← Map view|Directory

Directory

Browse minesites, mining companies and suppliers. Use the tabs below to switch sections.

Minesites Directory

Browse minesites. Each card shows company ownership and their most recent associated articles.

Filter by mine details and commodity attributes.
Page 2 of 17 (392 total)
Harrison County Mine

West Virginia, United States · Underground

Operating
Coal
Commodities, grades and output
YearCommodityAv. GradeOutput
2022Coal-6830143
2021Coal-3058280
2019Coal-6808868
2018Coal-7215143
2017Coal-7131341
Workforce
approximately 400 coal miners
Overview
The Harrison County Mine is an underground operation utilising longwall and continuous mining methods, producing high heat and high quality thermal coal.
Production
Production overview - 2022: coal 6196208 t; 2021: coal 2774414 t.
Processing
The mine complex includes the Harrison County Coal Preparation Plant. This is a wet wash coal preparation plant.
Equipment
The mine operates one longwall section and three continuous miner sections.
Expansion
In July 2022, Harrison County Coal Resources, Inc. filed a petition to permit an alternative method of compliance with respect to surface directional drilled wells for coal bed methane. Projections at that time indicated a well would be intersected by the 7W longwall in May 2025 and the 8W longwall in April 2026.
Companies & ownership
  • American Consolidated Natural Resources
Warrior

Kentucky, United States · Underground

Operating
Coal
Opened
1984-05-02
Workforce
35
Production
Annual production is projected at 4.5 million tons in 2025.
Processing
The Warrior preparation plant has a throughput capacity of 1,200 tons of raw coal per hour.
Equipment
The mine utilises continuous mining units.
Expansion
A new portal location, completed in the second quarter of 2025, allows for convenient access to up to 100 million tons of additional reserves.
Companies & ownership
  • Alliance Resource Partners, L.P.
    NYSE:ARLP
Gibson South Mine

Indiana, United States · Underground

Operating
Coal
Commodities, grades and output
YearCommodityAv. GradeOutput
2024Coal-5698564 t
2023Coal-5.3 Mt
2022Coal-5.3 Mt
2021Coal-3800000 t
2020Coal-2384771.68 t
End year
2031
Mine life
10 years
Workforce
250 (as of 2021)
Production
Production overview - 2024: coal 5698564 t; 2023: coal 5.3 Mt.
Processing
The mine has a preparation plant with a throughput capacity of 1,800 tons of raw coal per hour.
Equipment
The mine utilises continuous mining units employing room-and-pillar mining techniques.
Companies & ownership
  • Alliance Resource Partners, L.P.
    NYSE:ARLP
Hamilton County Coal

Illinois, United States · Underground

Operating
Coal
Commodities, grades and output
YearCommodityAv. GradeOutput
2024Coal-4.8 Mt
Opened
2013-01-01
Workforce
359 (335 underground and 24 on the surface) as of February 2025
Production
Production overview - 2024: coal 4.8 Mt.
Processing
The preparation plant has a throughput capacity of 2,000 tons of raw coal per hour.
Equipment
The mine utilises longwall mining techniques. Equipment includes a Joy Shear, continuous miner units, and Auxier shuttle cars that transport coal to conveyor belts.
Companies & ownership
  • Alliance Resource Partners, L.P.
    NYSE:ARLP
River View

Kentucky, United States · Underground

Operating
Coal
Commodities, grades and output
YearCommodityAv. GradeOutput
2024Coal-9 Mt
2018Coal-9.75 Mt
Opened
2009-01-01
End year
2056
Capex (est.)
USD 35.00M
Workforce
783 people (September 2022)
Overview
The River View mining complex comprises two mines: River View (Mine #1) and the new Henderson County (Mine #2). River View is the largest underground room-and-pillar mine of its kind in North America, producing medium/high-sulfur coal from the WKY9 and WKY11 seams.
Production
Production overview - 2024: coal 9 Mt; 2018: coal 9.75 Mt.
Processing
The mine's preparation plant has a throughput capacity of 2,700 tons of raw coal per hour. Raw coal is transported via a belt system from the underground mine to the surface for processing and loading.
Equipment
The mine utilises continuous mining units. The River View Mine has 7 super continuous miner units, and the Henderson County Mine has an additional 2 units.
Expansion
In September 2022, an expansion of the River View mine into Henderson County was announced, with a $35 million investment to construct a new 30,000-square-foot facility. This expansion, known as the Henderson County Mine (or River View Mine #2), is expected to create 260 new jobs. Construction was planned to begin in April 2023 and be completed by December 2024.
Companies & ownership
  • Alliance Resource Partners, L.P.
    NYSE:ARLP
Mettiki - Mountain View Mine

West Virginia, United States · Underground

Closed
Coal
Commodities, grades and output
YearCommodityAv. GradeOutput
2025Coal-1.2 Mt
End year
2026
Workforce
199 (as of January 2026)
Overview
Production ceased in January 2026, with the mine set for permanent closure and layoffs to take effect from 1 April 2026. The closure was prompted by a key customer's inability to commit to purchasing the minimum one million tons per year required for the mine to remain viable. On 29 January 2026, Alliance Resource Partners, L.P. announced it had issued Worker Adjustment and Retraining Notification (WARN) Act notices to all 199-200 employees at the Mountain View Mine.
Production
Production overview - 2025: coal 1.2 Mt.
Processing
The Mettiki complex includes a preparation plant with a throughput capacity of 1,350 tons of raw coal per hour. The Mountain View mine produces low/medium-sulfur coal.
Equipment
longwall mining equipment, continuous miners
Companies & ownership
  • Alliance Resource Partners, L.P.
    NYSE:ARLP
MC Mining Complex

Kentucky, United States · Underground

Closed
Coal
Commodities, grades and output
YearCommodityAv. GradeOutput
2024Coal-0.8 Mt
End year
2024
Workforce
Approximately 280 employees
Production
Production overview - 2024: coal 0.8 Mt.
Processing
preparation plant with a throughput capacity of 1,000 tons of raw coal per hour. The underground mine utilises continuous mining units employing room-and-pillar techniques to produce low-sulfur coal.
Companies & ownership
  • Alliance Resource Partners, L.P.
    NYSE:ARLP
Tunnel Ridge Mine

West Virginia, United States · Underground

Operating
Coal
Commodities, grades and output
YearCommodityAv. GradeOutput
2025Coal-5.2 Mt
2023Coal-7.7 Mt
Opened
2012-01-01
Mine life
10 years
Workforce
880 (average)
Production
Production overview - 2025: coal 5.2 Mt; 2023: coal 7.7 Mt.
Processing
The preparation plant has a throughput capacity of 2,000 tons of raw coal per hour. Coal produced is transported by a conveyor belt to a barge loading facility on the Ohio River.
Equipment
The mine utilises the longwall mining technique.
Expansion
In 2018, a permit was acquired to expand the underground mining area.
Companies & ownership
  • Alliance Resource Partners, L.P.
    NYSE:ARLP
Mt Arthur Coal

New South Wales, Australia · Open Pit

Operating
Coal
Companies & ownership
  • BHP Group
    ASX:BHP
Saraji

Queensland, Australia · Open Pit

Operating
Coal
Companies & ownership
  • BHP Group
    ASX:BHP
Peak Downs

Queensland, Australia · Open Pit

Operating
Coal
Commodities, grades and output
YearCommodityAv. GradeOutput
2024Coal-2.979 Mt
2023Coal-10.96 Mt
Opened
1972-01-01
Mine life
93 years
Capex (est.)
USD 2.00B
Workforce
2,400 personnel
Production
Production overview - 2024: coal 2.979 Mt; 2023: coal 10.96 Mt.
Processing
The operation includes a coal handling and preparation plant.
Equipment
The mine is operated using dragline and truck/shovel fleets. Equipment includes Caterpillar 797f rear dump trucks. Contractors at the site have utilised equipment from Liebherr and Caterpillar.
Expansion
A "Peak Downs Mine Continuation project" is proposed to extend the mine's life by approximately 93 years through an expansion of the open-cut footprint. This project is currently in an active Environmental Impact Statement (EIS) phase with the Queensland Government. The proposed expansion aims to produce up to 18 million tonnes of product coal annually, with a stated investment of $2 billion. The project is expected to maintain the current workforce of 2,400 and create an additional 160 jobs during the construction phase. The Coordinator-General has set a lapse date for the project's declaration of 30 June 2026 for the EIS process.
Companies & ownership
  • BHP Group
    ASX:BHP
  • Mitsubishi Development
Broadmeadow

Queensland, Australia · Underground

Operating
Coal
Commodities, grades and output
YearCommodityAv. GradeOutput
2023Coal-6380000 t
Opened
2005-01-01
End year
2096
Mine life
70 years
Production
Specific production figures for the Broadmeadow mine are not publicly reported by BHP; they are aggregated into the total for BHP Mitsubishi Alliance (BMA) operations. For the financial year ended 30 June 2025, BMA's steelmaking coal production, excluding divested assets, saw a 5% increase. This was partly due to improved truck productivity which helped to offset the impacts of heavy wet weather and geotechnical challenges at the Broadmeadow mine. In an operational review for the nine months ended 31 March 2025, BHP stated that it was operating at slower mining rates at Broadmeadow to safely manage the geotechnical characteristics of the current longwall panel, and that this was expected to continue into the first quarter of the 2026 financial year. Due to these challenges and significant wet weather, production for BMA in FY2025 is no longer guided towards the upper half of its 33 to 38 million tonne range.
Processing
Coal from Broadmeadow is processed jointly with coal from the Goonyella Riverside open-cut operation. The coal is washed and blended at the adjacent Goonyella/Riverside open-cut mine to produce a premium coking coal product.
Equipment
The mine utilises a punch longwall mining method, accessing the coal seam from an existing open-cut pit highwall. In 2013, the mine transitioned to the top coal caving (TCC) method of extraction. The longwall is supplied by CAT and consists of 158 2-metre-wide shields. The main shields are two-leg with a 1460-tonne capacity, while gate end shields are three-leg with a 1580-tonne capacity, and the two shields covering the maingate drives are four-leg supports with an 1800-tonne capacity.
Expansion
The existing data regarding the extension of three longwall panels (14, 15, and 16) into the Red Hill mining lease remains the most current available information.
Companies & ownership
  • BHP Group
    ASX:BHP
  • Mitsubishi Development
Goonyella Riverside

Queensland, Australia · Open Pit

Operating
Coal
Commodities, grades and output
YearCommodityAv. GradeOutput
2019Coal-17100000 t
Opened
1989-01-01
Autonomous haulage
Yes
Workforce
2,087
Overview
The Goonyella Riverside mine is located in the Bowen Basin, approximately 30 kilometres north of Moranbah. It is part of the BHP Mitsubishi Alliance (BMA), a 50:50 joint venture between BHP and Mitsubishi Development.
Production
Production overview - 2019: coal 17100000 t.
Processing
The mine has two coal processing plants where mined coal is sorted, washed, and blended. Run-of-mine coal is crushed to less than 50 mm, followed by beneficiation processes.
Equipment
conventional open-cut mining fleet, autonomous haulage system with up to 86 Komatsu trucks
Companies & ownership
  • BHP Group
    ASX:BHP
Byerwen Coal Mine

Queensland, Australia · Open Pit

Operating
Coal
Commodities, grades and output
YearCommodityAv. GradeOutput
2025Coal-10000000 t
End year
2067
Mine life
50 years
Workforce
545
Production
Production overview - 2025: coal 10000000 t.
Processing
The mine has two coal handling and preparation plants. The processing facilities produce both metallurgical quality coal and thermal coal products.
Expansion
A contract extension for Macmahon Holdings is set to significantly increase production from five to 10 million tonnes of hard coking coal per annum.
Companies & ownership
  • Macmahon Holdings Limited
    ASX:MAH
Bowen Basin (Goonyella Riverside)

Queensland, Australia · Open Pit

Operating
Coal
Companies & ownership
  • Perenti Limited
    ASX:PRN
Poplar River Mine

Saskatchewan, Canada · Strip

Operating
Coal
Opened
1979-01-01
End year
2029
Mine life
50 years
Workforce
Approximately 140 people.
Production
coal: 2744285 t
Processing
The processing involves crushing the coal to a 6-inch minus size before it is loaded into a silo. The coal is then transported from a loadout facility to the power station via a privately owned railway.
Equipment
The mine utilises two Bucyrus Erie 2570-W draglines for removing overburden. The exposed coal is then handled by 993 loaders and Triple 7 coal haulers. The equipment fleet also includes four Cat D10T and one Cat D9T dozers for spoil levelling, dragline pad preparation, road construction, drainage ditches, cleaning coal, and ripping overburden.
Expansion
In January 2025, the Government of Saskatchewan announced it was considering extending the life of the Poplar River Generating Station, which would in turn extend the life of the mine.
Companies & ownership
  • Westmoreland Mining LLC
Paintearth Mine

Alberta, Canada · Open Pit

Closed
Coal
Opened
1954-01-01
End year
2021
Mine life
67 years
Overview
Active coal mining ceased in 2021, and the mine has moved into reclamation mode. Prairie Mines & Royalty ULC (PMRU) has submitted applications for the closure, decommissioning, and reclamation of the mine. Reclamation is anticipated to be finished by 2026.
Production
coal: 1.1 Mt
Expansion
A 59-megawatt solar farm and a 34-megawatt battery energy storage system, known as the Mannix Mine Solar & Battery Energy Storage System Project, has been proposed for the reclaimed mine site. The Alberta Utilities Commission approved the applications to construct and operate the project in April 2025. Construction is estimated to start in the third quarter of 2025, with commercial operation planned for the third quarter of 2026. The BIOSALIX project, a clean technology demonstration, is using municipal organic waste from Edmonton to replenish soil at the mine site to grow willow that can be used as a biomass feedstock for renewable energy.
Companies & ownership
  • Westmoreland Mining LLC
Genesee Mine

Alberta, Canada · Open Pit

Closed
Coal
Opened
1988-01-01
End year
2023
Overview
Surface coal mining operations at the Genesee Mine concluded in December 2023. The site has now transitioned to focus on reclamation, final decommissioning, and closure activities. A portion of the site will remain active for the extraction of fly ash. The cessation of mining operations coincided with the conversion of the associated Genesee Generating Station to natural gas, which was completed in June 2024. Subbituminous coal production in Alberta effectively ended with the decommissioning of the Genesee mine in June 2024. Reclamation activities are underway, with a final Decommissioning and Land Reclamation Plan to be submitted to the Alberta Energy Regulator. The objectives of the reclamation are to protect the watershed, re-establish agricultural lands, and create wildlife habitat.
Production
coal: 5.5 Mt
Companies & ownership
  • Westmoreland Mining LLC
Estevan Mine

Saskatchewan, Canada · Open Pit

Operating
Coal
Workforce
Approximately 300 United Mine Workers Association members and an additional 100 non-union staff reported in May 2019.
Overview
The Estevan Mine is an operating open-pit coal mine located in Saskatchewan, Canada, owned and operated by Westmoreland Mining LLC. Operations involve strip mining, supplying thermal coal (lignite) to Saskatchewan Power Corporation's Boundary Dam and Shand Generating Stations.
Production
coal: 3131115 t
Processing
coal-handling facilities
Equipment
draglines, trucks, shovels, coal-handling facilities
Expansion
Potential extension to the mine's life due to consideration of refurbishing Boundary Dam Units 4, 5, and 6, and Poplar River Power Station, which may require investment in new equipment and machinery.
Companies & ownership
  • Westmoreland Mining LLC
Coal Valley Mine

Alberta, Canada · Open Pit

Operating
Coal
Opened
1978-01-01
End year
2020
Workforce
The reopening in 2021 was expected to restore 300 direct jobs and up to 750 indirect jobs. An earlier record mentioned 438 employees.
Overview
The Coal Valley Mine is a surface mine located in West Central Alberta, south of the Town of Edson. Mining is conducted using truck and shovel/loader and dragline methods. The mine was placed on care and maintenance in June 2020 due to the COVID-19 pandemic and restarted production in the fourth quarter of 2021.
Production
coal: 2.3 Mt
Processing
The mine includes a coal wash plant to process the run-of-mine coal. The process involves crushing, breaking, and sizing the coal before it undergoes density separation to clean the organic material from refuse. The plant has the capacity to wash 4 million tonnes of clean coal per year.
Equipment
The mine utilises truck/shovel and dragline equipment.
Expansion
Prairie Mines and Royalty applied to extend the Pit 26 site by 68 hectares. This expansion falls within the current Coal Valley Mine boundaries.
Companies & ownership
  • Westmoreland Mining LLC
San Juan Mine

New Mexico, United States · Open Pit

Closed
Coal
Opened
1973-01-01
End year
2022
Workforce
51 employees will be retained for the reclamation process.
Overview
The San Juan Mine ceased active coal production in September 2022 and is now in a state of reclamation. The mine, which began as a surface operation in 1973, later included underground mining.
Production
coal: 1572266 t
Companies & ownership
  • Westmoreland Mining LLC
Rosebud Mine

Montana, United States · Open Pit

Operating
Coal
Opened
1968-01-01
End year
2045
Workforce
Over 300
Production
coal: 5978039 t
Processing
Coal is transported via a conveyor belt system to crushers. High-sulfur "waste coal" is sent by truck to the Rosebud Power Plant for combustion.
Equipment
Mining methods include dragline and truck and shovel/loader. Equipment includes Marion 8050 and Marion 8200 draglines and a 4.2-mile long overland conveyor belt.
Expansion
In August 2025, the U.S. Department of the Interior approved a mining plan modification for the Rosebud Mine, located in Rosebud and Treasure counties. This decision allows for the extraction of approximately 33.75 million tons of federal coal and extends the mine's operation. The expansion covers nearly 1,900 acres of new mining area. The mine has several active permit areas, including Area A, Area B, Area C, and Area F. As of December 2023, 582 acres had been disturbed in the Area F project area, with 8.5 million tons of coal produced from this area. An application for a fifth amendment (AM5) to the operating permit for Area B would increase the permit area by 9,108 acres to a total of 15,153 acres and allow for the extraction of an additional 42.9 million tons of coal.
Companies & ownership
  • Westmoreland Mining LLC
Kemmerer Mine

Wyoming, United States · Open Pit

Operating
Coal
Opened
1960-01-01
End year
2025
Workforce
2025: 215 workers (before March layoffs). 2024: 215 workers. 2023: 230 employees. 2019: 272 employees. 2017: 279 workers.
Overview
The mine is a 13,400-acre surface mine complex. Sub-bituminous coal for electrical generation and industrial uses. The coal is sourced from the Adaville and Frontier formations.
Production
coal: 2.4 Mt
Processing
Coal is supplied to the adjacent Naughton Power Station via a 4,200 ft long overland conveyor. In 2015, the mine upgraded a drive system on an inclined conveyor.
Equipment
4,200 ft long overland conveyor, inclined conveyor
Expansion
A $30 million project to relocate a section of U.S. Highway 30 to access an additional 9 million tons of coal reserves was halted in September 2024. In April 2025, Kemmerer Operations LLC requested a permit modification to expand the capacity of three coal stockpiles.
Companies & ownership
  • Westmoreland Mining LLC
Jewett Mine

Texas, United States · Open Pit

Closed
Coal
Opened
1985-01-01
End year
2016
Workforce
approximately 250 jobs cut upon closure in late 2016 and early 2017
Overview
Mining operations at the Jewett Mine ceased permanently at the end of 2016 due to the adjacent Limestone Electric Generating Station terminating its lignite supply contract. The mine is now in a reclamation-only status, with activities expected to be completed by 2028. NRG is responsible for the reclamation of the 35,000-acre site.
Production
coal: 6.3 Mt
Equipment
large draglines, including three Marion 8200 models and a Marion 8750, supported by a bucketwheel excavator and standard earth-moving equipment such as front-end loaders, hydraulic excavators, haulers, and dozers
Companies & ownership
  • Westmoreland Mining LLC
Page 2 of 17 (392 total)