← Map view|Directory

Directory

Browse minesites, mining companies and suppliers. Use the tabs below to switch sections.

Minesites Directory

Browse minesites. Each card shows company ownership and their most recent associated articles.

Filter by mine details and commodity attributes.
Page 1 of 8 (190 total)
Arrow Deposit

Saskatchewan, Canada · Underground

Under Development
Uranium
Commodities, grades and output
YearCommodityAv. GradeOutput
2025Uranium2.37 %240 Mlbs
2022Uranium4.35 %209.6 Mlbs
2019Uranium4.03 %256.6 Mlbs
Mine life
10.7 years
Workforce
average of 1,400 total jobs annually during the development and 11-year production period
Overview
The Arrow Deposit, part of the Rook I Project, is operated by NexGen Energy Ltd. and is situated in the southwestern Athabasca Basin of Saskatchewan, Canada. The project is 100% owned by NexGen Energy Ltd. The Arrow Deposit is a land-based, basement-hosted uranium deposit. The planned mining method is conventional long-hole stope mining in an underground operation. Access to the mine will be via two shafts: a production shaft and an exhaust shaft.
Production
Production overview - 2025: uranium 240 Mlbs; 2022: uranium 209.6 Mlbs.
Processing
The on-site processing plant will have a nominal mill capacity of 1,300 tonnes per day. The processing method will involve a simplified circuit due to the clean metallurgy of the ore.
Equipment
three trucks per day will be required to feed the mill
Companies & ownership
  • NexGen Energy Ltd.
    ASX:NXG · TSX:NXE · NYSE:NXE
SW3 Property

Saskatchewan, Canada · Underground

Under Development
Uranium
Companies & ownership
  • NexGen Energy Ltd.
    ASX:NXG · TSX:NXE · NYSE:NXE
SW1 Property

Saskatchewan, Canada · Underground

Under Development
Uranium
Companies & ownership
  • NexGen Energy Ltd.
    ASX:NXG · TSX:NXE · NYSE:NXE
Rook I Project

Saskatchewan, Canada · Underground

Under Development
Uranium
Mine life
24 years
Workforce
An economic impact study forecasts an average of 1,400 annual total jobs over the development and initial 11-year production period.
Production
Capable of producing up to 30 million pounds of uranium annually. A 2021 feasibility study projected annual production of up to 14 million kilograms of U3O8.
Processing
The project will include an onsite mill to process an average of 1,400 tonnes of ore per day. Facilities will support the extraction and processing of uranium ore from the Arrow Deposit.
Expansion
Final regulatory approval received (Licence to Prepare Site and Construct) on March 5, 2026. Provincial environmental approval in November 2023. Final investment decision made, construction scheduled for summer 2026, expected to take four years. The licence is valid until March 31, 2036.
Companies & ownership
  • NexGen Energy Ltd.
    ASX:NXG · TSX:NXE · NYSE:NXE
Shoobridge Project

Northern Territory, Australia · Open Pit

Under Development
LithiumGoldTinTantalumUranium
Overview
The Shoobridge Project is an exploration-stage project operated by Core Lithium Ltd in the Northern Territory, Australia, focused on lithium, gold, tin, tantalum, uranium, and base metals within the Pine Creek Orogen. Exploration activities include RC and diamond drilling.
Equipment
reverse circulation (RC) and diamond drilling
Companies & ownership
  • Core Lithium
    ASX:CXO · OTC:CXOXF
Olympic Dam

South Australia, Australia · Underground

Operating
CopperGoldUranium
Commodities, grades and output
YearCommodityAv. GradeOutput
2025Copper-316 kt
2025Gold-361 koz
2025Uranium-3.2 kt
2024Copper-322 kt
2024Gold-370 koz
2024Uranium-3.6 kt
Opened
1988-01-01
Workforce
BHP has approximately 8,000 employees working across its Copper SA projects, which includes Olympic Dam.
Overview
Olympic Dam is one of the world's most significant polymetallic orebodies, comprising an underground mine and a fully integrated processing facility. It is located 560 kilometres north of Adelaide. The operation is a part of BHP's Minerals Australia operation and has been owned and operated by BHP since 2005.
Production
Production overview - 2025: copper 316 kt, gold 361 koz, uranium 3.2 kt; 2024: copper 322 kt, gold 370 koz, uranium 3.6 kt.
Processing
The operation features a fully integrated metallurgical complex. This includes a grinding and concentrating circuit, a hydrometallurgical plant with solvent extraction for copper and uranium, a copper smelter, a copper refinery, and a recovery circuit for precious metals.
Equipment
Ore is hauled underground via an automated train system to crushing, storage, and hoisting facilities.
Expansion
BHP is advancing a series of growth projects at Olympic Dam. A new decline to the Southern Mine Area is progressing, with completion expected in FY2028, which is anticipated to unlock up to 2.5 million tonnes per annum of additional vertical capacity. The company is also studying a potential Smelter and Refinery Expansion (SRE). A potential Final Investment Decision is on track for the 2027 calendar year. The first phase would increase concentrate smelting capacity to between 1,100 and 1,400 ktpa.
Companies & ownership
  • BHP Group
    ASX:BHP
Olympic Dam

South Australia, Australia · Underground

Operating
UraniumCopperGoldSilver
Commodities, grades and output
YearCommodityAv. GradeOutput
2024Uranium590 g/t3603 t
2023Copper1.85 %212000 t
2023Gold0.67 g/t186000 oz
2023Uranium590 g/t3406 t
2023Silver4 g/t-
Opened
1988-01-01
End year
2081
Workforce
Approximately 8000 employees work across BHP's Copper SA projects, with about 2500 of those working underground at Olympic Dam and 1000 in surface processing.
Production
Production overview - 2024: uranium 3603 t; 2023: copper 212000 t, gold 186000 oz, uranium 3406 t.
Processing
The Olympic Dam operations include a fully integrated underground mine and an above-ground metallurgical complex. Ore mined underground is transported by an automated train system to crushing, storage, and hoisting facilities. The metallurgical complex features a grinding and concentrating circuit, a hydrometallurgical plant with solvent extraction for copper and uranium, a copper smelter, a copper refinery, and a recovery circuit for precious metals.
Expansion
BHP is investing over A$840 million in several projects to enhance productivity at Olympic Dam. This investment includes developing an underground access tunnel into the Southern Mine Area, a new backfill system to access new sections of the mine, expanding the ore pass capacity, and installing a new oxygen plant to improve smelter performance. The company is also assessing options for a new two-stage smelter, with a final investment decision anticipated between the 2026 and 2027 financial years. There are plans to potentially increase annual copper production at Copper South Australia to over 500,000 tonnes per annum.
Companies & ownership
  • BHP Group
    ASX:BHP
Olympic Dam

South Australia, Australia · Underground

Operating
CopperUraniumGoldSilver
Capex (est.)
USD 200.00M
Overview
Olympic Dam is a fully integrated metallurgical complex, processing ore to metal on-site. It includes a grinding and concentrating circuit, a hydrometallurgical plant with solvent extraction for copper and uranium, a copper smelter, and a refinery that also recovers precious metals. The underground mine features an automated train system and over 700 kilometres of underground roads and tunnels.
Processing
fully integrated metallurgical complex, processing ore to metal on-site, including a grinding and concentrating circuit, a hydrometallurgical plant with solvent extraction for copper and uranium, a copper smelter, and a refinery that also recovers precious metals.
Equipment
automated train system, underground electric rail network, locomotives, oxygen plant
Expansion
Investment of over A$840 million in several projects at Olympic Dam to improve productivity and support future growth, including a new underground access tunnel (decline) into the Southern Mine Area, a new backfill system, expansion of the underground electric rail network, and installation of a new oxygen plant. The Southern Mining Area Decline project, approved for a total investment of US$0.2 billion, commenced construction in the 2025 financial year and is expected to be completed in FY28, unlocking up to 2.5 million tonnes per annum of additional vertical capacity.
Companies & ownership
  • BHP Group
    ASX:BHP
Four Mile Uranium Mine

South Australia, Australia · Solution

Operating
Uranium
Overview
Heathgate Resources operates this mine on behalf of its sister company, Quasar Resources Pty Ltd, which is the owner of the Four Mile project. The uranium ore from the Four Mile mine is processed at the Beverley processing plant. The Four Mile deposit consists of two main zones: Four Mile East and Four Mile West.
Processing
The uranium ore from the Four Mile mine is processed at the Beverley processing plant.
Companies & ownership
  • Heathgate Resources Pty Ltd
Beverley North Uranium Mine

South Australia, Australia · Solution

Care And Maintenance
Uranium
Opened
2011-01-01
Overview
The Beverley North Uranium Mine is an in-situ recovery (ISR) uranium mine in South Australia, approximately 550 km north of Adelaide. Owned and operated by Heathgate Resources Pty Ltd, a subsidiary of General Atomics, it commenced production in 2011. Currently on care and maintenance due to market conditions, its infrastructure supports processing for the nearby Four Mile Uranium Mine.
Production
Due to the "care and maintenance" status, there has been no recent production from the Beverley North mine itself. Heathgate Resources files consolidated annual compliance reports for the Beverley, Beverley North, and Four Mile mines, which does not provide separate production figures for each mine.
Processing
The Beverley North mine was designed to have its ore processed through the main Beverley facility. The in-situ recovery process involves pumping a solution containing oxygen and a weak acid through the orebody to dissolve the uranium minerals. The uranium-rich solution is then pumped to the surface and loaded onto resin at a satellite plant before being transported for final processing.
Companies & ownership
  • Heathgate Resources Pty Ltd
Beverley Uranium Mine

South Australia, Australia · Solution

Care And Maintenance
Uranium
Commodities, grades and output
YearCommodityAv. GradeOutput
2020Uranium-0 t
2019Uranium-0 t
2018Uranium-0 t
2017Uranium-20 t
2016Uranium-100 t
2015Uranium-0 t
Opened
2000-01-01
Workforce
more than 300 skilled fly-in fly-out staff onsite at Beverley
Overview
The Beverley Uranium Mine, located in South Australia, is Australia's first operating in-situ recovery (ISR) mine. It commenced production in late 2000. Currently, the Beverley mine is on care and maintenance, with its processing plant being used to process uranium from the nearby Four Mile mine, which is also operated by Heathgate. The mine's infrastructure includes a processing plant, two satellite plants, a power plant, an airstrip, and camp accommodation for 180 people. Heathgate Resources has invested over $2 billion in mine infrastructure and plant across its operations. The company holds permits for ISR uranium in the Frome Basin and actively explores for more deposits, which offer the potential to extend operations at Beverley.
Production
Production overview - 2020: uranium 0 t; 2019: uranium 0 t.
Processing
The Beverley processing plant is now solely used to process ore from the Four Mile Uranium Mine. Ore is processed into uranium oxide concentrate (UOC), commonly termed yellowcake, and exported in powder form. The process involves extracting uranium from the mining solution using ion-exchange.
Companies & ownership
  • Heathgate Resources Pty Ltd
Napperby Uranium Project

Northern Territory, Australia · Open Pit

Under Development
Uranium
Commodities, grades and output
YearCommodityAv. GradeOutput
2018Uranium382 ppm3642.7000000000003 t
Overview
The project is at an advanced exploration stage with approvals underway for resource extension drilling.
Production
Production overview - 2018: uranium 3642.7000000000003 t.
Processing
Elevate Uranium has conducted tests on ore samples from Napperby which have confirmed the potential application of its proprietary U-pgrade™ beneficiation process. This process is designed to produce a low-mass, high-grade concentrate.
Expansion
The current mineral resource covers approximately 6km of a prospective 20km palaeochannel system, indicating significant potential for resource extension. Elevate Uranium plans to undertake further drilling to explore this potential.
Companies & ownership
  • Core Lithium
    ASX:CXO · OTC:CXOXF
  • Elevate Uranium Ltd
    ASX:EL8
Coronel Oviedo Project

Caaguazú, Paraguay · Solution

Under Development
Uranium
Commodities, grades and output
YearCommodityAv. GradeOutput
2012Uranium0.062 %-
Overview
The Coronel Oviedo Project is an exploration-stage uranium project in central Paraguay, covering over 223,000 acres. It has a geological setting similar to the South Texas uranium belt. UEC conducted drilling in 2012 and has an Exploration Target of 23-56 million pounds grading 0.040%-0.052% U3O8. As of early 2025, UEC is appealing the Paraguayan Ministry of Public Works and Communications' (MOPC) position regarding the extension of concessions.
Processing
Preliminary studies and aquifer tests indicate the project is amenable to in-situ recovery (ISR) methods. The aquifer properties are reported to be within the range of values for other uranium ISR projects in Wyoming, Texas, and Nebraska.
Equipment
UEC owns equipment for radon gas and surface gamma surveys.
Companies & ownership
  • Uranium Energy Corp
    NYSE:UEC
Triangulation Mine

Colorado, United States · Underground

Under Development
Uranium
Overview
The Triangulation Mine, consisting of 12 claims covering 247.92 acres in Colorado, was previously listed as an asset by Uranium Energy Corp. Recent company disclosures have not prominently featured updates on these Colorado holdings.
Companies & ownership
  • Uranium Energy Corp
    NYSE:UEC
Coronel Oviedo Property

Caaguazú, Paraguay · Open Pit

Under Development
Uranium
Companies & ownership
  • Uranium Energy Corp
    NYSE:UEC
Yuty project

Caazapá, Paraguay · Solution

Under Development
Uranium
Commodities, grades and output
YearCommodityAv. GradeOutput
2022Uranium0.04 %2203000 lbs
Overview
The Yuty project is located in southeastern Paraguay. It is in the exploitation phase, having advanced to this stage in 2015. The planned mining method is In-Situ Recovery (ISR), a low-cost and environmentally friendly method. The geology is characterised by roll front mineralisation, similar to Uranium Energy Corp's projects in South Texas and Wyoming. The project holds long-term value, though near-term priorities are on US-based production platforms.
Production
Production overview - 2022: uranium 2203000 lbs.
Companies & ownership
  • Uranium Energy Corp
    NYSE:UEC
Millennium

Saskatchewan, Canada · Underground

Under Development
Uranium
Commodities, grades and output
YearCommodityAv. GradeOutput
2023Uranium2.39 %75.9 Mlbs
Mine life
10 years
Workforce
estimated to employ about 150 people
Overview
The proposed mine is in the Athabasca Basin of northern Saskatchewan, approximately 35 km north of Cameco's Key Lake operation. The project is at a development stage, but its progression is currently on hold.
Production
Production overview - 2023: uranium 75.9 Mlbs.
Processing
The project is planned as a mine-only development, with no on-site milling facilities. Ore would be transported to a licensed mill for processing.
Expansion
The project is at a development stage, but its progression is currently on hold. In May 2014, Cameco announced it would not proceed with the licensing process at that time due to economic conditions, and the environmental assessment and licensing process remains paused. No work is planned for the Millennium project in 2026.
Companies & ownership
  • Uranium Energy Corp
    NYSE:UEC
Kiggavik

Nunavut, Canada · Open Pit

Care And Maintenance
Uranium
Mine life
17 years
Overview
The Kiggavik project is a uranium project located in the Kivalliq region of Nunavut, Canada, approximately 80 kilometres west of Baker Lake. It is currently in a care and maintenance phase. In 2015, the Nunavut Impact Review Board (NIRB) recommended against the project due to an indefinite start date, a decision upheld by the federal Minister in 2016. The project was proposed as a combination of open pit and underground mining operations at two main sites: Kiggavik and Sissons, including a mill to process ore into yellowcake.
Production
7.8 million pounds of uranium per year
Processing
mill to process the ore into yellowcake
Companies & ownership
  • Uranium Energy Corp
    NYSE:UEC
Horseshoe-Raven Project

Saskatchewan, Canada · Open Pit

Under Development
Uranium
Commodities, grades and output
YearCommodityAv. GradeOutput
2022Uranium0.117 %6259.575 t
Overview
The Horseshoe-Raven Project is an advanced exploration stage project owned 100% by Uranium Energy Corp, located in the eastern Athabasca Basin in Saskatchewan, approximately 5 km from Cameco's Rabbit Lake mill. The project has outlined resources and is undergoing resource expansion. It has direct access to all-weather roads and power infrastructure. The uranium mineralisation at the Horseshoe and Raven deposits is hosted in basement rocks with no sandstone cover and is found at depths between 100 m and 450 m below the surface. This suggests the deposits are potentially amenable to development without the need for costly ground freezing.
Production
Production overview - 2022: uranium 6259.575 t.
Processing
A 2016 scoping study indicated that heap leaching is a potential extraction method.
Expansion
undergoing resource expansion
Companies & ownership
  • Uranium Energy Corp
    NYSE:UEC
Shea Creek

Saskatchewan, Canada · Underground

Under Development
Uranium
Companies & ownership
  • Uranium Energy Corp
    NYSE:UEC
Christie Lake Project

Saskatchewan, Canada · Underground

Under Development
Uranium
Commodities, grades and output
YearCommodityAv. GradeOutput
2021Uranium1.57 %20350000 lbs
Overview
The Christie Lake Project is a high-grade, resource-stage uranium project located in the eastern Athabasca Basin of northern Saskatchewan, Canada. It is situated approximately 9 kilometres northeast of Cameco's McArthur River Mine and is considered to be at the exploration and resource-definition stage. The most recent mineral resource estimate for the project has an effective date of 31 December 2021, identifying an inferred mineral resource of 20.35 million pounds of U3O8.
Production
Production overview - 2021: uranium 20350000 lbs.
Expansion
In October 2022, Uranium Energy Corp announced a new discovery of high-grade uranium in an area named the Sakura Zone. Subsequent drilling programs in 2023 continued to expand the footprint of this high-grade mineralisation, with a new resource report planned.
Companies & ownership
  • Uranium Energy Corp
    NYSE:UEC
Roughrider

Saskatchewan, Canada · Underground

Under Development
Uranium
Companies & ownership
  • Uranium Energy Corp
    NYSE:UEC
Crain project

Utah, United States · Open Pit

Under Development
Uranium
Companies & ownership
  • Uranium Energy Corp
    NYSE:UEC
Triangulation properties

Colorado, United States · Open Pit

Under Development
Uranium
Companies & ownership
  • Uranium Energy Corp
    NYSE:UEC
Page 1 of 8 (190 total)