity of 4.0 million pounds of U3O8 per year.
Companies & ownership
  • Uranium Energy Corp
    NYSE:UEC
Allemand-Ross

Wyoming, United States · Solution

Under Development
Uranium
Commodities, grades and output
YearCommodityAv. GradeOutput
2021Uranium0.08324 %459400 lbs
Production
Production overview - 2021: uranium 459400 lbs.
Companies & ownership
  • Uranium Energy Corp
    NYSE:UEC
Mud Springs property

Wyoming, United States · Open Pit

Under Development
Uranium
Overview
The property consists of 120 claims and one lease, totalling 3,014.48 acres. The project is situated along a U3O8 mineralised Wind River Formation trend. UEC had plans for approximately 16,000 feet of drilling on the property in 2008 and intended to acquire an additional 700 acres by staking 34 more mining claims.
Companies & ownership
  • Uranium Energy Corp
    NYSE:UEC
Burnt Wagon prospect

Wyoming, United States · Open Pit

Under Development
Uranium
Companies & ownership
  • Uranium Energy Corp
    NYSE:UEC
Jackpot Mine Project

Wyoming, United States · Open Pit

Under Development
Uranium
Overview
The Jackpot Mine Project is an asset of Uranium Energy Corp (UEC) located in Wyoming, United States, and is part of the Green Mountain Project. It is a permitted project for conventional mining methods, currently listed as an open pit mine, though historically considered for underground mining.
Expansion
Acquired by UEC as part of the Green Mountain Project along with the Sweetwater Uranium Complex from a subsidiary of Rio Tinto, finalised in December 2024.
Companies & ownership
  • Uranium Energy Corp
    NYSE:UEC
Sweetwater Project

Wyoming, United States · Processing Facility

Under Development
Uranium
Overview
The Sweetwater Project includes the Sweetwater Processing Plant, which is a fully licensed conventional uranium mill with a capacity of 3,000 tons per day. The plant has an existing licensed production capacity of 4.1 million pounds of U3O8 per year.
Processing
The project includes the Sweetwater Processing Plant, which is a fully licensed conventional uranium mill with a capacity of 3,000 tons per day. The plant has an existing licensed production capacity of 4.1 million pounds of U3O8 per year.
Expansion
The Sweetwater Project is being advanced as Uranium Energy Corp's third hub-and-spoke production platform. In August 2025, the project was designated for fast-track permitting by the U.S. Federal Permitting Improvement Steering Council to add in-situ recovery (ISR) capability. This will make the Sweetwater facility the largest dual-feed uranium facility in the United States, licensed to process both conventional ore and ISR resin. Engineering plans for the refurbishment of the mill and for the addition of ISR processing capabilities have been initiated. A 200-hole delineation drilling program for the first wellfield at Sweetwater commenced on 2 March 2026. A Plan of Operations was submitted to the Bureau of Land Management on 14 November 2025. Uranium Energy Corp has stated that the acquisition of the project included over 175 million pounds of historic uranium resources, though these are historical estimates. The company announced in June 2025 that it expected to issue a Technical Report Summary for the Great Divide Basin Hub-and-Spoke, which includes the Sweetwater Project, by the end of fiscal 2025.
Companies & ownership
  • Uranium Energy Corp
    NYSE:UEC
Sweetwater Mill

Wyoming, United States · Processing Facility

Care And Maintenance
Uranium
Opened
1981-01-01
Overview
The Sweetwater Mill is a conventional uranium mill with a licensed capacity of 4.1 million pounds of U3O8 per year and a processing capacity of 3,000 tons of ore per day. It is a key component of UEC's third hub-and-spoke production platform in the United States. The company is advancing development plans for the facility, which include initiating drilling and engineering for mill refurbishment. It has been designated as a transparency project under the FAST-41 initiative to fast-track permitting for In-Situ Recovery (ISR) mining methods.
Production
The facility is not currently in production. The licensed production capacity is 4.1 million pounds of U3O8 per year.
Processing
conventional acid leach processing facility. UEC plans to adapt the plant for the recovery of uranium from loaded resins produced by ISR operations, in addition to its conventional milling capabilities.
Equipment
mill building, a solvent extraction (SX) building, a main shop, an administration building, and a warehouse
Expansion
advancing development plans for the facility, which include initiating drilling and engineering for mill refurbishment. A 200-hole delineation drilling program for the first wellfield at Sweetwater commenced on 2 March 2026. UEC's primary objective for this permitting initiative is to enable In-Situ Recovery (ISR) mining methods, which would make Sweetwater the largest licensed, dual-feed uranium facility in the United States, capable of processing both conventional ore and ISR resins.
Companies & ownership
  • Uranium Energy Corp
    NYSE:UEC
Irigaray

Wyoming, United States · Solution

Operating
Uranium
Commodities, grades and output
YearCommodityAv. GradeOutput
2023Uranium0.076 %2675.78 t
Workforce
63 (for Christensen Ranch and Irigaray operations)
Overview
The Irigaray facility is a Central Processing Plant (CPP) that serves as the hub for Uranium Energy Corp's satellite in-situ recovery (ISR) projects in the Powder River Basin. Uranium-loaded resin from satellite operations, such as the recently restarted Christensen Ranch project, is transported to the Irigaray plant for processing. In February 2025, the Irigaray plant achieved a key milestone by producing its first drummed uranium concentrate since the restart of operations. The plant is now operating on a 24/7 basis after a full refurbishment of the calciner to increase throughput of dried yellowcake.
Production
Production overview - 2023: uranium 2675.78 t.
Processing
in-situ recovery (ISR)
Expansion
The Wyoming Department of Environmental Quality has approved an increase in the Irigaray plant's licensed production capacity from 2.5 million pounds of U3O8 per year to 4.0 million pounds of U3O8 per year.
Companies & ownership
  • Uranium Energy Corp
    NYSE:UEC
Christensen Ranch

Wyoming, United States · Solution

Operating
Uranium
Commodities, grades and output
YearCommodityAv. GradeOutput
2025Uranium-199000 lbs
Workforce
84 personnel
Overview
Uranium Energy Corp (UEC) restarted operations at the Christensen Ranch in-situ recovery (ISR) mine in August 2024. The uranium recovered is processed at UEC's Irigaray Central Processing Plant (CPP), which serves as the hub for its projects in the Powder River Basin. The first drummed uranium concentrate from this renewed operation was produced in February 2025.
Production
Production overview - 2025: uranium 199000 lbs.
Processing
in-situ recovery (ISR)
Expansion
The company is expanding production, and as of March 2026, it had secured state regulatory approval to operate three additional header houses in wellfield 11. Uranium extraction from these new header houses has commenced. One more header house is awaiting approval, and three others are under construction in wellfield 12 and the 10-extension.
Companies & ownership
  • Uranium Energy Corp
    NYSE:UEC
North Reno Creek

Wyoming, United States · Solution

Under Development
Uranium
Commodities, grades and output
YearCommodityAv. GradeOutput
2021Uranium0.041 %11793.400000000001 t
Opened
2015-01-01
Production
Production overview - 2021: uranium 11793.400000000001 t.
Processing
in-situ recovery (ISR)
Companies & ownership
  • Uranium Energy Corp
    NYSE:UEC
Reno Creek Project

Wyoming, United States · Solution

Under Development
Uranium
Production
up to 2 million pounds of U3O8 per year
Processing
in-situ recovery (ISR)
Companies & ownership
  • Uranium Energy Corp
    NYSE:UEC
Page 2 of 8 (190 total)