Nelligan Mining Complex

Québec, Canada · Open Pit

Under Development
Gold
Overview
The Nelligan project is a large-scale, open-pit gold exploration project located in the Nord-du-Québec region of Québec, Canada. It is situated approximately 60 kilometres southwest of Chibougamau and 45 kilometres south of Chapais. The project is fully owned and operated by IAMGOLD Corporation. The company has consolidated its land position in the Chibougamau district, combining the Nelligan project with the nearby Monster Lake, Philibert, Chevrier, and Croteau projects to form the Nelligan Mining Complex.
Processing
Preliminary metallurgical test work suggests a processing flowsheet incorporating flotation with regrinding could improve gold recovery compared to direct cyanidation of the whole ore. One study indicated a sulphide flotation circuit followed by cyanidation and carbon-in-leach could yield a gold recovery of about 92%. An optimal flow sheet has not yet been selected.

Companies & Ownership (1)

Westwood Gold Mine (including the Grand Duc open pit)

Quebec, Canada · Underground

Operating
Gold

Companies & Ownership (1)

Essakane Mine

Burkina Faso · Open Pit

Operating
Gold

Companies & Ownership (1)

Sumbawa Gold Mine

West Nusa Tenggara, Indonesia · Open Pit

Under Development
Gold

Companies & Ownership (1)

Doup Block Gold Mine

North Sulawesi, Indonesia · Open Pit

Under Development
Gold
Opened
2028-01-01
Overview
The Doup Block is a gold project located in the province of North Sulawesi, Indonesia. The project is owned and operated by PT Arafura Surya Alam (ASA), a subsidiary of PT United Tractors Tbk.
Production
projected annual production of 140,000 to 155,000 ounces of gold
Processing
processing plant
Expansion
plans to build or redesign the project's infrastructure, including the construction of a processing plant

Companies & Ownership (1)

Martabe Gold Mine

North Sumatra, Indonesia · Open Pit

Operating
GoldSilver
End year
2035
Workforce
Over 3,000 employees and contractors; over 99% Indonesian nationals, with more than 70% recruited from local residents.
Overview
The Martabe Gold Mine, an open-pit gold and silver mine in North Sumatra, Indonesia, is operated by PT Agincourt Resources, in which PT United Tractors Tbk holds a 95% interest. It commenced production in 2012.
Production
Annual processing capacity of over 7 million tonnes of ore. Production in 2022 was 260,658 ounces of gold. Estimated production for 2024 is 192,264 ounces of gold.
Processing
Conventional carbon-in-leach (CIL) processing method. Comminution circuit includes a Metso C200 jaw crusher, a SAG mill, and a Vertimill for secondary milling.
Equipment
Metso C200 jaw crusher, a SAG mill, a Vertimill for secondary milling, ReCyn facility, filtration plant with two Diemme GHT-2500 F26 vertical recessed pressure plate filters
Expansion
In 2021, a ReCyn facility was operational to enhance recovery from the gold ore processing.

Companies & Ownership (1)

Pontois Project

Quebec, Canada · Open Pit

Under Development
LithiumGoldCopperZincLeadSilver
Overview
The Pontois Project is a mineral exploration property located in the James Bay Region of Quebec, Canada. It consists of 31 contiguous claims covering an area of 1,587.2 hectares. The project is situated approximately 10.5 kilometres directly west of the company's main Corvette Property and is considered to be on the geological trend to the west of it. Patriot Battery Metals acquired a 100% interest in the Pontois West Property in September 2022. The project is considered a non-core exploration asset by the company. The property is prospective for lithium pegmatite, as well as orogenic gold and volcanogenic massive sulphides.

Companies & Ownership (1)

Del Toro Silver Mine

Zacatecas, Mexico · Underground

Care And Maintenance
SilverGoldLeadZinc
Workforce
approximately 195 contract miners, 75 hourly company personnel, and 28 company staff personnel when at full production in 2014
Overview
The Del Toro Silver Mine is an underground mine in Chalchihuites, Zacatecas, Mexico, historically producing silver, gold, lead, and zinc. It comprises three main underground mining areas: San Juan, Dolores, and Perseverancia.
Production
Between 2015 and 2018, averaged 2.54 million silver-equivalent ounces annually, consisting of approximately 1.42 million ounces of silver, 345.5 ounces of gold, and 19.95 million pounds of lead per year.
Processing
flotation circuit, cyanidation circuit, allowing for the production of silver doré bars
Equipment
2,000 tonnes per day flotation circuit, planned 4,000 tonnes per day dual-circuit processing mill
Expansion
A cyanidation circuit was commissioned in the fourth quarter of 2013. A 2016 technical report mentions a planned 4,000 tonnes per day dual-circuit processing mill.

Companies & Ownership (1)

Lac du Beryl Project

Quebec, Canada · Open Pit

Under Development
LithiumGold
Overview
Exploration-stage asset prospective for lithium and gold, consisting of 18 claims. Preliminary surface prospecting confirmed pegmatite presence.

Companies & Ownership (1)

Pontax Property

Quebec, Canada · Open Pit

Under Development
LithiumGold
Overview
Mineral exploration asset located near Eastmain, Quebec, Canada. 100% owned by Patriot Battery Metals, targeting lithium and gold. Consists of 80 non-contiguous claims totalling 4,257.2 hectares. At exploration stage, not yet determined if it contains economically recoverable ore reserves.

Companies & Ownership (1)

Toquepala

Tacna Department, Peru · Open Pit

Operating
CopperMolybdenumSilverRhodiumGoldZinc
Opened
1960-01-01
Workforce
estimated to have a peak of 949 employees
Overview
The Toquepala mine is a large, open-pit porphyry copper mine located in the Tacna Province of the Tacna Department in southern Peru. The open pit is substantial, measuring 2.5 kilometres across and over 700 metres deep.
Production
In 2009, produced approximately 127,000 tonnes of copper in sulphide concentrates and 38,000 tonnes of copper cathodes. Total processing capacity is over 100,000 tonnes of ore per day.
Processing
Two concentrators and a solvent extraction/electrowinning (SX/EW) facility. Processing involves crushing and grinding, followed by flotation for concentrates. The SX/EW plant processes low-grade ore.
Equipment
conventional truck and shovel method, significant number of haul trucks and loaders, Cat 798 AC electric drive trucks
Expansion
A second concentrator was commissioned in 2018, increasing total processing capacity. An expansion in the early 2000s extended the life of the mine.

Companies & Ownership (1)

Michiquillay

Cajamarca region, Peru · Open Pit

Under Development
CopperMolybdenumGoldSilver
Opened
2032-01-01
End year
2057
Mine life
25 years
Workforce
Expected to generate significant employment for local communities; currently sources unskilled labour from Michiquillay and La Encañada for exploration work.
Overview
Michiquillay is a world-class mining project located in the Cajamarca region of Peru, fully owned and operated by Southern Copper Corporation. It is an open-pit mine, currently under development, with primary commodities of copper, molybdenum, gold, and silver.
Production
Anticipated annual production of 225,000 tonnes of copper. Inferred mineral resources are estimated at 2,288 million tonnes with a copper grade of 0.43%.
Processing
conventional copper-moly concentrator

Companies & Ownership (1)

Taxco

Guerrero, Mexico · Underground

Care And Maintenance
LeadZincGoldSilver
Overview
The Taxco complex is comprised of several underground mines, including San Antonio, Guerrero, and Remedios, and a flotation plant. The primary commodities are lead and zinc, with some gold and silver content in the ore. The mine has been on strike since July 2007, with operations suspended until the labour issues are resolved.
Processing
flotation plant

Companies & Ownership (1)

Sierra de Lobos

Guanajuato, Mexico · Underground

Under Development
CopperSilverGold
La Caridad

Sonora, Mexico · Open Pit

Operating
CopperMolybdenumGoldSilver
Opened
1979-01-01
Workforce
2022: 1,163 direct personnel, 861 contractors. 2000: ~3,000 workers.
Overview
Integrated mining-metallurgical operation, porphyry copper type deposit, located in Nacozari de García Municipality, Sonora, Mexico.
Production
Daily ore processing capacity of 94,500 metric tons. Smelter capacity of 1,000,000 tonnes/year concentrate feed. 2020 production: 110,000 tonnes contained copper (concentrate), 26,000 tonnes copper cathodes (SX-EW).
Processing
Conventional truck and shovel mining, crushing, grinding, froth flotation, smelting, refining, solvent extraction and electrowinning (SX-EW)
Equipment
Nordberg MP800 cone crushers, copper-molybdenum concentrator, smelter, copper refinery, precious metals refinery, rod plant, SX-EW plant, lime plant, sulfuric acid plants
Expansion
Metso contracted to supply Nordberg MP800 cone crushers to increase processing capacity in 2025

Companies & Ownership (1)

Springpole Project

Ontario, Canada · Open Pit

Under Development
GoldSilver
Mine life
9.4 years
Workforce
3,340 direct and indirect jobs annually during the construction phase and 5,910 jobs annually during the operational phase. The on-site infrastructure includes a 72-man camp.
Overview
The Springpole Project is an undeveloped gold and silver project located in Ontario, Canada. It is owned and operated by First Mining Gold Corp. First Majestic Silver Corp. has a silver streaming agreement on the project, entitling it to 50% of the payable silver produced over the life of the mine.
Production
proposed operation is designed to process 30,000 tonnes of ore per day.
Processing
The processing plant is planned to include crushing, grinding, and flotation, with separate leaching circuits for the flotation concentrate and tailings, followed by a carbon-in-pulp recovery process to produce doré bars.
Equipment
The primary mining fleet is expected to consist of up to four 251mm rotary drills, two 140mm drills, two 37m³ electric hydraulic shovels, and three 23m³ front-end loaders. The ancillary fleet will include dozers, graders, and other support units.

Companies & Ownership (1)

El Arco

Baja California Sur, Mexico · Open Pit

Under Development
CopperGoldMolybdenumSilver
Mine life
35 years
Workforce
47 people (technical manpower)
Overview
El Arco is a development project located in the central part of the Baja California peninsula, Mexico. The El Arco deposit is a world-class copper deposit with sulphide ore reserves of over 1,230 million tonnes with an average ore grade of 0.40% and 141 million tonnes of leach material with an average ore grade of 0.27%.
Production
Annual production is expected to be 190,000 tonnes of copper and 105,000 ounces of gold.
Processing
combined concentrator and solvent extraction-electrowinning (SX-EW) operations. The concentrator is expected to have a capacity of 120,000 tonnes per day, with the SX-EW operations producing 28,000 tonnes per year.

Companies & Ownership (1)

La Luz

San Luís Potosí, Mexico · Underground

Under Development
SilverGold

Companies & Ownership (1)

Charcas

San Luis Potosí, Mexico · Underground

Operating
ZincLeadCopperSilverGold
Workforce
1,000 workers
Overview
The Charcas mining district is one of Mexico's oldest, with mining activity dating back to 1584. The operation is an active underground mine complex comprising three individual mines: San Bartolo, Rey-Reina, and La Aurora. The Charcas mine is considered Mexico's largest producer of zinc.
Processing
crushing, flotation plant
Equipment
elevators (malacates/winches), automated capsule-like device (La Bala)

Companies & Ownership (1)

San Martin Mine

Jalisco, Mexico · Underground

Care And Maintenance
SilverGold
Opened
1983-01-01
End year
2022
Mine life
9.5 years
Workforce
441 people (352 company employees and 137 contractors) as of December 31, 2012
Overview
The San Martin mine is located in the San Martin de Bolaños mining district in the state of Jalisco, Mexico, approximately 250 kilometres north of Guadalajara. It is 100% owned by the Canadian mining company First Majestic Silver Corp., which acquired the mine in 2006. The primary commodities are silver and gold.
Production
mill's capacity expanded from 950 to 1,300 tonnes per day; capable of producing up to 2 million ounces of silver annually; in 2018, processed 284,656 tonnes of ore, producing 1,746,139 ounces of silver and 5,226 ounces of gold
Processing
conventional cyanidation and Merrill-Crowe dore production system, three-stage crushing with jaw crushers, grinding in ball mills and a tower mill, cyanide leaching in a counter-current decantation circuit
Equipment
jackleg drills, scoop trams, Komatsu WA 320 front-end loader, 22-tonne dump trucks, jaw crushers, ball mills, tower mill, new leaching tanks, thickeners, two induction furnaces, two new filter presses
Expansion
mill's capacity was expanded from 950 to 1,300 tonnes per day in October 2013

Companies & Ownership (1)

Jerritt Canyon

Nevada, United States · Underground

Care And Maintenance
GoldSilver
Opened
1981-01-01
Workforce
Prior to the suspension, in 2022, the mine had 300 company employees and 300 contract employees. During the suspension, a management staff of 64 remains at the site.
Overview
Jerritt Canyon is an underground gold mine owned and operated by First Majestic Silver Corp. through its wholly-owned subsidiary, Jerritt Canyon Gold LLC. The mine is located in Elko County, Nevada, in the United States. The property is situated approximately 45 miles north of the town of Elko and comprises 30,821 hectares of mining claims.
Production
In 2022, the mine produced 72,411 ounces of gold and 1,617 ounces of silver. Since its acquisition by First Majestic on April 30, 2021, the mine has produced 68,567 ounces of gold. Over its more than 40-year history, Jerritt Canyon has produced approximately 9.8 million ounces of gold.
Processing
drying and roasting the ore, followed by a conventional carbon-in-leach (CIL) circuit for gold recovery. The processing plant has a capacity of 4,500 tonnes per day.
Equipment
low profile 35 and 40-ton tractors and 150-ton haul trucks
Expansion
exploration to grow the mine's resources for an eventual restart of operations

Companies & Ownership (1)

Los Gatos Silver Mine

Chihuahua, Mexico · Underground

Operating
SilverZincLeadGoldCopper
End year
2032
Workforce
approximately 540 employees, with over 99% hailing from Mexico.
Production
current operating throughput target of approximately 3,500 tonnes per day. For the full year 2024, on a 100% basis, the mine's production was projected to be 15.6 million silver equivalent ounces, which includes 9.7 million ounces of silver, 69.7 million pounds of zinc, 46.4 million pounds of lead, and 5,530 ounces of gold.
Processing
conventional design with flotation technology to produce lead and zinc concentrates. The processing flowsheet includes a crushing and grinding circuit equipped with a jaw crusher, a semi-autogenous grinding (SAG) mill, and a ball mill. This is followed by lead and zinc flotation circuits, concentrate thickening, and tailings thickening.
Equipment
six jumbo drills, seven bolters, one cable bolter, three longhole production drill rigs, nine loaders, and seven 40-tonne underground mine trucks. The total mobile equipment fleet comprises 97 pieces, including ancillary vehicles for mine services and personnel.

Companies & Ownership (1)

Angangueo

Michoacán, Mexico · Underground

Under Development
CopperZincLeadSilverGold
Overview
Polymetallic mining project in Angangueo, Michoacán, Mexico, operated by Southern Copper Corporation's parent company, Grupo México. The project is currently not in operation and is considered a future or potential project pending government approvals. Located within the buffer zone of the Monarch Butterfly Biosphere Reserve, a UNESCO World Heritage site, leading to environmental concerns and public opposition, delaying its development. As of early 2024, it lacked necessary authorisation for land use change.
Production
Planned annual production: 10,400 tonnes of copper, 9,700 tonnes of zinc, and 3,900 tonnes of lead (other sources projected 10,400 tonnes of copper and 7,000 tonnes of zinc).

Companies & Ownership (1)

La Encantada Silver Mine

Coahuila, Mexico · Underground

Operating
SilverGold
Workforce
640 people, comprising 290 unionised workers, 110 employees, and 240 contractors.
Overview
The mine is located in northern Mexico in the state of Coahuila, approximately 708 kilometres northeast of Torreon. The property is situated in the municipality of Villa de Ocampo, about 120 kilometres east of the city of Melchor Múzquiz. The site includes 4,076 hectares of mining rights and 1,343 hectares of surface rights.
Production
In 2023, the mine processed 966,392 tonnes of ore, producing 2,718,856 ounces of silver and 321 ounces of gold. In the fourth quarter of 2024, the mine produced 755,963 ounces of silver from 253,953 tonnes of processed ore. The projected production for 2024 is 2.3 million ounces of silver.
Processing
Historically, a 1,000 tonne-per-day flotation plant was the primary method for silver recovery. This was later replaced by a 4,000 tonne-per-day cyanidation mill. The flotation circuit was suspended in June 2010 and is currently under care and maintenance. The cyanidation plant, which commenced operations in April 2010, allows for the production of silver doré bars on-site.
Equipment
electro-hydraulic jumbos, hand-held jacklegs, diesel-powered load-haul-dumps (LHDs), highway-type diesel rear-dump trucks, battery-powered rail haulage trains, three new 20-tonne Torino-style haulage trucks with Mercedes-Benz engines
Expansion
In 2015, the plant was upgraded with a new 12' x 24' ball mill, a tertiary crusher, two vibrating screens, and a series of conveyor belts. A roasting circuit has also been implemented to enhance recoveries from tailings.

Companies & Ownership (1)