Santa Clara project

Minas Gerais, Brazil · Open Pit

Under Development
LithiumTin
Overview
The Santa Clara project is an exploration-stage lithium property wholly-owned by the Canadian mining company Sigma Lithium Corporation. It is located in the state of Minas Gerais, Brazil. It forms part of what Sigma Lithium refers to as the Northern Complex of its land holdings, which also includes the Grota do Cirilo and Genipapo properties.

Companies & Ownership (1)

São Jose

Minas Gerais, Brazil · Open Pit

Under Development
Lithium
Overview
The São Jose property is a lithium property in Brazil operated by the Canadian mining company Sigma Lithium Corporation. It is located in the state of Minas Gerais, in the municipalities of Araçuaí and Itinga, within the Jequitinhonha Valley region. It is considered an advanced spodumene exploration project with historical lithium mining activities.

Companies & Ownership (1)

Grota do Cirilo

Minas Gerais, Brazil · Open Pit

Operating
Lithium
Commodities, grades and output
YearCommodityAv. GradeOutput
2025Lithium-44000 t
2024Lithium5.5 %-
Opened
2023-01-01
Mine life
25 years
Workforce
600 (as of February 2026)
Production
Production overview - 2025: lithium 44000 t.
Processing
The operation uses a Greentech plant with a three-stage crushing circuit and a dense media separation plant. The process uses 100% renewable energy, 100% recycled water, no hazardous chemicals, and features dry-stacked tailings.
Expansion
The company is constructing a second Greentech plant (Phase 2) to add 250,000 tonnes of annual capacity, bringing total expected production to 520,000 tonnes per year. Earthworks for the expansion began in early 2024. Commissioning of the second plant is expected to begin in the fourth quarter of 2025, with completion by the end of 2026. A January 2024 update increased the audited mineral resource by 27% to 109 million tonnes, supporting a mine life of over 20 years. Proven and Probable reserves increased by 40% to 77 million tonnes at 1.4% lithium oxide.

Companies & Ownership (1)

Greenbushes Lithium Mine

Western Australia, Australia · Open Pit

Operating
Lithium
Commodities, grades and output
YearCommodityAv. GradeOutput
2025Lithium1.9 %1350000 t
2024Lithium2 %1480000 t
2020Lithium-1950000 t
Opened
1983-01-01
End year
2048
Overview
Greenbushes is an open-pit mine located in Western Australia, producing lithium, tantalum, and tin. It is operated by Talison Lithium Australia Pty Ltd. Talison Lithium is owned by a joint venture between Tianqi Lithium Energy Australia Pty Ltd (TLEA) (51%) and Albemarle Corporation (49%). IGO Limited has a 49% interest in TLEA, giving it a 24.99% indirect interest in Greenbushes, with Tianqi Lithium Corporation holding the remaining 51% of TLEA.
Production
Production overview - 2025: lithium 1350000 t; 2024: lithium 1480000 t.
Processing
The Greenbushes operation has four processing plants: one for technical grade lithium concentrate, two for chemical grade lithium concentrate, and a tailings retreatment plant. A third Chemical Grade Plant (CGP3) commenced commissioning with its first ore feed on 18 December 2025. The CGP3 project's total cost is estimated at approximately A$880M. CGP3 adds about 500,000 tonnes per year of spodumene concentrate capacity, increasing the total site capacity to around 2.1 million tonnes per year. CGP3 is expected to reach nameplate capacity in 2026. Further plant debottlenecking is planned to lift combined production during 2027, with total ore processed expected to increase to approximately 7 million tonnes per year by 2028.
Expansion
A significant expansion is underway to increase the production of lithium mineral concentrate. The Western Australian Environmental Protection Authority (EPA) has approved amendments to the development envelope, increasing it from 2,207 hectares to 2,791 hectares. The expansion includes the construction of new waste rock landforms, the expansion of the Salt Water Gully Dam, and new water management infrastructure. A review is also underway to assess options for underground mining, with a new underground Mineral Resource Estimate of 132 million tonnes grading 1.5% Li₂O defined below the current open pit.

Companies & Ownership (3)

Yinnetharra Lithium Project

Western Australia, Australia · Open Pit

Under Development
Lithium

Companies & Ownership (1)

Mt Ida Lithium Project

Western Australia, Australia · Open Pit

Under Development
LithiumRhodiumTantalumGold
Commodities, grades and output
YearCommodityAv. GradeOutput
2025Lithium1.21 %14.8 Mt
2025Rhodium0.42 %14.8 Mt
2025Tantalum170 ppm14.8 Mt
2024Gold3.5 g/t752000 oz
2023Lithium1.2 %14.6 Mt
2023Gold4.1 g/t412000 oz
2022Lithium1.2 %12.7 Mt
Mine life
10 years
Overview
The Mt Ida Project is described as "shovel-ready" and is currently under development. As of November 2023, the project has received all statutory approvals for the commencement of open pit mining operations from the Western Australian Department of Mines, Industry, Regulation and Safety (DMIRS), including an approved Mining Proposal and Mine Closure Plan. The project is fully permitted for both open pit and underground mining. Feasibility studies for a lithium concentrate project are underway.
Production
Production overview - 2025: lithium 14.8 Mt, rhodium 14.8 Mt, tantalum 14.8 Mt; 2024: gold 752000 oz.
Processing
The proposed processing method is a whole-of-ore flotation (WOF) flowsheet. This process is designed to produce tantalite, mica, and spodumene concentrates. Test work has confirmed that rubidium can be readily extracted as a by-product within the mica pre-float stage, with recoveries averaging around 90%. Downstream processing and vertical integration studies are in progress.
Equipment
multiple reverse circulation (RC) and diamond drill rigs
Expansion
Significant potential for further resource growth, with ongoing drilling programs aimed at expanding the current mineral resources. A new LCT (Lithium-Caesium-Tantalum) pegmatite discovery has been made in the Sister Sam footwall, indicating exploration upside.

Companies & Ownership (1)

Greenbushes Lithium Operation

Western Australia, Australia · Open Pit

Operating
Lithium
Opened
1983-01-01
End year
2048
Mine life
24 years
Workforce
more than 1,500 people
Overview
The Greenbushes mine is owned and operated by Talison Lithium Pty Ltd, a joint venture between Tianqi Lithium Energy Australia Pty Ltd (51%) and Albemarle Corporation (49%). IGO Limited holds an indirect interest of 24.99% through its 49% stake in Tianqi Lithium Energy Australia Pty Ltd.
Production
lithium: 1.48 Mt
Processing
The operation has four processing plants: Chemical Grade Plant 1 (CGP1), Chemical Grade Plant 2 (CGP2), a Tailings Retreatment Plant (TRP), and a Technical Grade Plant (TGP). The commissioning of Chemical Grade Plant 3 (CGP3) commenced in December 2025, with a capacity of approximately 500,000 tonnes per annum of spodumene concentrate, increasing the total site capacity to around 2.1 million tonnes per annum. The processing method involves gravity, heavy media separation, flotation, and magnetic processes.
Expansion
A significant expansion is underway. Chemical Grade Plant 3 (CGP3) began commissioning in December 2025, with an estimated project cost of approximately A$880 million. There are proposals to expand the mine to the east and south, including additional waste rock landforms and expanded water storage capacity, increasing the development envelope by 619 hectares to 2,826 hectares. A potential fourth chemical grade plant (CGP4) is also being considered. An underground Mineral Resource Estimate has been defined, suggesting future underground mining potential.

Companies & Ownership (1)

Mt Holland Lithium Project

Western Australia, Australia · Open Pit

Operating
Lithium
Mine life
50 years
Workforce
350 during operations. A mining services contract requires 220 employees to support the ramp-up of production.
Overview
The project is an integrated operation that includes a mine and concentrator at Mt Holland and a lithium hydroxide refinery in Kwinana.
Production
The mine and concentrator are designed to produce 380,000 tonnes of spodumene concentrate per year. This concentrate will be processed at the Kwinana refinery to produce approximately 50,000 tonnes of battery-quality lithium hydroxide annually. First ore was mined in December 2022, and the concentrator was commissioned in the second half of 2023. The first production of lithium hydroxide is expected in early 2025.
Processing
The project is an integrated operation that includes a mine and concentrator at Mt Holland and a lithium hydroxide refinery in Kwinana. The concentrator processes spodumene ore to produce spodumene concentrate. The processing plant includes primary and secondary crushing, a high-pressure grinding roller (HPGR), dense media separation (DMS), grinding and classification, magnetic separation, and froth flotation. The concentrator is designed to process approximately 2 million tonnes of ore per year.
Equipment
Mining operations are conducted by contractors. Thiess delivers drill and blast services, mining of overburden and ore, and equipment maintenance. Iron Mine Contracting provides drill, blast, load and haul, and run-of-mine management services. The operation will be serviced by contractor-owned and operated drill and blast, as well as load and haul equipment, including excavators and haul trucks.
Expansion
A feasibility study is underway to evaluate doubling the production capacity of the mine and concentrator. Covalent is seeking approval to expand the processing capacity from 2 to 4 million tonnes per annum (Mtpa).

Companies & Ownership (1)

Igrejinha Project

Minas Gerais, Brazil · Open Pit

Under Development
LithiumTinTantalumTungstenCobalt
Overview
The Igrejinha Project is an exploration and evaluation stage project in Minas Gerais, Brazil, within the 'Lithium Valley'. It targets lithium, caesium, tin, tantalum, and tungsten, hosted in LCT pegmatites. Perpetual Resources has an option to acquire up to 90% of the project.

Companies & Ownership (1)

Bullskin Stone & Lime LLC Quarry

Pennsylvania, United States · Underground

Operating
GoldSilverIron OreCoalDiamondsLithium+38
Workforce
25 (2019)
Overview
The Bullskin Stone & Lime LLC Quarry is an active underground mine located in Fayette County, Pennsylvania. The commodities produced are aggregates, specifically limestone.
Production
1,214,405 tons of limestone (2019)

Companies & Ownership (1)

Texas Lehigh Cement Company LP

Texas, United States · Processing Facility

Operating
CopperGoldSilverIron OreCoalDiamonds+39
Opened
1978-01-01
Workforce
51 to 200 employees
Overview
The original plant, located in Buda, Texas, began construction in December 1976 and was completed in June 1978.
Production
The Buda plant has an annual rated capacity of 1,300,000 short tons. A 2018 permit application for a new kiln proposed a clinker production rate of 1,314,000 short tons per year.
Processing
dry-process 4-stage preheater/pre-calciner kiln

Companies & Ownership (1)

Marble Bar Exploration Project

Western Australia, Australia · Open Pit

Under Development
GoldLithium
Overview
Early-stage exploration project in the Pilbara region of Western Australia, focused on gold, base metals, and lithium. Located approximately 150 kilometres south-east of Port Hedland and 20 kilometres north-east of the Marble Bar townsite.

Companies & Ownership (1)

Mt Holland Lithium Project

Western Australia, Australia · Open Pit

Operating
Lithium
Mine life
40 years
Workforce
350 during operations
Production
The mine and concentrator will produce 380,000 tonnes of spodumene concentrate per year, which will be refined into 50,000 tonnes of battery-quality lithium hydroxide annually. The first ore was mined in December 2022, and the concentrator was commissioned in the second half of 2023, and is now in a ramp-up phase. The Kwinana refinery is expected to deliver its first lithium hydroxide in early 2025. Wesfarmers' share of spodumene concentrate production for the 2024 financial year is expected to be approximately 50,000 tonnes.
Processing
The project consists of an open-cut mine and a concentrator. The processing circuit includes primary and secondary crushing, a coarse ore stockpile, tertiary crushing with a High Pressure Grinding Roller (HPGR), Dense Media Separation (DMS), grinding and classification, magnetic separation, froth flotation, and concentrate thickening and filtration. The spodumene concentrate will be transported to a refinery in Kwinana to be processed into battery-quality lithium hydroxide.
Expansion
Studies are being advanced to potentially expand the Mt Holland mine and concentrator. A feasibility study to evaluate doubling the production capacity of the mine and concentrator has been completed.

Companies & Ownership (1)

Bolt Cutter Gold and Lithium Project

Western Australia, Australia · Open Pit

Under Development
GoldLithiumTantalumCobalt
Overview
The Bolt Cutter Gold and Lithium Project, also known as Bolt Cutter Central, is an early-stage greenfields exploration project in the Pilbara region of Western Australia, approximately 10 kilometres west of Wildcat Resources' Tabba Tabba Lithium-Tantalum Project. Owned by Wildcat Resources Ltd, it is in the feasibility stage, focusing on exploration and resource definition. The project is considered a potential open-pit operation, primarily targeting lithium and tantalum from LCT pegmatite dykes, and is also prospective for gold.
Equipment
Reverse Circulation and Diamond drilling program
Expansion
Significant expansion is underway, with further RC drilling planned for the first quarter of 2026 to step out and infill the discovery area in preparation for a maiden Mineral Resource estimate. Diamond drilling is also planned to expand the scale of the discovery at depth and to facilitate metallurgical test work. The company is also progressing with environmental studies and plans to lodge a mining lease application. The Bolt Cutter project is seen as a potential satellite operation to the flagship Tabba Tabba project, with the potential to establish a major new lithium mining and processing operation in the Pilbara.

Companies & Ownership (1)

Lithium Research Center

Arizona, USA · Processing Facility

Operating
Lithium

Companies & Ownership (1)

Lordsburg Lithium Project

New Mexico, USA · Solution

Under Development
Lithium
Overview
The Lordsburg Lithium Project, operated by Arizona Lithium, is an early-stage exploration project located in the southwest corner of New Mexico, USA. The project consists of 291 Bureau of Land Management (BLM) claims covering approximately 25 square kilometres. It is situated within a playa lake system in the Animas Valley, about 15 kilometres southwest of the town of Lordsburg.

Companies & Ownership (1)

Prairie Lithium Project

Saskatchewan, Canada · Solution

Under Development
Lithium

Companies & Ownership (1)

Big Sandy Lithium Project

Arizona, USA · Open Pit

Under Development
Lithium
Mine life
20 years
Workforce
Previous operator estimates were for 800 jobs during construction and 200 jobs during operations.
Production
A 2019 drill program resulted in an estimated JORC-compliant resource of 32.5 million tonnes grading 1,850 parts per million lithium, for 320,800 tonnes of lithium carbonate equivalent.
Processing
The project plan involved shallow surface mining with continuous reclamation.
Expansion
Development currently suspended due to legal injunction; plan of operations withdrawn by Arizona Lithium in February 2025; project subsequently sold to NTEC on 4 August 2025.

Companies & Ownership (1)

Manono Lithium and Tin Project

Tanganyika Province, Democratic Republic of Congo · Open Pit

Under Development
LithiumTinTantalum
Mine life
20 years
Processing
The project is designed for a mining and processing capacity of 5 million tonnes of ore per annum. The processing plant will produce 500,000 tonnes of spodumene concentrate per year, which will be processed further in a smelter to produce 95,170 tonnes of crude lithium sulfate annually.
Equipment
primary jaw crusher, secondary cone crusher, and a high-pressure grinding rolls (HPGR) tertiary crusher
Expansion
Construction is underway, with the accommodation camp and the first phase of a solar farm already commissioned. The project also includes the rehabilitation of the Mpiana-Mwanga hydroelectric power station to supply power to the operation.

Companies & Ownership (1)

Lyons River Project

Western Australia, Australia · Open Pit

Under Development
LithiumTantalumScandium

Companies & Ownership (1)

Ti-Tree Project

Western Australia, Australia · Open Pit

Under Development
Lithium

Companies & Ownership (1)

Morrissey Hill Project

Western Australia, Australia · Open Pit

Under Development
Lithium

Companies & Ownership (1)

Camel Hill Project

Western Australia, Australia · Open Pit

Under Development
Lithium

Companies & Ownership (1)

Mortimer Hills

Western Australia, Australia · Open Pit

Under Development
Lithium

Companies & Ownership (1)