Minesites Directory

Browse minesites. Each card shows company ownership and their most recent associated articles.

Filter by mine details and commodity attributes.
Page 1 of 17 (392 total)
Mt Arthur Coal

New South Wales, Australia · Open Pit

Operating
Coal
Commodities, grades and output
YearCommodityAv. GradeOutput
2024Coal-15367907 t
2023Coal-14172415 t
Opened
2002-01-01
End year
2030
Workforce
approximately 2,000 people
Overview
Mt Arthur Coal is a large open-cut thermal coal mine situated in the Hunter Valley region of New South Wales, Australia, approximately 5 kilometres south-west of Muswellbrook. Owned and operated by Hunter Valley Energy Coal Pty Ltd, a wholly-owned subsidiary of BHP, it is the largest coal mine in New South Wales. The mine produces thermal coal for international customers in the energy sector. Production at the current Mt Arthur Coal operation commenced in 2002.
Production
Production overview - 2024: coal 15367907 t; 2023: coal 14172415 t.
Processing
The mined coal is transported by truck to the on-site Coal Handling and Preparation Plant (CHPP) with an approved processing capacity of up to 36 Mtpa of ROM coal. The process involves crushing, screening, cleaning, and sorting. After processing, the coal is transported via the Main Northern Railway line to the Port of Newcastle for export.
Equipment
The mining operations utilise a range of large-scale equipment, including trucks, electric shovels, excavators, dozers, graders, drills, and water carts. The fleet includes Liebherr R 9800 (800-tonne) and R 996B excavators, as well as Liebherr T 282C off-highway trucks.
Expansion
BHP plans to cease mining at Mt Arthur Coal by the end of the 2030 financial year, proceeding with a managed closure process. The New South Wales Government granted approval for mining activities to continue until 30 June 2030. Post-closure plans include exploring a pumped hydro energy storage project with ACCIONA Energía and a A$30 million community fund. A A$1.9 billion contract extension with Thiess was secured in 2024 for mining services.
Companies & ownership
  • BHP Group
    ASX:BHP
Caval Ridge Mine

Queensland, Australia · Open Pit

Operating
Coal
Commodities, grades and output
YearCommodityAv. GradeOutput
2024Coal-6.5 Mt
2023Coal-9.36 Mt
Opened
2014-01-01
End year
2056
Autonomous haulage
Yes
Workforce
approximately 1,500
Production
Production overview - 2024: coal 6.5 Mt; 2023: coal 9.36 Mt.
Processing
The mine includes a coal handling and preparation plant (CHPP). The CHPP processes coal from Caval Ridge and also from the adjacent Peak Downs mine, which is transported via an overland conveyor. The plant has a designed processing capacity of 14 to 15 million tonnes per annum (Mtpa) and is capable of producing 8 Mtpa.
Equipment
Mining operations are carried out using a conventional dragline excavator and truck fleet. The mine also utilises Autonomous Haulage Systems (AHS), which were introduced in 2018.
Expansion
The Caval Ridge Mine Horse Pit Extension project has received approval. This extension will sustain the existing workforce and extend the mine's operational life to 2056. The project involves extending one of the two pits to extract approximately 15 Mtpa of run-of-mine coal.
Companies & ownership
  • BHP Group
    ASX:BHP
  • Mitsubishi Development
Saraji

Queensland, Australia · Open Pit

Operating
Coal
Commodities, grades and output
YearCommodityAv. GradeOutput
2025Coal-8100000 t
2024Coal-3287 kt
Opened
1974-01-01
End year
2049
Mine life
25 years
Production
Production overview - 2025: coal 8100000 t; 2024: coal 3287 kt.
Processing
The mine has a Coal Handling and Processing Plant (CHPP). Coal from up to 11 seams of the Moranbah Coal Measures is blended.
Expansion
BHP Mitsubishi Alliance (BMA) is proposing the Saraji East Mining Lease Project, a greenfield single-seam underground mine development that will be accessed through the existing Saraji open cut highwall. This project is expected to produce up to 8 million tonnes per year of metallurgical product coal over a 20-year life. The project would involve the extraction of up to 11 million tonnes per year of run-of-mine coal. The Environmental Impact Statement (EIS) assessment report for this project was issued to the proponent on 24 November 2025. In November 2025, BMA placed the Saraji South operation into a period of care and maintenance due to market conditions and the impact of Queensland's coal royalties.
Companies & ownership
  • BHP Group
    ASX:BHP
  • Mitsubishi Development
Peak Downs

Queensland, Australia · Open Pit

Operating
Coal
Commodities, grades and output
YearCommodityAv. GradeOutput
2023Coal-5480000 t
Opened
1972-01-01
Production
Production overview - 2023: coal 5480000 t.
Processing
The operation includes a coal handling and preparation plant.
Equipment
The mine utilises Caterpillar 797f rear dump trucks.
Expansion
A "Peak Downs Mine Continuation project" is proposed to expand the open-cut mining footprint. This project aims to produce up to 18 million tonnes of product coal annually for approximately 93 years. The project is currently in the Environmental Impact Statement (EIS) phase. The estimated operational workforce for this expansion is 2,400.
Companies & ownership
  • BHP Group
    ASX:BHP
  • Mitsubishi Development
Broadmeadow

Queensland, Australia · Underground

Operating
Coal
Opened
2005-01-01
Production
BHP's operational reviews for the 2025 financial year noted that steelmaking coal production was impacted by heavy wet weather and geotechnical challenges at the Broadmeadow underground mine. Despite these challenges, improved mining rates at Broadmeadow were reported in the third quarter of FY2025. For the first quarter of fiscal year 2026, steelmaking coal production rose by 8%, supported by strong mining rates at Broadmeadow.
Processing
Coal from Broadmeadow is processed jointly with coal from the Goonyella Riverside open cut operation. The Goonyella Riverside Mine has two coal processing plants where mined coal is sorted, washed, and blended to match demand specifications. After processing, the coal is transported by rail to the BMA-owned Hay Point Terminal.
Expansion
An extension to the Broadmeadow mine was approved in 2011.
Companies & ownership
  • Mitsubishi Development
  • BHP Group
    ASX:BHP
Goonyella Riverside

Queensland, Australia · Open Pit

Operating
Coal
Commodities, grades and output
YearCommodityAv. GradeOutput
2023Coal-780000 t
2019Coal-17100000 t
2013Coal-12400000 t
Opened
1971-01-01
Autonomous haulage
Yes
Workforce
BUMA Australia provides management, supervision, and a workforce of operators and maintenance trades.
Overview
The Goonyella mine commenced operations in 1971 and merged with the adjoining Riverside mine in 1989. The mine is part of the BMA (BHP Mitsubishi Alliance) joint venture. Coal is exported via the Goonyella railway line to Hay Point. The mine is located on the traditional lands of the Barada Barna people.
Production
Production overview - 2023: coal 780000 t; 2019: coal 17100000 t.
Processing
The site has two coal processing plants where mined coal is sorted, washed, and blended to meet customer specifications.
Equipment
The mine is transitioning to an autonomous haulage system with a fleet of up to 86 Komatsu 930E haul trucks. BUMA Australia, a mining services contractor, operates three prime fleets, including 600t and 800t excavators and trucks.
Expansion
An expansion to add up to 9 million tonnes per annum and up to 700 jobs has been considered.
Companies & ownership
  • Mitsubishi Development
  • BHP Group
    ASX:BHP
Peak Downs

Queensland, Australia · Open Pit

Operating
Coal
Commodities, grades and output
YearCommodityAv. GradeOutput
2022Coal-4295000 t
2019Coal-11.8 Mt
Opened
1972-01-01
Overview
The Peak Downs mine is a large open-cut coal mine located 31 kilometres south-east of Moranbah in Queensland, Australia. It is owned as a 50:50 joint venture between BHP and Mitsubishi Development, and is operated by BMA. The mine has been in operation since 1972. It is an open-pit operation that produces high-quality hard coking coal, which is a type of metallurgical coal essential for steel manufacturing. The mine targets seams within the Moranbah Coal Measures.
Production
Production overview - 2022: coal 4295000 t; 2019: coal 11.8 Mt.
Processing
The run-of-mine coal is processed at an on-site coal handling and preparation plant (CHPP). Additionally, approximately 2.5 million tonnes per annum of coal from Peak Downs is transported via an 11-kilometre overland conveyor to the CHPP at the nearby Caval Ridge mine.
Equipment
draglines, trucks, and shovels for overburden removal and coal extraction. The equipment fleet includes Liebherr 996B and 9800 excavators, Hitachi EX5600 excavators, and a range of Caterpillar (793, 797, 797f) and Liebherr (T 282 C) haul trucks.
Expansion
A "Peak Downs Mine Continuation Project" has been proposed to expand the open-cut footprint and extend the mine life by approximately 93 years, with a continued production rate of 18 million tonnes per annum.
Companies & ownership
  • BHP Group
    ASX:BHP
  • Mitsubishi Development
Mt Arthur Coal

New South Wales, Australia · Open Pit

Operating
Coal
Commodities, grades and output
YearCommodityAv. GradeOutput
2023Coal-14172000 t
2019Coal-18257000 t
Opened
2002-01-01
End year
2030
Workforce
2000
Overview
Mt Arthur Coal is an open-cut thermal coal mine located near Muswellbrook in the Hunter Valley, New South Wales, Australia. It is the largest coal mine in NSW, operating 24/7 from 21 unique seams. BHP plans to cease mining by the end of the 2030 financial year, with government approval for operations until June 2030. The mine exclusively serves international markets, transporting coal to the Port of Newcastle. BHP is exploring repurposing the 7,000-hectare site, potentially for a pumped hydro energy storage facility.
Production
Production overview - 2023: coal 14172000 t; 2019: coal 18257000 t.
Processing
The mine has a coal handling and preparation plant (CHPP) with a capacity to handle 2,000 tonnes per hour of raw coal and prepare 1,200 tonnes per hour. The process includes crushing, screening, cleaning, and sorting. Mined coal is transported to the CHPP, crushed, and then conveyed to one of three stockpiles: a domestic stockpile for local power stations, an export stockpile, or a stockpile for coal requiring further treatment.
Equipment
two Liebherr R 9800 800-tonne excavators, two Liebherr R 996B excavators, one Liebherr R 994B excavator, 44 Liebherr T 282C off-highway trucks, electric shovels, dozers, graders, drills, water carts
Companies & ownership
  • BHP Group
    ASX:BHP
Caval Ridge Mine

Queensland, Australia · Open Pit

Operating
Coal
Commodities, grades and output
YearCommodityAv. GradeOutput
2023Coal-9.36 Mt
2022Coal-3.9 Mt
Opened
2014-01-01
End year
2044
Mine life
30 years
Workforce
approximately 1,500
Production
Production overview - 2023: coal 9.36 Mt; 2022: coal 3.9 Mt.
Processing
The mine includes a Coal Handling and Preparation Plant (CHPP) with a design capacity of 2,400 tonnes per hour. The plant processes coal from both the Caval Ridge Mine and the neighbouring Peak Downs Mine, with the latter's coal transported via an overland conveyor. The CHPP utilises a single-stage process with dense medium cyclones, spirals, and flotation circuits. The plant has a feed rate capacity of 2,750 tonnes per hour through two modules.
Equipment
The mining operations at Caval Ridge utilise a conventional dragline excavator and a fleet of trucks and shovels for overburden removal. The equipment includes: Drills (Sandvik PV235 and Atlas Copco D90KS) Draglines (Marion 8050) Shovels (CAT 7495) Excavators (600-tonne) A contractor, Thiess, has mobilised four 600-tonne Liebherr 996B excavators and an 800-tonne Liebherr 9800 excavator, supported by Caterpillar 793 and 797 trucks.
Expansion
A proposed "Horse Pit Extension" aims to extend the mine's life from the 2030s to the 2050s. This extension would involve extending the existing Horse Pit in an easterly direction. The project is expected to produce up to 15 million tonnes per annum of hard coking coal for the export market.
Companies & ownership
  • BHP Group
    ASX:BHP
  • Mitsubishi Development
Peak Downs Mine

Queensland, Australia · Open Pit

Operating
Coal
Commodities, grades and output
YearCommodityAv. GradeOutput
2023Coal-10960000 t
2019Coal-11.8 Mt
Opened
1972-01-01
Capex (est.)
USD 2.00B
Workforce
The Peak Downs Mine Continuation Project is expected to provide for 2,400 operational jobs.
Overview
The Peak Downs Mine Continuation Project aims to continue production at a rate of up to 18 million tonnes of product coal per year.
Production
Production overview - 2023: coal 10960000 t; 2019: coal 11.8 Mt.
Processing
The run-of-mine coal is processed at an on-site coal handling and preparation plant (CHPP). Approximately 2.5 million tonnes per year of run-of-mine coal is also transported via an 11km overland conveyor to the CHPP at the nearby Caval Ridge mine.
Equipment
The mining fleet includes draglines, trucks, and shovels. Specific equipment mentioned includes Liebherr 996B and 9800 excavators, and Caterpillar 793 and 797 trucks. Five Liebherr T 282 C ultra-class trucks were also added to the fleet.
Expansion
The Peak Downs Mine Continuation Project is a significant expansion of the existing open-cut mine. This project is in the Environmental Impact Statement (EIS) phase and proposes to extend the mine life by approximately 93 years, producing up to 18 million tonnes of product coal annually. The project will involve the development of new supporting infrastructure and the relocation of some existing regional infrastructure.
Companies & ownership
  • BHP Group
    ASX:BHP
  • Mitsubishi Development
Broadmeadow Mine

Queensland, Australia · Underground

Operating
Coal
Opened
2005-01-01
Mine life
70 years
Overview
The Broadmeadow mine is part of the BHP Mitsubishi Alliance (BMA) assets in the Bowen Basin. The company is operating at slower mining rates to safely manage geotechnical characteristics of the current longwall panel, which is expected to continue into Q1 FY2026. Production guidance for FY2025 was impacted by significant wet weather and geotechnical challenges. FY2024 production from BMA was impacted by an extended longwall move and geotechnical issues at Broadmeadow.
Production
For the 2024-2025 financial year, BMA has set a production target of 33 million to 38 million tonnes (accounting for the sale of Blackwater and Daunia mines). In the 2023-2024 financial year, BMA produced 44.6 million tonnes of coal.
Processing
Coal from the mine is processed jointly with coal from the Goonyella Riverside open-cut operation at two coal processing plants where mined coal is sorted, washed and blended. Impurities are removed through washing and treatment at a coal handling and preparation plant.
Equipment
longwall shearer, conveyor belt, coal handling and preparation plant, longwall top coal caving method, new conveyor infrastructure
Expansion
new conveyor infrastructure was installed to replace shuttle cars and diesel ram cars for transporting coal from the face
Companies & ownership
  • BHP Group
    ASX:BHP
  • Mitsubishi Development
Goonyella Riverside Mine

Queensland, Australia · Open Pit

Operating
Coal
Commodities, grades and output
YearCommodityAv. GradeOutput
2023Coal-15.15 Mt
2019Coal-17.1 Mt
2018Coal-15.9 Mt
2012Coal-12.4 Mt
Opened
1971-01-01
End year
2041
Mine life
70 years
Autonomous haulage
Yes
Workforce
Quarterly worker numbers for Goonyella Riverside Mine have been recorded by Resources Safety and Health Queensland at 2,087, 1,914 and 1,748.
Overview
The Goonyella Riverside Mine is a large open-cut metallurgical coal mine in the Bowen Basin, located approximately 30 kilometres north of Moranbah, Queensland. It is operated by BHP Mitsubishi Alliance (BMA), a 50:50 joint venture between BHP and Mitsubishi Development. The operation commenced in 1971 as the Goonyella mine, which later merged with the adjacent Riverside mine in 1989. The mine targets the Goonyella Upper, Middle, and Lower Seams of the Moranbah Coal Measures. The coal is known for its high-quality coking characteristics. As of early 2022, the site was expected to have up to 86 autonomous haul trucks in operation. The mine complex includes two coal processing plants where the coal is crushed, washed, and blended. The final product is transported via the Goonyella railway line to the Hay Point Coal Terminal for export.
Production
Production overview - 2023: coal 15.15 Mt.
Processing
The mine has two coal handling and preparation plants. The run-of-the-mine coal is crushed to less than 50mm. A process of dense medium separation and column flotation is used to produce the final fine coal products.
Equipment
The transition to a fully autonomous haul truck fleet was a key development, with up to 86 Komatsu trucks to be automated by early 2022. An older equipment list included Marion 8050, BE 1370, and BE 1350 draglines; Liebherr R 9800 and Terex O&K RH 170 excavators; P&H4100XPB and P&H4100A shovels; Cat 994 front-end loaders; and a haul truck fleet including Komatsu 930E, Cat 793, and Cat 784 models. A mining services contractor, BUMA Australia, has been providing services since 2022, utilising 600t and 800t excavators and trucks.
Network
Fiber Optic BackboneWi-Fi Mesh (Kinetic)
Companies & ownership
  • BHP Group
    ASX:BHP
  • Mitsubishi Development
Mt Arthur Coal

New South Wales, Australia · Open Pit

Operating
Coal
Commodities, grades and output
YearCommodityAv. GradeOutput
2023Coal-14200000 t
Opened
2002-01-01
End year
2030
Workforce
2200 (as of June 2024)
Production
Production overview - 2023: coal 14200000 t.
Processing
The mined coal is transported by truck to the on-site Coal Handling and Preparation Plant (CHPP). The CHPP is approved to process up to 36 million tonnes per annum (Mtpa) of run-of-mine (ROM) coal. The process involves crushing, screening, cleaning, and sorting. The CHPP is equipped with two hoppers, a crushing station, and a conveyor system. Some coal seams are of sufficient quality to only require crushing, which is handled by an internal bypass system.
Equipment
The mining equipment includes large trucks, shovels, excavators, dozers, graders, drills, and water carts. A multi-bench multi-strip shovel and excavator operation is utilised.
Expansion
In June 2022, BHP announced it would seek approvals to continue mining at Mt Arthur Coal beyond its current consent, which expires in 2026, and proceed with a managed process to cease mining by the end of the 2030 financial year. A modification to the project approval was sought to allow for this four-year extension. This modification includes a reduction in the cumulative open cut and underground ROM coal handling rate from 36 Mtpa to 29 Mtpa, and a reduction in maximum total coal rail transportation from 27 Mtpa to 20 Mtpa. There will be an overall reduction of 387 hectares in the approved disturbance area.
Companies & ownership
  • BHP Group
    ASX:BHP
Saraji South

Queensland, Australia · Open Pit

Care And Maintenance
Coal
Opened
1974-01-01
Workforce
72 workers to be directly affected at Saraji South.
Overview
The Saraji South portion of the Saraji Mine complex will be placed into a period of care and maintenance from November 2025 due to market conditions and Queensland Government coal royalties.
Companies & ownership
  • BHP Group
    ASX:BHP
Mt Arthur Coal

New South Wales, Australia · Open Pit

Operating
Coal
Commodities, grades and output
YearCommodityAv. GradeOutput
2023Coal-14172000 t
2022Coal-19820201 t
Opened
2002-01-01
End year
2030
Workforce
2000
Production
Production overview - 2023: coal 14172000 t; 2022: coal 19820201 t.
Processing
The Mt Arthur Coal Complex includes a Coal Handling and Preparation Plant (CHPP) where raw coal is crushed and washed before export. Coarse coal waste is co-disposed within overburden emplacements, and fine coal waste (tailings) is pumped to a tailings storage facility.
Expansion
In June 2022, BHP announced its decision to cease mining at Mt Arthur Coal by the end of the 2030 financial year, after an attempt to sell the asset was unsuccessful. The New South Wales Government has granted approval for mining activities to continue until June 2030, extending the previous 2026 closure date. BHP is partnering with ACCIONA Energía to study the feasibility of developing a pumped hydro energy storage project at the site post-closure. Conceptual studies for the pumped hydro project suggest it could create around 1,000 jobs during construction. In November 2025, BHP announced the transfer of around 3,700 hectares of land from the Mt Arthur Coal site to the neighbouring Malabar Resources. This will allow Mt Arthur to use an existing mine void at Malabar's Maxwell Underground site for tailings storage.
Companies & ownership
  • BHP Group
    ASX:BHP
Saraji Mine

Queensland, Australia · Open Pit

Operating
Coal
Commodities, grades and output
YearCommodityAv. GradeOutput
2025Coal-4073 kt
2024Coal-3287 kt
Opened
1974-01-01
Mine life
25 years
Capex (est.)
USD 845.00M
Workforce
72 workers directly affected at the Saraji South site; BUMA Australia, a contractor, employs 80 people for pre-strip and coal mining operations.
Production
Production overview - 2025: coal 4073 kt; 2024: coal 3287 kt.
Processing
Coal is processed at a Coal Handling and Processing Plant (CHPP). The process involves three stages: coarse, fines, and ultra-fines.
Equipment
The mine is a conventional strip mining operation that uses draglines, trucks, and shovels. Equipment includes P&H 2800XP and P&H 4100A electric shovels, and Cat 793C rear dump trucks.
Expansion
Saraji South, a part of the Saraji mine complex, will be placed into a period of care and maintenance from November 2025. The Saraji East Project is a proposed single-seam underground longwall mine adjacent to the current operation, awaiting a final investment decision, with an estimated capital expenditure of AU$1.3 billion. The Grevillea Pit Continuation Project is a proposed expansion of the current Grevillea Pit to extract approximately 55 million tonnes of run-of-mine coal over 30 years.
Companies & ownership
  • Mitsubishi Development
  • BHP Group
    ASX:BHP
Goonyella Riverside

Queensland, Australia · Open Pit

Operating
Coal
Commodities, grades and output
YearCommodityAv. GradeOutput
2024Coal-22300000 t
2023Coal-29000000 t
Opened
1971-01-01
Autonomous haulage
Yes
Workforce
more than 1,000 workers
Production
Production overview - 2024: coal 22300000 t; 2023: coal 29000000 t.
Processing
The operation includes two coal processing plants where mined coal is sorted, washed, and blended.
Equipment
The mine has transitioned to an autonomous haul fleet. As of early 2022, up to 86 autonomous trucks were planned to be operational.
Expansion
BUMA Australia Pty Ltd secured a two-year contract extension to continue delivering mining services at the Goonyella Riverside Mine through to September 2027. The transition to autonomous fleets at Goonyella Riverside was a key development noted in BHP's FY2023 operational review.
Companies & ownership
  • BHP Group
    ASX:BHP
  • Mitsubishi Development
Mt Arthur Coal

New South Wales, Australia · Open Pit

Operating
Coal
Commodities, grades and output
YearCommodityAv. GradeOutput
2024Coal-15367907 t
2023Coal-14172415 t
Opened
2002-01-01
End year
2030
Workforce
2000
Overview
The open-cut mine consists of several pits, including Ayredale, Calool, Roxburgh, and Windmill. Mining is conducted 24 hours a day, seven days a week.
Production
Production overview - 2024: coal 15367907 t; 2023: coal 14172415 t.
Processing
on-site Coal Handling and Preparation Plant (CHPP), which has a capacity of 2,000 tonnes per hour of raw coal. The process involves crushing, screening, cleaning, and sorting.
Equipment
fleet of trucks, shovels, excavators, dozers, graders, and drills. The equipment includes Liebherr R 9800, R 996B, and R 994B excavators, and a fleet of 44 Liebherr T 282C haul trucks.
Companies & ownership
  • BHP Group
    ASX:BHP
Queensland Coal (BHP Mitsubishi Alliance - BMA)

Queensland, Australia · Open Pit

Operating
Coal
Commodities, grades and output
YearCommodityAv. GradeOutput
2025Coal-36 Mt
2023Coal-29 Mt
Workforce
approximately 10,000-12,000 employees and contractors
Overview
BHP Mitsubishi Alliance (BMA) is Australia's largest producer and supplier of seaborne metallurgical coal. The joint venture, established in 2001, operates five mines in the Bowen Basin of Central Queensland. BMA also owns and operates the Hay Point Coal Terminal near Mackay. In April 2024, BMA completed the sale of its Blackwater and Daunia mines to Whitehaven Coal. The company has also announced that the Saraji South mine will be placed into care and maintenance from November 2025.
Production
Production overview - 2025: coal 36 Mt; 2023: coal 29 Mt.
Companies & ownership
  • BHP Group
    ASX:BHP
  • Mitsubishi Development
Byerwen Mine

Queensland, Australia · Open Pit

Operating
Coal
Production
The mine produces hard coking coal for the export market, with some thermal coal as a by-product.
Companies & ownership
  • Byerwen Coal Pty Ltd
Middlemount Coal Mine

Queensland, Australia · Open Pit

Operating
Coal
Commodities, grades and output
YearCommodityAv. GradeOutput
2024Coal-4.02 Mt
2023Coal-2.2 Mt
2022Coal-4.27 Mt
2021Coal-4.75 Mt
2020Coal-2.92 Mt
2019Coal-4.46 Mt
2018Coal-5.3 Mt
2017Coal-5.12 Mt
Opened
2011-01-01
End year
2044
Workforce
559
Overview
The mine is permitted to extract up to 5.7 million tonnes per annum of run-of-mine coal. Coal is exported through the Dalrymple Bay Coal Terminal and Abbot Point Port.
Production
Production overview - 2024: coal 4.02 Mt; 2023: coal 2.2 Mt.
Processing
The mine uses conventional truck and shovel methods. Mining operations consist of excavator and truck strip mining, supplemented by cast and doze techniques. The run-of-mine (ROM) coal is processed on-site to remove impurities. The processing plant has a capacity of 5.3 million tonnes per year.
Equipment
The large mobile fleet is leased and maintained through partnerships with MacKellar Group, Sandvik and CAT/Hastings Deering.
Expansion
In February 2026, the Australian federal government approved the Middlemount Southern Extension Project. This project expands the open-cut operations to the south and is expected to extract an additional 112 million tonnes of run-of-mine coal.
Companies & ownership
  • NRW Holdings Limited
    ASX:NWH
  • Peabody Energy Australia Pty Ltd
  • Yancoal Australia Ltd
Ohio County Mine

West Virginia, United States · Underground

Operating
Coal
Commodities, grades and output
YearCommodityAv. GradeOutput
2022Coal-5777731 t
2021Coal-5419863 t
2019Coal-5987924 t
2018Coal-5905201 t
Workforce
435 (as of 2023)
Overview
The Ohio County Mine, also known as the Shoemaker Mine, is an active underground coal mine located in Marshall County, West Virginia, United States. The operator is Ohio County Coal Resources, Inc., a subsidiary of American Consolidated Natural Resources, Inc. The mine complex includes the Golden Ridge Portal, the Whitaker Portal, and the Ohio County Preparation Plant. The mine extracts thermal coal from the Pittsburgh #8 coal seam using longwall and continuous miner sections.
Production
Production overview - 2022: coal 5777731 t; 2021: coal 5419863 t.
Equipment
one longwall section and three continuous miner sections
Companies & ownership
  • American Consolidated Natural Resources
  • Ohio County Coal Resources, Inc.
  • American Consolidated Natural Resources
Marshall County Mine

West Virginia, United States · Underground

Operating
Coal
Commodities, grades and output
YearCommodityAv. GradeOutput
2023Coal-10156346
2022Coal-7311632
2020Coal-8850000
2019Coal-11718744
Workforce
840 (as of a 2023 MSHA report), 970 (in 2022)
Production
Production overview - 2023: coal 9214979.79996 t; 2022: coal 6633045.69792 t.
Processing
The mine complex includes the Marshall County Preparation Plant.
Equipment
5 continuous miner sections and 2 longwall sections are in operation.
Companies & ownership
  • American Consolidated Natural Resources
Marion County Mine

West Virginia, United States · Underground

Operating
Coal
Opened
1950-01-01
Workforce
518 coal miners as of a petition filed in mid-2025. Previously, the mine employed 517 miners in fiscal year 2023 and 462 miners in June 2021.
Processing
The mine complex includes the Sugar Run Preparation Plant. Coal from the mine is conveyed to a raw coal transfer building and then to the preparation plant. The plant uses a thermal dryer.
Equipment
The mine operates with 2 continuous miner sections and 1 longwall section. It is a belt haulage mine.
Companies & ownership
  • American Consolidated Natural Resources