← Map view|Directory

Directory

Browse minesites, mining companies and suppliers. Use the tabs below to switch sections.

Minesites Directory

Browse minesites. Each card shows company ownership and their most recent associated articles.

Filter by mine details and commodity attributes.
Page 54 of 59 (1395 total)
Macassa mine

Ontario, Canada · Underground

Operating
GoldSilver
Opened
1933-01-01
Workforce
over 1,000 direct jobs
Overview
The Macassa mine is an operational underground gold mine located in Kirkland Lake, northeastern Ontario, Canada. It is 100% owned and operated by Agnico Eagle Mines Limited. The primary commodity is gold, with silver as a by-product. The mine celebrated its 90th anniversary in 2023 and poured its six millionth ounce of gold.
Production
In 2025, production was 312,729 ounces of gold. Guidance for 2026 is a mid-point of 315,000 ounces of gold. As of December 31, 2025, proven and probable gold mineral reserves were 2.2 million ounces of gold.
Processing
conventional crushing, grinding, gravity, cyanidation, and carbon-in-pulp processes with Zadra recovery. Concentrate is melted in an induction furnace to produce doré bars (70-85% gold, 5-10% silver). Mill expansion project includes a new crushing plant, ore storage, a new grinding circuit, and additional leach tanks.
Equipment
battery-electric vehicles (BEVs) underground, five 50-tonne Artisan Z50 battery-powered haul trucks, two Artisan A10 10-tonne loaders, two Artisan Z40 haul trucks, 22 battery-powered LHDs from Epiroc and Artisan, six 20-tonne haul trucks, two production drills, No. 4 Shaft
Companies & ownership
  • Agnico Eagle Mines Limited
    TSX:AEM · NYSE:AEM
Macraes Goldfield

Otago, New Zealand · Underground

Operating
Gold
Opened
2023-12-31
End year
2038
Mine life
15 years
Workforce
~1,400
Overview
Large gold mining complex operated by OceanaGold.
Production
Ongoing gold production
Processing
Crushing, grinding, flotation, CIL
Equipment
Open pit fleet (2024/2025/2026/2027): Excavators – Komatsu PC2000 2/2/2/2; Drill – Montabert CPA 3/2/2/0; Dozer – CAT D10T 2/2/2/2; Grader – CAT 16M 1/1/1/1; Truck – CAT 773E 2/2/1/0; Truck – CAT 785C 6/6/4/3; Truck – CAT 785D 0/0/4/4; Water Cart – Bell B40E 1/1/1/1; Water Cart – CAT 777G 0/0/0/2; Wheel Loader – CAT 992K 1/1/1/1. Underground fleet (2024/2025/2026/2027): Drills – Sandvik DD420/DD421 4/4/1/1; Drills – Tamrock Solo7 2/1/0/0; Long Hole Drill – Sandvik DL432 2/2/1/1; Truck – Sandvik TH550 0/0/4/0; Truck – Sandvik TH551 4/4/0/0; LHD – Sandvik LH517 5/6/3/3; LHD – Caterpillar R2900 5/4/0/0; LHD – Caterpillar R1700 2/2/0/0; Grader – Caterpillar 12H 1/1/1/1; Telehandler – Skyjack VR1056D 2/2/1/1.
Madsen Gold Project

Ontario, Canada · Underground

Feasibility
Gold
Opened
2025-02-18
End year
2037
Mine life
12 years
Workforce
~500 (planned)
Overview
High-grade underground gold project with updated PFS.
Production
Planned
Processing
Crushing, grinding, gravity, CIL
Equipment
As of Mar 31, 2025 / Steady-state 2026+: 2 Boom Jumbo – Sandvik DD421-60C (Diesel/Electric) 3/3; 1 Boom Jumbo – Sandvik DD311-40 (Diesel) 1/4; 2 or 3 Boom Longtom – Sandvik DL421 (Pneumatic) 0/2; 3 Boom Longtom – Epiroc Boomer 282 (Pneumatic) 2/1; 3 Boom Longtom – Epiroc Boomer 342 (Pneumatic) 1/0; Mechanical Bolter – Sandvik DS411 (Diesel/Electric) 0/5; 14-t Dev LHD – Epiroc MT65 (Diesel) 1/1; 10-t Dev/Prod LHD – Sandvik LH517 (Diesel/Electric) 4/6; 7-t Dev/Prod LHD – Sandvik LH307 (Diesel/Electric) 2/5; 40-t Truck – Sandvik TH550 (Diesel/Electric) 2/2; 30-t Truck – Sandvik TH545 (Diesel) 3/3; 20-t Truck – Sandvik TH540 (Diesel) 1/1; Production Drill (Manual Top Hammer) – Epiroc Simba E7C (Diesel) 3/3; Production Drill (Mechanized Top Hammer) – Epiroc Simba S7C (Electric) 0/1; LHD with Forks (14t) – Epiroc MT65 (Diesel) 1/1; Scissor Lift – Power Climber Falcon 1200 5/5; ANFO Loader (Development) – Epiroc Charmec MC605 (Diesel) 2/2; Boom Truck – Oshkosh S-series 2/2; UG Grader – CAT 160M 1/1; Telehandler – Manitou MHT 790 1/1; Remote Spray Arm (Pneumatic) – Putzmeister H205 1/1; Dry Shotcrete Machine – Putzmeister SP20 2/2; Personnel Carrier – Ford Econoline 4/4; UG Tractor – John Deere 150D 2/2; Service Vehicle – MS9 Truck 2/2; Light Vehicles – Pickup trucks 10/10; Total 56/70.
Magino mine

Ontario, Canada · Open Pit

Operating
GoldSilver
End year
2041
Mine life
20 years
Workforce
Approximately 350 positions (as of Feb 2022 technical report)
Overview
Active open-pit gold and silver mine in Algoma District, Ontario, Canada, 83 km northeast of Wawa. Part of Alamos Gold Inc.'s Island Gold District.
Production
Initially designed for 10,000 tpd throughput, permitted for 35,000 tpd. Q4 2025 open pit mined 14,973 tpd ore; mill processed 8,099 tpd.
Processing
Primary crushing, single-stage semi-autogenous grinding (SAG), gravity recovery circuit, cyanide leach, and carbon-in-pulp adsorption circuit.
Equipment
truck and shovel/loader operations
Expansion
Plans to expand the mill to 20,000 tonnes per day, including construction of a parallel circuit.
Companies & ownership
  • Alamos Gold Inc.
    TSX:AGI · NYSE:AGI
Major mine mobile fleet (Table 1-11, “mine equipment fleet by year”): hydraulic shovels (up to 4); front end loaders (up to 2); 250-ton haul trucks (up to 60); blasthole drills (up to 6); D10T track dozers (up to 7); 834K wheel dozers (up to 5); 16M motor graders (up to 5); 777G water trucks (up to 5); 988K FEL (1); 374 excavator (1); CS78 compactor (1)

Arizona, USA · Open Pit

Feasibility
CopperGoldSilver
Opened
2022-05-01
Overview
Large copper development project incorporating multiple porphyry deposits; PEA-level study.
Production
Planned Cu production
Processing
Crushing, grinding, flotation
Equipment
Major mine mobile fleet (Table 1-11, “mine equipment fleet by year”): hydraulic shovels (up to 4); front end loaders (up to 2); 250-ton haul trucks (up to 60); blasthole drills (up to 6); D10T track dozers (up to 7); 834K wheel dozers (up to 5); 16M motor graders (up to 5); 777G water trucks (up to 5); 988K FEL (1); 374 excavator (1); CS78 compactor (1)
Marathon Palladium Project

Ontario, Canada · Open Pit

Feasibility
CopperGoldPalladiumPlatinum
Opened
2021-03-03
End year
2037
Mine life
13 years
Workforce
~700 (planned)
Overview
Large PGM-copper project with Feasibility Study completed.
Production
Planned
Processing
Crushing, grinding, flotation
Equipment
Mining Haul Truck (240 t); Diesel Hydraulic Shovel (34 m³); Wheel Loader (17 m³); Production Drill (311 mm); Production Drill (160 mm); Blaster (44 mm); Track Dozer (651 kW); Grader (18’); Wheel Loader (11 m³); Wheel Loader (5 m³); Excavator (49 t); Excavator (55 t); Pick-up Truck; Pick-up Truck Crew Cab; Pick-up Truck Service Body; Service Truck (9 t); Service Truck (19 t); Tire Handler; Cube Van; Lube Truck (18,000 L); Lube Truck (6,000 L); Water Truck (40,000 L); Water Truck (14,000 L); Loader (3 m³); Grader (14’); Bus (60 passenger); Bus (20 passenger).
Marban Gold Project

Québec, Canada · Open Pit

Feasibility
Gold
Opened
2023-10-07
End year
2039
Mine life
15 years
Workforce
~600 (planned)
Overview
Advanced-stage open-pit gold project with PFS-level mine plan.
Production
Planned
Processing
Crushing, grinding, gravity, CIL
Equipment
Production Drill (6⅝") 4; Auxiliary Drill (Pre-Split) 1; Electric Hydraulic Shovel 3; Diesel Hydraulic Excavator 1; Wheel Loader 1; Mining Haul Truck (150 t) 16; Mining Haul Truck (100 t) 6; Track Dozer 8; Motor Grader 2; Water/Sand Truck 1; Wheel Dozer 1.
Mayfair Gold Project

Ontario, Canada · Open Pit

Under Development
Gold
Opened
2023-07-26
Overview
Orogenic gold project with updated NI 43-101 resource.
Processing
Metallurgical testwork
Equipment
Conceptual OP fleet
McIlvenna Bay Project

Saskatchewan, Canada · Underground

Under Development
CopperZincGoldSilver
Commodities, grades and output
YearCommodityAv. GradeOutput
2025Copper1.19 %-
2025Zinc2.18 %-
2025Gold0.41 g/t-
2025Silver14 g/t-
Opened
2025-03-12
End year
2040
Mine life
14 years
Workforce
As of September 2025, there were 800 people on site (167 Foran employees and 633 contractors). In October 2025, the workforce was approximately 803.
Overview
The project is advancing through construction and is entering the commissioning phase, with commercial production anticipated by mid-2026. The project is a copper-zinc-gold-silver rich volcanogenic-hosted massive sulphide (VHMS) deposit.
Production
The facility will produce copper and zinc concentrates, which will also contain gold and silver. A surface ore stockpile is being established ahead of the plant start-up, with approximately 236,000 tonnes stockpiled as of the end of January 2026. The first production stope blast occurred in January 2026.
Processing
The processing plant will use crushing, grinding (including semi-autogenous (SAG) and ball milling), and conventional flotation to produce the concentrates.
Equipment
The mine is being designed to use a fleet of underground battery-electric vehicles (BEVs) to reduce emissions and improve the working environment. The second longhole drill was commissioned in early 2026.
Power sources
HydroelectricGrid
Companies & ownership
  • Foran Mining Corporation
    TSX:FOM
Meadowbank Gold Complex (incl. Amaruq)

Nunavut, Canada · Open Pit

Operating
Gold
Opened
2017-12-31
End year
2032
Mine life
15 years
Workforce
~1,100
Overview
Large operating gold complex; report details capital and operating costs but does not restate initial project CAPEX.
Production
Ongoing
Processing
Crushing, grinding, gravity, CIL
Equipment
165-mm (6.5") blasthole drill x6–10; 244-mm (9.6") in-pit drill x2; 200-mm (7.9") in-pit drill x2; 12.5-m3 electric shovel x2; 11.5-m3 diesel shovel x2; 6-m3 backhoe x1; 11-m3 backhoe x2; 150-tonne haulage truck x9–14; 100-tonne haulage truck x4–10; 100-tonne low-profile articulated truck x0–2; 19-tonne loader x0–3; 12-tonne loader x0–2; 72-tonne dozer x2–3; 60-tonne dozer x2; 46-tonne dozer x2; 31-tonne grader x1–2; 7.6-m3 wheel loader x2; 5.7-m3 wheel loader x1–2; 130-mm (5.1") in-pit drill x2; 165-mm (6.5") in-pit drill x1; 77-tonne excavator x1; 4.9-m3 front-end loader x1; 4-m3 front-end loader x1; 31-tonne excavator x2–3; 16-tonne excavator x1; 12-tonne excavator x0–1; 6.7-m3 backhoe x0–1; 2.3-m3 backhoe x1
Meliadine Gold Project

Nunavut, Canada · Underground

Under Development
Gold
Opened
2015-02-11
End year
2032
Mine life
15 years
Workforce
~1,100 (planned)
Overview
FS-level project at time of report with reserves and capital estimates stated.
Production
Planned
Processing
Crushing, grinding, gravity, CIL
Equipment
Open pit fleet (peak): Haulage truck (65-t class) x6; Front-end loader (11 m³) x3; Hydraulic excavator (10 m³) x2; Hydraulic excavator (15 m³) x1; Dozer (D10 class) x2; Dozer (D8 class) x2; Motor grader (16G class) x2; Drill x2; Rock breaker x1; Crane (60 t) x1; Crane (30 t) x1; Water tanker (50,000 L) x2; Water tanker (25,000 L) x2; Fuel/lube truck (11,500 L) x1; Picker truck (15 t) x1; Telehandler (6 t) x1; Telehandler (10 t) x1; Front end loader (5 m³) x2; 4x4 pickup truck (250) x16; Lowboy carrier (100 t) x1; Dewatering pumps x4; Pit busses x2; Light tower x6 (TOTAL 57); Underground fleet: Truck (60 t) x8; Scooptram (10 t) x5; Jumbo x4; Bolter x2; Auxiliary: Shotcrete sprayer x1; ANFO loader x1; Grout plant x1; Work platform x3; Lube truck x1; Platform truck x2; Fork lift x2; Skid steer x1 (TOTAL 34).
Minto Mine South Project

Ontario, Canada · Open Pit

Under Development
Gold
Opened
2018-12-31
Overview
Gold exploration property near Wawa; initial NI 43-101 resource-stage report.
Equipment
Drilling & sampling equipment. handheld GPS; active Rouiller Drilling rig; field portable XRF; magnet; 10% HCl; nail scratch test
Moose River Consolidated Mine

Nova Scotia, Canada · Open Pit

Operating
Gold
Opened
2019-03-25
End year
2033
Mine life
14 years
Workforce
~600
Overview
Multi-pit open-pit gold operation including Touquoy and Beaver Dam deposits.
Production
Active gold production
Processing
Crushing, grinding, CIL
Equipment
Grade control drilling: diesel hydraulic RC drills (144 mm / 5.5” holes); production drilling: diesel hydraulic down-the-hole (DTH) drills (144 mm / 5.5” holes); loading: hydraulic excavators (5.0 m³ bucket) and front-end wheel loaders (7.0 m³ bucket); hauling/support fleet (Touquoy / Beaver Dam / Fifteen Mile Stream / Cochrane Hill): rigid frame haul truck (64 t payload) 5/11/9/13; articulated haul truck (41 t payload) 2/2/2/2; motor grader (4.9 m blade) 1/1/1/1; water/gravel truck 2/2/2/2; track dozer (325 kW) 0/0/2/3; track dozer (233 kW) 3/5/2/2; motor grader (4.3 m blade) 1/1/1/1; water truck (40 m³) 2/2/2/2; wheel loader (4.5 m³) 1/1/1/1; hydraulic excavator (3.0 m³) utility excavator/rock breaker 1/2/2/1; fuel & lube truck 1/2/1/1; shuttle bus 2/2/2/2; pickup trucks (1/4 ton) 8/8/8/8; light plants (20 kW) 9/9/9/9; water pumps (150 m³/h) 2/2/2/2; on-highway dump truck 1/1/1/1; soil compactor (117 kW) 1/1/1/1; emergency response vehicle 1/1/1/1; side-by-side ATV 2/2/2/2; maintenance trucks 1/1/1/1; mobile crane (36 t) 1/1/1/1; float trailer (55 ton) 1/1/1/1; forklift (3 t) 1/1/1/1; mobile steam cleaner 1/1/1/1
Moss Gold & East Coldstream Deposits (Moss Project)

Ontario, Canada · Open Pit

Under Development
Gold
Opened
2023-06-01
Overview
Project centre coordinates provided in UTM (Zone 15): Moss Deposit 668,860E / 5,379,100N.
Equipment
Drilling: report notes periods where Goldshore had seven drill rigs active on the project (for drilling).
Mount Milligan Mine

British Columbia, Canada · Open Pit

Operating
CopperGold
End year
2035
Mine life
22 years
Workforce
Approximately 650 people (end of 2024); supports over 1,000 ongoing jobs (January 2026)
Overview
The Mount Milligan Mine is located in the Omenica Mining Division in North Central British Columbia, Canada, approximately 155 kilometres northwest of Prince George. It is an operating conventional truck-shovel open-pit copper and gold mine.
Production
In 2023, the mine produced 61.9 million pounds of copper and 350,317 ounces of gold. For the full year 2025, the mine produced 147,581 ounces of gold and 50.5 million pounds of copper. In the fourth quarter of 2025, production was 44,105 ounces of gold and 13.0 million pounds of copper.
Processing
Ore is processed through a primary gyratory crusher and a secondary cone crusher, then conveyed to a SAG mill and a ball mill for grinding, creating a slurry. This slurry is piped to flotation cells to float a copper-gold concentrate. A gravity circuit removes coarse gold before the concentrate goes to a thickener and then a pressure filter. Permitted to operate at an average of 60,000 tonnes per day.
Equipment
conventional truck-shovel
Expansion
Received amended environmental assessment and related permits to extend operations to 2035. A Pre-Feasibility Study has outlined a potential mine life extension to 2045. Approvals granted for a 10% expansion in plant throughput, set to begin in 2028.
Companies & ownership
  • Centerra Gold Inc.
    TSX:CG · NYSE:CGAU
Mount Polley Mine

British Columbia, Canada · Open Pit

Operating
CopperGoldSilver
Opened
1997-01-01
End year
2033
Workforce
As of July 2024, the mine had 343 employees. A community update in the second quarter of 2022 stated the mine would employ approximately 355 people for full-scale operations.
Overview
The mill first commenced operations in 1997. After being placed on care and maintenance in 2019, operations at Mount Polley recommenced in July 2022. In August 2025, the British Columbia government approved a permit for an expansion involving the deepening of the Springer pit and the enlargement of rock-disposal areas. This expansion extends the mine's life to 2033. Mining of the Phase 4 pushback in the Springer Pit was scheduled for completion in February 2026, with the majority of mill feed for 2026 planned to come from the Phase 5 pushback and low-grade stockpiles.
Production
In 2025, the mine produced 30.715 million pounds of copper and 37,555 ounces of gold. This compares to 35.700 million pounds of copper and 39,108 ounces of gold in 2024. The production target for 2026 is 19.0-21.0 million pounds of copper and 40,000-44,000 ounces of gold.
Processing
Ore from the open pits and underground is hauled to a crusher. The processing plant uses crushing, grinding and flotation to produce a concentrate. The concentrate is dewatered using thickeners and pressure filters before being stored for transport. Most of the concentrate is trucked to the Port of Vancouver for transport to smelters in Asia.
Equipment
The mine recently purchased two new Komatsu D375A-8 crawler dozers. The fleet also includes other Komatsu equipment such as D375A-6 crawler dozers, PC3000 and PC4000 series mining excavators, D85PX-18 crawler dozers, and PC400 series excavators.
Expansion
In August 2025, the British Columbia government approved a permit for an expansion involving the deepening of the Springer pit and the enlargement of rock-disposal areas. This expansion extends the mine's life to 2033. Mining of the Phase 4 pushback in the Springer Pit was scheduled for completion in February 2026, with the majority of mill feed for 2026 planned to come from the Phase 5 pushback and low-grade stockpiles.
Companies & ownership
  • Imperial Metals Corporation
    TSX:III
MPD Copper-Gold Project

British Columbia, Canada · Open Pit

Under Development
CopperGold
Opened
2025-08-12
Overview
Copper-gold project with initial mineral resource (multiple zones).
Production
(resource stage)
Processing
Conceptual crushing, grinding, flotation
Equipment
Conceptual open-pit fleet
Musselwhite Mine

Ontario, Canada · Underground

Operating
Gold
Opened
1997-01-01
End year
2031
Mine life
7 years
Workforce
a little over 600 employees
Overview
Orla Mining Ltd. completed its acquisition of the Musselwhite Mine from Newmont Corporation in the first quarter of 2025. The fly-in, fly-out underground operation has been in production since 1997. Orla is pursuing an aggressive exploration program to extend the mine's life beyond its current reserves and is also focused on optimizing the operation.
Production
In 2025, from the acquisition date of March 1, Musselwhite produced 203,856 ounces of gold. Total production for the full year 2025, including the period under Newmont's ownership, was 236,908 ounces. The production guidance for 2026 is between 230,000 and 240,000 ounces of gold.
Processing
The processing method involves two-stage crushing, grinding, leaching with a cyanide-in-pulp circuit, and the production of doré bars. In the fourth quarter of 2025, the mill processed 361,407 tonnes of ore at a head grade of 6.77 g/t gold with a recovery rate of 95.7%.
Equipment
Orla Mining is investing in a newer, lower-emission fleet and additional mining and support equipment to improve productivity and reduce ventilation constraints. The company is also expanding its use of tele-remote and autonomous technologies. A 2026 budget includes $30 million for additional mining and mining support equipment.
Expansion
Orla is pursuing an aggressive exploration program to extend the mine's life beyond its current reserves and is also focused on optimizing the operation.
Companies & ownership
  • Orla Mining Ltd.
    TSX:OLA · NYSE:ORLA
Nalunaq Project

Greenland, Greenland · Underground

Under Development
Gold
Opened
2022-09-03
Overview
High-grade orogenic gold deposit with updated NI 43-101 mineral resource.
Equipment
Conceptual underground equipment
New Afton Mine

British Columbia, Canada · Block Cave

Operating
GoldCopperSilver
Companies & ownership
  • New Gold Inc.
    TSX:NGD
New Polaris Gold Project

British Columbia, Canada · Underground

Feasibility
Gold
Opened
2025-07-21
Mine life
8 years
Workforce
161
Overview
Feasibility Study stage underground gold project, owned 100% by Canagold.
Production
Ore production begins Year 1 and continues to Year 9 (relative schedule).
Processing
Crushing/grinding with flotation; BIOX excluded and concentrates intended for sale.
Equipment
Underground Mobile Fleet (Max onsite): 5 trucks; 8 scoops/LHDs; 1 longhole drill; 2 jumbos; 2 bolters; 2 shotcrete sprayers; plus support units (fuel truck, scaler, graders, etc.).
Pinos Altos

Chihuahua, Mexico · Sublevel Stoping

Operating
GoldSilver
Opened
2009-01-01
End year
2028
Mine life
19 years
Workforce
approximately 1,200 employees (2017)
Production
81,734 ounces of gold (2025 guidance), 75,000 ounces of gold (2026 mid-point guidance)
Processing
conventional processing plant (5,500 tonnes per day) with crushing, grinding, gravity concentration, agitated leaching, counter-current decantation; heap-leaching for lower-grade ore; Merrill-Crowe method for gold and silver recovery; on-site refinery for gold and silver doré bars
Equipment
Sandvik DL411, Sandvik rock bolters and cable bolters, Schwing Bioset KSP 140 pump, KSP 220 piston pump, shovels and trucks
Companies & ownership
  • Agnico Eagle Mines Limited
    TSX:AEM · NYSE:AEM
Point Rousse Project

Newfoundland & Labrador, Canada · Open Pit

Operating
Gold
Opened
2021-09-01
End year
2026
Mine life
5 years
Workforce
~250
Production
Intermittent gold production
Processing
Crushing, grinding, gravity, CIL
Equipment
1× 670 GLC Hitachi excavator; 5× 410E JD rock trucks (38 t); 2× Bell 40E trucks (38 t); 1× CAT 740 truck (38 t); 3× 400 JD rock trucks (29 cu yds); 1× 750J JD dozer; 2× CAT 349 excavators (4.1 cu yds); 1× CAT 323 excavator (1.56 cu yds); 1× CAT D6 dozer; 2× rock breakers; 1× 470 GLC JD excavator (3.1 cu yds); 1× 350 JD excavator (1.9 cu yds); 5–7× double tandem trucks (27 t); drills: 2× Sandvik Ranger 900; 1× Atlas Copco ECM-590; 2× Sandvik Ranger 800.
Point Rousse Project (Pine Cove, Stog’er Tight, Argyle)

Newfoundland and Labrador, Canada · Open Pit

Operating
Gold
Opened
2022-09-30
End year
2023
Workforce
75–90
Overview
Gold operation in the Baie Verte Mining District (NL) with a central processing facility at the Pine Cove Mill.
Production
Commercial production since 2010-09-01; ~12,000–19,000 oz Au/year (typical).
Processing
Pine Cove Mill: concentrator/flotation circuit + Merrill-Crowe gold recovery.
Page 54 of 59 (1395 total)