Page 127 of 147 (3508 total)
Trappelberg Well Site

Rhineland-Palatinate, Germany · Underground

Under Development
Lithium
Overview
The Lionheart Project, operated by Vulcan Energy Resources in Rhineland-Palatinate, Germany, involves two drilling sites, Trappelberg and Schleidberg. It aims to produce lithium from geothermal brine in the Upper Rhine Valley, alongside renewable geothermal energy for heating and power. The project is supported by German government and European Investment Bank funding.
Production
The overall Lionheart Project targets an annual production of up to 24,000 tonnes of lithium hydroxide monohydrate, sufficient for approximately 500,000 electric vehicle batteries. It also aims to generate 275 GWh of electricity and 560 GWh of heat per year. Commercial production is planned to start in 2028.
Processing
Extracted lithium chloride will be processed into battery-quality lithium hydroxide monohydrate at a central plant in Frankfurt.
Equipment
The project uses V20 and V10 electric drilling rigs. The V20 rig has 2500 horsepower, a 550 tonne hook load capacity, and a 7500 psi fluid pressure system.
Companies & ownership
  • Vulcan Energy Resources
    ASX:VUL
Natürlich Insheim Geothermal Power Plant

Rhineland-Palatinate, Germany · Processing Facility

Operating
Lithium
Overview
Operational geothermal power plant acquired in January 2022, producing carbon-neutral electricity and serving as a site for piloting lithium extraction.
Production
Maximum electrical output of 4.8 MW and a maximum flow rate of 80 litres per second. Produces carbon-neutral electricity for approximately 6,500 households.
Companies & ownership
  • Vulcan Energy Resources
    ASX:VUL
Ranger Uranium Mine

Northern Territory, Australia · Open Pit

Closed
Uranium
End year
2021
Mine life
40 years
Overview
Australia's longest continually operating uranium oxide producer. Mining and processing activities at the Ranger mine ceased in January 2021 after 40 years of operation, and the site is now undergoing progressive rehabilitation. The mine consisted of open-pit operations at Pit 1 and Pit 3.
Production
uranium oxide producer
Processing
brine concentrator and reverse osmosis plants for water treatment
Equipment
17 haul trucks, 2 x 2500-6 excavators, 3 dozers, 3 drill rigs (mining fleet); 12 haul trucks, 1 x 2500 excavator, 1 x 1200 excavator, 2 drill rigs, 2 dozers (pre-extension fleet)
Companies & ownership
  • Energy Resources of Australia Ltd
    ASX:ERA
CentroGold Project

Maranhão, Brazil · Open Pit

Feasibility
Gold
Mine life
10 years
Overview
The CentroGold Project is one of the largest undeveloped gold projects in Brazil, located in the Gurupi greenstone belt. A Pre-Feasibility Study outlined a potential 10-year, low-cost, open-pit operation.
Companies & ownership
  • OZ Minerals
    ASX:OZL
Antas Mine

Pará, Brazil · Open Pit

Operating
CopperGold
End year
2021
Overview
The Antas Mine was an operating open-pit copper-gold mine in the Carajás province, Brazil, nearing the end of its life with pit closure planned for 2021. Its processing facility was positioned to continue as a hub for other ore sources.
Processing
Antas processing plant
Equipment
Antas processing plant
Companies & ownership
  • OZ Minerals
    ASX:OZL
West Musgrave Project

Western Australia, Australia · Open Pit

Under Development
NickelCopper
Commodities, grades and output
YearCommodityAv. GradeOutput
2022Nickel0.31 %720000 t
2022Copper0.34 %790000 t
Mine life
25 years
Capex (est.)
USD 1.10B
Workforce
Estimated to create approximately 1,500 jobs during construction and 400 ongoing operational roles. Contractor workforce reduced from 400 to 300 people in March 2024.
Overview
The West Musgrave Project is a copper and nickel project in the Musgrave Province of Western Australia, approximately 1,300 km north-east of Perth. It includes the Nebo and Babel nickel-copper deposits. A final investment decision was made in September 2022, and construction began in November 2022.
Production
Production overview - 2022: nickel 720000 t, copper 790000 t.
Processing
The planned processing facility has a capacity of 13.5 Mtpa, using dry grinding with vertical roller mills and a bulk flotation circuit to produce separate copper and nickel concentrates.
Equipment
processing facility, vertical roller mills, bulk flotation circuit, hybrid solar and wind power system
Expansion
Project temporarily suspended from October 2024 due to nickel market oversupply; review planned by February 2027. Construction was 30% complete at the time of suspension.
Power sources
WindSolar
Companies & ownership
  • BHP Group
    ASX:BHP
Shine Iron Ore Project

Western Australia, Australia · Open Pit

Care And Maintenance
Iron Ore
Overview
Development commenced in late 2020, with ore sales starting in August 2021. Operations were suspended in late 2021 due to a rapid deterioration in market conditions.
Companies & ownership
  • Mount Gibson Iron Limited
    ASX:MGX
Iron Hill

Western Australia, Australia · Open Pit

Closed
Iron Ore
End year
2019
Overview
Production commenced at the Iron Hill deposit after Extension Hill reserves were depleted. Final sales from Iron Hill were completed in February 2019.
Companies & ownership
  • Mount Gibson Iron Limited
    ASX:MGX
Extension Hill mine

Western Australia, Australia · Open Pit

Closed
Iron Ore
Companies & ownership
  • Mount Gibson Iron Limited
    ASX:MGX
Tallering Peak mine

Western Australia, Australia · Open Pit

Closed
Iron Ore
End year
2014
Equipment
mining fleet expanded with one excavator and four haul trucks
Companies & ownership
  • Mount Gibson Iron Limited
    ASX:MGX
Central Tanami Gold Project

Northern Territory, Australia · Processing Facility

Care And Maintenance
Gold
Overview
joint venture with Tanami Gold NL. The project's existing infrastructure includes a non-operating 1.2 million tonnes per annum carbon-in-leach processing plant, haul roads, an accommodation camp, a bore field, and a gravel airstrip.
Processing
carbon-in-leach processing plant
Companies & ownership
  • Mount Gibson Iron Limited
    ASX:MGX
Koolan Island

Western Australia, Australia · Open Pit

Care And Maintenance
Iron Ore
Commodities, grades and output
YearCommodityAv. GradeOutput
2025Iron Ore49.6 %-
2024Iron Ore65.4 %-
End year
2026
Workforce
Approximately 75 personnel have been retained for ongoing processing of stockpiles and site rehabilitation.
Overview
Mining operations were suspended in October 2025 after a significant rockfall made it unviable to continue. Prior to the suspension, production from Koolan Island was scheduled to conclude around September 2026. The company is processing and shipping remaining stockpiles, with a target to ship a further 1.0 million wet metric tonnes of low-grade material in the first half of 2026.
Production
Production overview - 2025: iron ore 480000 t; 2024: iron ore 700000 t.
Processing
Processing of existing ore stockpiles is continuing following the suspension of mining operations. This includes high-grade and lower-grade stockpiles. A tertiary crushing circuit was being installed in 2024 to handle harder oversized material.
Equipment
The load and haul fleet includes an all-Komatsu fleet of nine HD1500-8 dump trucks and two PC4000-11 hydraulic excavators. Some plant and equipment will be retained for potential use at the Central Tanami Gold Project.
Companies & ownership
  • Perenti Limited
    ASX:PRN
  • Mount Gibson Iron Limited
    ASX:MGX
Southdown Magnetite Project

Western Australia, Australia · Open Pit

Under Development
Iron Ore (Magnetite)
Overview
The company is evaluating strategic options for the project. Once developed, it is expected to have an initial annual production rate of 5 million tonnes of premium magnetite concentrate.
Port Latta

Tasmania, Australia · Processing Facility

Operating
Iron Ore
Production
over 2.5 million tonnes of premium quality iron ore pellets annually
Equipment
port with a dock, dolphin fenders
Savage River

Tasmania, Australia · Open Pit

Operating
Iron Ore (Magnetite)
Overview
The mine consists of several open-cut workings, primarily the North, Central, and South pits. Mining activities in 2025 were focused on ore production from Centre Pit and waste stripping at North Pit. A definitive feasibility study has been completed to transition the North Pit from an opencut to an underground block cave and sublevel cave mine. This development is expected to commence in early 2026, with the first ore anticipated between late 2028 and mid-2029.
Production
high-concentrate magnetite
Processing
concentrator plant
Equipment
concentrator plant, tanks, conveyors, excavator, water carts
Kestrel Mine

Queensland, Australia · Underground

Operating
Coal
Overview
Underground longwall coal mine Metallurgical (coking) coal (plus some thermal)
Companies & ownership
  • Kestrel Coal Resources
Centurion Mine

Queensland, Australia · Longwall

Operating
Coal
Opened
2026-01-01
End year
2055
Mine life
25 years
Workforce
500 people
Overview
The Centurion Mine is an underground longwall operation owned by Peabody Energy, located in the Bowen Basin of Queensland, Australia. The mine produces premium hard coking coal, also referred to as metallurgical coal. Previously known as the North Goonyella mine, Peabody committed to its redevelopment in late 2022 and renamed it the Centurion mine in December 2023.
Production
average annual production of 4.7 million tons; 2026 target of 3.5 million tonnes, ramping up to 4.7 million-tonne annual run rate by 2028; northern extension expected to produce up to 7.1 million tonnes per annum of run-of-mine coal between 2029 and 2055
Processing
coal handling preparation plant
Equipment
newly installed 300-meter longwall system, four continuous miner units, a coal handling preparation plant, a dedicated rail loop, a small generating plant, and a natural gas facility with plans for a 5-megawatt power station
Companies & ownership
  • Evolution Mining Ltd.
    ASX:EVN
  • Peabody Energy Corporation
    NYSE:BTU
Burton Mine

Queensland, Australia · Open Pit

Operating
Coal
Companies & ownership
  • Bowen Coking Coal Limited
    ASX:BCB
  • PT BUMA Internasional Grup Tbk
    ASX:DOID
Blackwater Project

British Columbia, Canada · Open Pit

Under Development
Gold
Overview
8% gold stream
Companies & ownership
  • Whitehaven Coal
    ASX:WHC
  • FE Steel
  • Nippon Steel
  • New Gold Inc.
    TSX:NGD
Airly Mine

New South Wales, Australia · Underground

Operating
Coal
Opened
2009-01-01
End year
2031
Mine life
20 years
Workforce
130 people
Overview
The mine produces thermal coal primarily for the domestic market, with some for export. It is authorised to extract up to 1.8 million tonnes of run-of-mine coal per annum. The target coal seam is the Lithgow Seam.
Production
authorised to extract up to 1.8 million tonnes of run-of-mine coal per annum; 2020 production was around 1.5 million tonnes
Processing
Run-of-mine coal is processed in the on-site CHPP before being transported by rail. Some reports indicate that coal is transported by rail to Springvale Coal Services for processing.
Equipment
continuous miners, coal handling and preparation plant (CHPP), coal crushing plant, rail spur and balloon loop, 2-megawatt solar farm
Expansion
An extension project has been proposed to extend the mine's life by a further 25 years.
Companies & ownership
  • Centennial Airly Pty Limited
  • Centennial Coal Company Limited
    ASX:CEY
Challenger

South Australia, Australia · Underground

Care And Maintenance
GoldSilver
Workforce
300–400 personnel
Overview
Challenger Mine is a nickel sulphide mining operation in the Western Australia Goldfields region.
Processing
nickel sulphide
Equipment
Underground mining equipment, Support & Surface equipment, Processing
Companies & ownership
  • Western Areas Ltd
Chain Valley

New South Wales, Australia · Underground

Operating
Coal
Workforce
330 direct employees
Overview
Chain Valley Colliery is an underground thermal coal mine located at Mannering Park on the southern shore of Lake Macquarie in New South Wales. It has been operating since 1962, supplying coal primarily to the nearby Vales Point Power Station and for export markets via Port Waratah Coal Services.
Processing
Thermal (electricity) coal
Equipment
Continuous miners, roof bolters, conveyors, haulage & support gear
Companies & ownership
  • Delta Coal Pty Ltd
Century

Queensland, Australia · Tailings

Operating
Zinc
Overview
This operation is a tailings reprocessing facility, extracting zinc from the tailings of the former Century open-pit mine. The concentrate produced is transported via a 304-kilometre underground pipeline to the port facility at Karumba.
Processing
tailings reprocessing facility
Companies & ownership
  • MMG Limited
  • Sibanye-Stillwater Limited
    NYSE:SBSW
Central Eyre

South Australia, Australia · Open Pit

Under Development
Iron Ore
Workforce
Around 3,000 jobs
Overview
Central Eyre Iron Project is a large proposed iron ore mining project located on the Eyre Peninsula in South Australia, near the town of Wudinna.
Processing
Magnetite iron ore
Equipment
Electric mining shovels, Hydraulic excavators, Large haul trucks (220–400 tonne capacity), Drill rigs for blasting, Bulldozers, Motor graders
Companies & ownership
  • Iron Road Limited
Page 127 of 147 (3508 total)