Mimosa Operation

Midlands Province, Zimbabwe · Underground

Operating
PlatinumPalladiumRhodiumRutileIron OreGold+2
End year
2034
Overview
The Mimosa Operation is a shallow, mechanised underground mine located in Zimbabwe, situated on the Wedza Geological Complex of the Zimbabwean Great Dyke, 32 kilometres west of Zvishavane. It is a 50/50 joint venture between Sibanye-Stillwater and Impala Platinum.
Production
Annual production rate is approximately 2.9 million tonnes of ore. For the six months ending 31 December 2025, the mine produced 123,000 ounces of 6E concentrate. In the 2023 financial year, production was 245,000 ounces of 6E in concentrate. As of 31 December 2024, the 4E PGM production figure was 122,639 ounces.
Processing
on-site concentrator plant involving crushing, screening, milling, flotation, thickening, and filtration, with an operational capacity of approximately 233,000 tonnes per month.
Equipment
ore bunker, workshops, pump stations, network of strike, dip, and main conveyors, fleet of trackless mining machinery

Companies & Ownership (1)

Marikana Operation

North West province, South Africa · Underground

Operating
PlatinumPalladiumRhodiumGoldNickelCopper+1
Opened
1987-01-01
End year
2069
Workforce
19,454 employees and contractors as of 31 December 2024
Overview
The Marikana Operation, which includes Western Platinum Limited and Eastern Platinum Limited, is an active mining complex located in the Marikana district, 40 kilometres east of Rustenburg in the North West province of South Africa. The primary commodities produced are Platinum Group Metals (PGMs), including platinum, palladium, rhodium, and gold (referred to as 4E PGM), as well as iridium, ruthenium, nickel, copper, and chrome. The mine is a large, established, shallow to moderate depth PGM complex.
Production
679,245 ounces of 4E PGM for the year ending 31 December 2024; combined fresh ore milling capacity of approximately 600,000 tonnes per month.
Processing
Ore mined at Marikana is processed through four of the eight available concentrators, which have a combined fresh ore milling capacity of approximately 600,000 tonnes per month. The resulting concentrate is sent to the on-site smelter, which has five furnaces, to produce a sulphide-rich matte. This matte undergoes further processing at the Base Metal Refinery (BMR) where nickel and copper are extracted. The final PGM-rich product is then sent to the Precious Metal Refinery (PMR) in Brakpan for final treatment to produce refined precious metals.
Equipment
multiple incline and vertical shaft systems, four concentrators, on-site smelter with five furnaces, Base Metal Refinery (BMR), Precious Metal Refinery (PMR), workshops, office blocks, a laboratory, equipment stores, accommodation, and water treatment plants

Companies & Ownership (1)

Kroondal Operation

North West Province, South Africa · Underground

Operating
PlatinumPalladiumRhodiumGoldNickelCopper
End year
2029
Workforce
6,972 employees and contractors as of 31 December 2024
Overview
Kroondal Operation is a shallow, low-cost, mechanised underground mine. It is located on the Western Limb of the Bushveld Complex, 12 kilometres east of Rustenburg in the North West Province of South Africa, approximately 120 kilometres north-west of Johannesburg.
Production
In 2024, the Kroondal Operation produced 280,556 ounces of 4E PGMs. The K1 plant has a design capacity of 290,000 tonnes per month, and the K2 plant has a design capacity of 300,000 tonnes per month.
Processing
dense media separation at two concentrator plants (K1 and K2) to remove waste, followed by flotation
Equipment
mechanised drilling, loading, and hauling equipment; 20 chairlifts, 210 conveyors, 178 mini-subs, 17 substations, 19 ventilation fans; 133 LHDs (Load-Haul-Dump vehicles), 29 roof-bolters, and 28 drill rigs
Expansion
A transaction to assume full ownership was expected to extend the overall life of the Kroondal operation to 2029.

Companies & Ownership (1)

Columbus Metallurgical Complex

Montana, United States · Processing Facility

Operating
PlatinumPalladiumRhodiumNickelCopperCobalt
Overview
Smelting and refining facility processing PGMs (platinum, palladium, rhodium), nickel, copper, and cobalt. It recycles PGMs from catalytic converters and processes concentrates from Stillwater and East Boulder mines.
Production
In 2024, 425,842 2E PGM ounces from mine production and 316,470 3E PGM ounces from recycled catalytic converters.
Processing
Utilises sulphuric acid solution to dissolve base metals from PGM-bearing converter matte, producing a PGM-rich filter cake for third-party refining. Recycled materials are crushed, sampled, and blended with concentrates.
Equipment
Smelter with concentrate drying plant, two electric furnaces, two top-blown rotary converters, matte granulator, gas handling and solution regeneration systems (max design capacity 20,000 lbs/hour). Base metals refinery (capacity 1,300 lbs/hour of matte). Analytical laboratory.

Companies & Ownership (1)

Stillwater Mine

Montana, United States · Underground

Operating
PalladiumPlatinumGoldSilverCopperNickel
Opened
1986-01-01
End year
2049
Workforce
As of 31 December 2024, the US PGM operations, which include the Stillwater and East Boulder mines, had a combined workforce of 911 employees and contractors. A September 2024 announcement indicated a significant restructuring of the US PGM operations, including a reduction of approximately 700 employees.
Overview
The Stillwater Mine is an underground mining operation located near the town of Nye in Stillwater County, Montana, in the United States. It targets the J-M Reef, a significant source of platinum group metals (PGMs) in the United States.
Production
For the year 2023, the Stillwater mine was expected to produce between 260-300 thousand ounces of 2E PGM (platinum and palladium) in concentrate. The production target for the entire US PGM operations as of 31 December 2024, is 425,842 ounces of 2E PGM.
Processing
Ore processing occurs on-site at a concentrator plant. The process involves milling and treating the ore to produce a concentrate. This concentrate is then transported to the company's Columbus Metallurgical Complex in Columbus, Montana, for smelting and refining into a PGM-rich filter cake.
Equipment
underground mining fleet, concentrator plant, new concentrate handling system, new processing facility, workshops, warehouse, change facilities, headframe, hoist house, sand and paste plants, water treatment and storage facilities, offices
Expansion
new concentrate handling system added in 2021 and the balance of a new processing facility commissioned in 2023. Stillwater West section temporarily suspended in 2024 due to restructuring. September 2024 announcement indicated a significant restructuring of the US PGM operations, including a reduction of approximately 700 employees.

Companies & Ownership (1)

Stargate Nickel Mine

Southeast Sulawesi, Indonesia · Open Pit

Operating
Nickel
Overview
A nickel ore mining operation located in the North Konawe Regency of Southeast Sulawesi, Indonesia, acquired by PT United Tractors Tbk in late 2023.
Production
1.9 million tonnes of nickel ore in 2024; projected 2-2.5 million tonnes/year for 2025-2026; expected to increase to 3 million tonnes/year in 2027.
Processing
Rotary Kiln Electric Furnace (RKEF) smelter planned for 2027; High Pressure Acid Leach (HPAL) smelter under feasibility study.
Equipment
Excavators and haul trucks
Expansion
Construction of a Rotary Kiln Electric Furnace (RKEF) smelter targeted for 2027 with 13,000 tonnes per year NPI production capacity; feasibility study underway for a High Pressure Acid Leach (HPAL) smelter.

Companies & Ownership (1)

Angaston Quarry

South Australia, Australia · Open Pit

Operating
PhosphateMineral SandsSilica SandKaolinHalloysiteTitanium+39
Opened
1950-01-01
Workforce
40 jobs (2014)
Overview
The operational mine is an open-pit quarry located approximately 2.5 kilometres north of the township of Angaston, in the Barossa Valley region of South Australia, Australia. It produces limestone, marble, and aggregates for various industrial uses.
Production
approximately one million tonnes of industrial minerals and aggregates per annum (2014); 900,000 tonnes of material (2016)
Processing
crushing and grading of the extracted materials
Equipment
large fleet of Komatsu equipment, including WA600-3 and WA480-6 loaders and HD785-5 and HD465-5 dump trucks (information from 2010)

Companies & Ownership (1)

Spotted Quoll Mine

Western Australia, Australia · Underground

Care And Maintenance
Nickel
End year
2024
Overview
Underground nickel mine, part of the Forrestania Operation, contributing ore to the Cosmic Boy concentrator. A significant seismic event in July 2024 expedited the cessation of mining activities.
Equipment
Longhole open stoping mining method.

Companies & Ownership (1)

Cosmic Boy processing facility

Western Australia, Australia · Processing Facility

Care And Maintenance
Nickel
Commodities, grades and output
YearCommodityAv. GradeOutput
2024Nickel-7571 t
2022Nickel-14028 t
2021Nickel3.2 %16180 t
2020Nickel-20900 t
2019Nickel-21483 t
2014Nickel-25700 t
2012Nickel4.9 %6722 t
Opened
2009-01-01
End year
2024
Overview
The Cosmic Boy processing facility, part of the Forrestania Operation, is owned and operated by IGO Limited in Western Australia. It is currently under care and maintenance, with IGO divesting the plant to Medallion Metals Limited while retaining nickel and lithium exploration rights.
Production
Production overview - 2022: nickel 14028 t; 2021: nickel 16180 t.
Processing
Primary, secondary, and tertiary crushing, followed by grinding in a ball mill and a flotation circuit to produce nickel concentrate. A bio-leach process was added for partially oxidised ores.
Equipment
nickel sulphide flotation plant, primary, secondary, and tertiary crushers, ball mill, flotation circuit, bio-leach process
Expansion
Mill Recovery Enhancement Project, which added a bio-leach process

Companies & Ownership (1)

Spotted Quoll underground mine

Western Australia, Australia · Underground

Care And Maintenance
Nickel
Opened
2009-01-01
End year
2024
Overview
The Spotted Quoll mine is an underground nickel mine located in Western Australia. It is part of the Forrestania Nickel Operation, situated approximately 400 kilometres east of Perth and 80 kilometres east-southeast of Hyden in the Shire of Kondinin.
Production
For the 2022-23 financial year, the Forrestania Operation, which includes Spotted Quoll, produced 11,931 tonnes of nickel. In the 2023-24 financial year, production was 7,571 tonnes of nickel.
Processing
Ore from Spotted Quoll was processed at the nearby Cosmic Boy concentrator. The processing method involves a three-stage crushing circuit, a single circuit ball mill, and flotation tanks to produce a nickel concentrate. The concentrate is then dewatered through thickening and filtration. The Cosmic Boy facility has a treatment capacity of up to 600,000 tonnes of ore per year. In 2018, a Mill Recovery Enhancement Project involving nickel bio-leaching was added to the plant to process partially oxidised ores.
Equipment
Atlas Copco T1D & H104 drills and four Caterpillar R1300G tele-remote loaders

Companies & Ownership (1)

Häggån Polymetallic Project

Sweden · Open Pit

Under Development
UraniumVanadiumMolybdenumNickel

Companies & Ownership (1)

PT Sunny Metal Industry (SNMI) nickel smelter

Central Halmahera, Indonesia · Processing Facility

Operating
Nickel

Companies & Ownership (1)

PT Blue Sparking Energy (BSE) High-Pressure Acid Leaching (HPAL) project

Central Halmahera, Indonesia · Processing Facility

Under Development
Nickel
Processing
High-Pressure Acid Leaching (HPAL)

Companies & Ownership (1)

PT Westrong Metal Industry (WMI) nickel smelter

Central Halmahera, Indonesia · Processing Facility

Operating
Nickel

Companies & Ownership (1)

PT Infei Metal Industry (IMI) nickel smelter

Central Halmahera, Indonesia · Processing Facility

Operating
Nickel

Companies & Ownership (1)

PT Position (POS) Mine

East Halmahera, North Maluku, Indonesia · Open Pit

Operating
Nickel

Companies & Ownership (1)

PT Obi Nickel Cobalt (ONC) HPAL refinery

North Maluku Province, Indonesia · Processing Facility

Operating
NickelCobalt
Workforce
The specific number of employees at the PT Obi Nickel Cobalt (ONC) facility has not been disclosed in the available documents.
Overview
The HPAL refinery processes limonite nickel ore using High-Pressure Acid Leaching technology to produce Mixed Hydroxide Precipitate (MHP) containing nickel and cobalt, key materials for electric vehicle batteries.
Production
65,000 tonnes of nickel content per year in the form of MHP
Processing
High-Pressure Acid Leaching (HPAL) technology, hydrometallurgical process using high temperature and pressure with sulfuric acid to extract nickel and cobalt from low-grade limonite ore
Equipment
three production lines, autoclaves

Companies & Ownership (1)

PT Halmahera Jaya Feronikel (HJF)

North Maluku, Indonesia · Processing Facility

Operating
Nickel
Workforce
Expected total workforce of approximately 5,000 employees when fully operational; initially employed 2,600 workers.
Overview
The RKEF smelter project, officially named PT Halmahera Jaya Feronikel (HJF), is a ferronickel smelter located in Kawasi Village, Obi sub-district, Obi Island, South Halmahera, North Maluku, Indonesia.
Production
Input capacity of 7.8 million tons of saprolite nickel ore per year, producing 780,000 to 829,000 tons of ferronickel annually (87,000 to 120,000 tons nickel metal content). 2023 production estimated at 65,000 tons contained nickel. 2024 ferronickel sales: 126,344 tons.
Processing
Rotary Kiln Electric Furnace (RKEF) technology, processes high-grade saprolite nickel ore
Equipment
Rotary Kiln Electric Furnace (RKEF) technology, eight RKEF production lines

Companies & Ownership (1)

KPS RKEF project

North Maluku Province, Indonesia · Processing Facility

Under Development
Nickel
Overview
The KPS RKEF project is a major smelter development on Obi Island, processing saprolite nickel ore to produce ferronickel using Rotary Kiln Electric Furnace (RKEF) technology. The total investment for the project is stated to be USD 1.9 billion.
Production
Upon completion, the KPS RKEF project is expected to have an annual production capacity of 185,000 tonnes of contained nickel in ferronickel. The first phase has a reported capacity of 60,000 tonnes per annum. In the first quarter of 2025, the sales volume from the initial phase was 11,793 tonnes of contained nickel in ferronickel.
Processing
Rotary Kiln Electric Furnace (RKEF) technology, processes saprolite nickel ore to produce ferronickel
Equipment
Rotary Kiln Electric Furnace (RKEF) technology, 12 production lines
Expansion
The project is being constructed in multiple phases. The first phase commenced operations in January 2025 and achieved full capacity in March 2025. The second phase, which includes four production lines, was reported to have reached 69% completion and is anticipated to start production in the fourth quarter of 2025. A third phase is also under construction, with an expected commercial operation date in the first quarter of 2026.

Companies & Ownership (1)

PT Gane Tambang Sentosa

North Maluku Province, Indonesia · Open Pit

Operating
Nickel
Opened
2025-01-01
End year
2040
Overview
The mine is officially named PT Gane Tambang Sentosa, abbreviated as PT GTS. It is operated by its parent company, PT Trimegah Bangun Persada Tbk (also known as Harita Nickel), which holds a 99% ownership stake following an acquisition in November 2023.
Processing
The parent company, PT Trimegah Bangun Persada Tbk, operates both High-Pressure Acid Leaching (HPAL) and Rotary Kiln Electric Furnace (RKEF) processing facilities on Obi Island to treat limonite and saprolite nickel ores respectively. Sources do not specify which processing facilities will treat ore from the PT GTS mine.

Companies & Ownership (1)

Jikodolong prospect

North Maluku Province, Indonesia · Open Pit

Under Development
Nickel
Overview
The Jikodolong prospect is a nickel laterite ore mining project located on Obi Island, South Halmahera Regency, North Maluku Province, Indonesia. The project is operated by PT Jikodolong Megah Pertiwi (JMP), in which PT Trimegah Bangun Persada Tbk holds a 99.6% indirect ownership stake. The concession covers 1,885 hectares and was in the exploration stage as of early 2025, preparing infrastructure and awaiting a Forest Area Borrow-Use Permit.

Companies & Ownership (1)

HPAL refinery (PT Obi Nickel Cobalt / ONC)

North Maluku, Indonesia · Processing Facility

Under Development
Nickel
HPAL project (HPL)

North Maluku, Indonesia · Processing Facility

Operating
NickelCobalt
Opened
2021-01-01
Workforce
1,900 employees
Overview
First HPAL plant in Indonesia, processing low-grade limonite nickel ore to produce MHP, nickel sulphate, and cobalt sulphate for the EV battery industry.
Production
Capacity of 55,000 tonnes of nickel-cobalt metal per year; produced 33,001 tonnes of contained nickel of MHP in H1 2024; capacity to process 8.3 million tonnes of limonite nickel ore annually to produce 365,000 tonnes of MHP.
Processing
High-Pressure Acid Leaching (HPAL) hydrometallurgical technology using high temperature and pressure with sulphuric acid.
Equipment
autoclaves, sulphuric acid plant, power plants, port terminals

Companies & Ownership (1)

RKEF smelter project (MSP)

North Maluku, Indonesia · Processing Facility

Under Development
Nickel
Commodities, grades and output
YearCommodityAv. GradeOutput
2024Nickel-25000 t
2023Nickel-25000 t
2022Nickel-25000 t
2021Nickel-25000 t
2020Nickel-25000 t
2019Nickel-25000 t
2018Nickel-25000 t
2017Nickel-25000 t
Opened
2017-01-01
Workforce
The HJF facility was expected to employ approximately 5,000 people upon full operation in the first half of 2023.
Overview
The Obi Island industrial area in North Maluku, Indonesia, hosts a large, integrated nickel processing operation owned and operated by PT Trimegah Bangun Persada Tbk (Harita Nickel). It comprises multiple Rotary Kiln Electric Furnace (RKEF) smelters for producing ferronickel from saprolite ore, and High-Pressure Acid Leaching (HPAL) plants for processing limonite ore into electric vehicle battery materials. The complex is located in the Kawasi village area and has been designated a National Strategic Project.
Production
The first RKEF smelter (MSP) has been operational since 2017 with a production capacity of 25,000 tonnes of nickel content in ferronickel per year. The second RKEF smelter (HJF) commenced operations in 2023 with an installed capacity of 95,000 tonnes of ferronickel per year.
Processing
The facility uses Rotary Kiln Electric Furnace (RKEF) technology to convert high-grade saprolite nickel ore into ferronickel. Additionally, High-Pressure Acid Leaching (HPAL) plants process low-grade limonite ore into materials for electric vehicle batteries. Nickel slag, a by-product from the RKEF smelters, is recycled to produce materials like bricks and concrete mix for use within the operational area.
Expansion
PT Karunia Permai Sentosa (KPS) is developing the third RKEF smelter, which is currently under construction. This project is projected to have 12 production lines with a total capacity of 185,000 tonnes of nickel content in ferronickel per year. The first phase, consisting of four lines with a capacity of 60,000 tonnes, was expected to begin operations in the first quarter of 2025.

Companies & Ownership (1)