← Map view|Directory

Directory

Browse minesites, mining companies and suppliers. Use the tabs below to switch sections.

Minesites Directory

Browse minesites. Each card shows company ownership and their most recent associated articles.

Filter by mine details and commodity attributes.
Page 4 of 9 (211 total)
Kumina Iron Ore Project

Western Australia, Australia · Open Pit

Feasibility
Iron Ore
Overview
BCI Minerals Limited sold the Kumina Iron Ore Project to Mineral Resources Limited in October 2018. The project is located in the West Pilbara region of Western Australia, approximately 100km south of Karratha. Prior to the sale, BCI Minerals had identified the Kumina tenements as a large, under-explored tenement package and conducted exploration activities, including a Phase 1 drilling programme. A maiden JORC inferred mineral resource for the Kumina project was announced in June 2018, estimated at 78.3 million tonnes at 59.1% Fe.

Companies & Ownership (1)

Bungaroo South

Western Australia, Australia · Open Pit

Under Development
Iron Ore
Overview
Bungaroo South is an iron ore project located in the West Pilbara region of Western Australia, Australia. The project is owned and being progressed by Mineral Resources Limited (MRL), after being sold by BCI Minerals Limited in March 2020. BCI Minerals retains a 1% free on board revenue royalty on any iron ore mined from the Bungaroo South tenements and is entitled to potential deferred consideration payments.

Companies & Ownership (1)

Kumina

Western Australia, Australia · Open Pit

Feasibility
Iron Ore
Overview
The Kumina project, an iron ore asset, was owned by BCI Minerals and is located in the West Pilbara region of Western Australia, approximately 100 kilometres south of Karratha. BCI Minerals sold the Kumina Iron Ore Project to Mineral Resources Limited, with the deal announced in October 2018 and completed in December 2018.
Expansion
The exploration work aimed to increase the tonnage for the broader Buckland Project, which envisioned a 15 million tonnes per annum operation.

Companies & Ownership (1)

Bungaroo South

Western Australia, Australia · Open Pit

Feasibility
Iron Ore
Overview
Bungaroo South is an iron ore project located in the West Pilbara region of Western Australia, Australia. The project was part of the broader Buckland development project held by BCI Minerals.

Companies & Ownership (1)

Mariana

Minas Gerais, Brazil · Open Pit

Operating
Iron Ore

Companies & Ownership (1)

Minas Centrais

Minas Gerais, Brazil · Open Pit

Operating
Iron Ore

Companies & Ownership (1)

Itabira

Minas Gerais, Brazil · Open Pit

Operating
Iron Ore

Companies & Ownership (1)

Serra Sul

Pará, Brazil · Open Pit

Operating
Iron Ore

Companies & Ownership (1)

Serra Norte

Pará, Brazil · Open Pit

Operating
Iron Ore

Companies & Ownership (1)

Serra Leste

Pará, Brazil · Open Pit

Operating
Iron Ore

Companies & Ownership (1)

Paddys River quarry

New South Wales, Australia · Quarry

Operating
CoalIron Ore

Companies & Ownership (1)

Bringelly Quarry

New South Wales, Australia · Quarry

Operating
Soda AshKaolinCoalIron Ore
Opened
1968-01-01
Mine life
30 years
Overview
The Bringelly Brickworks and Quarry comprises an existing clay and shale quarry and brick manufacturing facility operating since 1968 at 60 Greendale Road, Bringelly, New South Wales. A new project, the Bringelly Quarry and Cumberland Plain Woodland Restoration Project, is a proposed State Significant Development at 203 Greendale Road, Bringelly. This new open-cut quarry will supply a long-term clay resource for Brickworks' Austral Bricks operations in Sydney and includes the restoration of 74 hectares of Cumberland Plain Woodland.
Production
The existing quarry has an approved extraction of 200,000 tonnes per year of clay and shale. The proposed new quarry plans for the extraction of up to 850,000 tonnes per annum of raw material, with an average rate of 750,000 tonnes per annum, over a 30-year quarry life, totalling approximately 23 million tonnes of raw material.
Processing
The existing Bringelly Brickworks includes a brick manufacturing facility. The proposed new quarry will have no processing on site.
Equipment
Material at the new quarry will be extracted by ripping and pushing, then transported by truck.
Expansion
A modification to the development consent was submitted in late 2022 by PGH Bricks & Pavers Pty Ltd for an increase in extraction and production at the existing brickworks. A new project, the Bringelly Quarry and Cumberland Plain Woodland Restoration Project, is also planned to provide a long-term clay resource for Brickworks' Austral Bricks operations in Sydney.

Companies & Ownership (1)

McPhee Creek Iron Ore Project

Western Australia, Australia · Open Pit

Under Development
Iron Ore
Mine life
15 years
Workforce
500 jobs during construction and 300 permanent operational roles; 145 people at peak operations.
Overview
The project involves mining from five open-cut pits. Ground has been broken and construction is underway as of late 2024, with first ore delivery expected in the 2025-26 financial year.
Production
Up to 14 million tonnes per annum (Mtpa) of ore; expected production rate between 9.5 and 9.7 Mtpa.
Processing
primary crushing plant; ore will be stockpiled before being hauled by road train to the Roy Hill mine for further processing and blending.
Equipment
conventional drill and blast, load, and haul methods; MACA awarded mining contract for load and haul; CSI Mining Services to supply and operate a 10 million tonne-per-year primary crushing plant.

Companies & Ownership (1)

Sanjiv Ridge

Western Australia, Australia · Open Pit

Operating
Iron Ore
Workforce
Planned expansion of accommodation village from 180 to 250 personnel.
Overview
Sanjiv Ridge, formerly Corunna Downs mine, is an operational iron ore mine owned and operated by Atlas Iron, a subsidiary of Hancock Prospecting. It is located in the Pilbara region of Western Australia, approximately 241 kilometres south-east of Port Hedland and 33 kilometres south of Marble Bar.
Production
Expected to produce 4 to 5 million tonnes per annum. Stage 2 aims to extract approximately 10 million tonnes of iron ore.
Processing
Crushing the ore on-site. Crushed ore is transported by road train to the Utah Point Bulk Commodities Berth at Port Hedland for export.
Equipment
CAT 785 trucks, D9 and D10 dozers, 16M graders, and Liebherr excavators. Haul trucks such as Hitachi (EH4000 & EH5000) and CAT (777 & 793F) models are also utilised. Supported by power generators and other ancillary equipment.
Expansion
Stage 2, approved in early 2026, is a satellite operation including three new pits (Glen Herring, Dazzler, and Hero) aiming to extract approximately 10 million tonnes of iron ore. Further expansions are planned, including mining below the water table. A four-kilometre haul road connects Stage 2 pits to existing Stage 1 infrastructure. Accommodation village planned to expand from 180 to 250 personnel.

Companies & Ownership (1)

Mt Dove

Western Australia, Australia · Open Pit

Closed
Iron Ore
End year
2014
Mine life
1.5 years
Overview
The Mt Dove mine was a small-scale, open-pit iron ore mine located in the Pilbara region of Western Australia, approximately 65 to 68 kilometres south of Port Hedland. The project, officially named the Mt Dove Direct Shipping Ore (DSO) Project, was operated by Atlas Iron Limited. The primary commodity was iron ore, and it was part of Atlas Iron's 'Horizon One' growth program.
Production
direct shipping ore reserves of 2.1 million tonnes at 58.1% Fe; 884,764 tonnes of iron ore mined in June quarter 2013.
Processing
on-site at a run-of-mine (ROM) facility, including four stockpiles with a total capacity of 310,000 tonnes. A single mobile crushing and screening plant produced an all-fine product through three crushing and two screening stages.
Equipment
mobile crushing and screening plant, haul trucks, ROM facility, four stockpiles, weighbridge, wastewater treatment plant
Expansion
part of Atlas Iron's 'Horizon One' growth program

Companies & Ownership (1)

Abydos

Western Australia, Australia · Open Pit

Closed
Iron Ore
Opened
2013-01-01
End year
2017
Workforce
150 permanent jobs
Overview
Abydos was an open pit iron ore mine wholly owned and operated by Atlas Iron, located in the Pilbara region of Western Australia, approximately 130 kilometres south of Port Hedland. The project is situated on the Abydos pastoral station.
Production
two to three million tonnes per annum
Processing
crushing and screening
Equipment
crushing and screening plant

Companies & Ownership (1)

Pardoo Mine

Western Australia, Australia · Open Pit

Closed
Iron Ore
End year
2013
Workforce
100 people
Overview
The Pardoo mine was an iron ore project wholly owned and operated by Atlas Iron. It is located in the Pilbara region of Western Australia, approximately 75 kilometres east of Port Hedland. The mine produced low-alumina haematite direct shipping ore (DSO).
Production
1.08 million tonnes in its first year of operation. In the 2011 financial year, the mine produced 1.72 million tonnes, which decreased to a planned 1.45 million tonnes in the 2012 financial year. At its peak, the mine was scheduled to produce 2.4 million tonnes of iron ore annually. The initial project proposal outlined an annual ore production target of 1.5 million tonnes.
Processing
crushing and screening the ore on-site
Equipment
Hitachi ZX330-LC-3 drill rigs, Komatsu PC1250 excavators, Komatsu 785-7 trucks, and Caterpillar D98 dozers

Companies & Ownership (1)

Sanjiv Ridge Stage 2

Western Australia, Australia · Open Pit

Operating
Iron Ore
Opened
2024-01-01
Mine life
4.5 years
Overview
Sanjiv Ridge Stage 2 is a satellite operation and a significant amendment to the existing Sanjiv Ridge Project (formerly Corunna Downs), considered Stage 1. It involves the development of three new pits (Glen Herring, Dazzler, and Hero) to mine the Glen Herring deposit, located west of Stage 1 operations. Ore is trucked to Stage 1 for processing.
Equipment
Haul Trucks: CAT 785D, CAT 785C dump trucks. Excavators: Komatsu 1250, Liebherr R9150 excavators. Support Equipment: CAT777D watercart, CAT 16M Grader, CAT D10T Dozer. Drills: Epiroc T45 Drill Rigs.
Expansion
Development of three new pits (Glen Herring, Dazzler, and Hero) to mine the Glen Herring deposit.

Companies & Ownership (1)

McPhee Creek

Western Australia, Australia · Open Pit

Under Development
Iron Ore

Companies & Ownership (1)

Miralga Creek

Western Australia, Australia · Open Pit

Operating
Iron Ore
Opened
2022-01-01
End year
2027
Mine life
5 years
Workforce
Expected to create around 300 jobs; MACA mobilised a workforce of 45.
Overview
Miralga Creek is an active open-pit iron ore mine operated by Atlas Iron. Located in the Pilbara region of Western Australia, approximately 100 kilometres south-east of Port Hedland. It consists of five satellite open pits: Miralga East, Miralga West, and Sandtrax.
Production
Production capacity of approximately 2 Mtpa, designed to extract about 8 million tonnes of iron ore over its lifespan.
Processing
On-site crushing and screening to produce lump and fines products for direct export without beneficiation.
Equipment
MACA's fleet includes excavators, trucks, drills, and support equipment. The processing facility has a grizzly feeder, primary jaw crusher, secondary cone crusher, triple-deck vibrating screen, two radial stackers, two cross belt samplers, weightometers, and a metal detection system.

Companies & Ownership (1)

Sanjiv Ridge (formerly Corunna Downs)

Western Australia, Australia · Open Pit

Operating
Iron Ore

Companies & Ownership (1)

Mt Webber

Western Australia, Australia · Open Pit

Operating
Iron Ore
Opened
2014-01-01
End year
2024
Mine life
18 years
Workforce
approximately 80 personnel (average project workforce from July 2022 to end of 2024)
Overview
Mt Webber is an active open-pit iron ore mine located in the Pilbara region of Western Australia, approximately 230 kilometres south-southeast of Port Hedland. It consists of several deposits, including Ibanez, Fender, Gibson, and Daltons.
Production
Initial targeted production rate of 3 million tonnes per annum (Mtpa), with plans to expand to 6 Mtpa.
Processing
crushing and screening circuit, including a new ore handling plant, a new crushing plant (1,000 tonnes per hour capacity), a three-stage crushing and screening circuit, a sampling station, and two radial stackers.
Equipment
conventional open-pit mining equipment (drilling, blasting, loading, hauling)
Expansion
initial development targeted 3 million tonnes per annum (Mtpa) production, with plans to expand to 6 Mtpa.

Companies & Ownership (1)

Tucumã Operation

Pará State, Brazil · Open Pit

Operating
CopperGoldIron Ore
End year
2033
Mine life
12 years
Workforce
approximately 2,220 people (construction phase); over 90% of operational staff hired by June 2024
Overview
The Tucumã Operation, formerly known as the Boa Esperança Project, is an open-pit mine located in Pará State, Brazil, within the Carajás Mineral Province. The primary commodity is copper, and the deposit is an iron oxide copper gold (IOCG) type.
Production
mill designed to treat 4.0 million tonnes of ore annually. In 2024, 5,156 tonnes of copper in concentrate produced. In 2025, 28,272 tonnes of copper in concentrate produced. Production guidance for 2026 is between 32,500 and 37,500 tonnes of copper in concentrate.
Processing
conventional three-stage crushing circuit with primary, secondary, and tertiary crushers, a ball mill for comminution, and flotation to produce a high-grade copper concentrate
Equipment
backhoe configured excavator and 38-tonne conventional trucks

Companies & Ownership (1)

Red Canyon Quarry

Colorado, United States · Quarry

Operating
GoldSilverIron OreCoalDiamondsLithium+38
Overview
The Red Canyon Quarry produces a range of construction aggregates. Materials from the quarry are utilised as aggregate for asphalt and concrete, rip-rap, aggregate base, decorative rock, and baseball field infield mix.
Processing
drill and shoot
Expansion
Martin Marietta acquired the Red Canyon Quarry in February 2016 through the acquisition of Colorado Springs-based Rocky Mountain Materials & Asphalt and Rocky Mountain Premix.

Companies & Ownership (1)

Page 4 of 9 (211 total)