← Map view|Directory

Directory

Browse minesites, mining companies and suppliers. Use the tabs below to switch sections.

Minesites Directory

Browse minesites. Each card shows company ownership and their most recent associated articles.

Filter by mine details and commodity attributes.
Page 53 of 59 (1395 total)
Chelopech Mine

Sofia Province, Bulgaria · Underground

Operating
CopperGold
Companies & ownership
  • DPM Metals Inc.
    ASX:DPM
Côté Gold Mine

Ontario, Canada · Open Pit

Operating
Gold
End year
2042
Mine life
18 years
Workforce
over 600 full-time jobs
Overview
Côté Gold Mine is an active open-pit mine located in the Chester and Yeo Townships, District of Sudbury, in northeastern Ontario, Canada. It is situated approximately 25 kilometres southwest of Gogama, 125 kilometres southwest of Timmins, and 175 kilometres northwest of Sudbury.
Production
2024 Production: The mine produced 199,000 ounces of gold on a 100% basis in its first nine months of operation. 2025 Production: Full-year 2025 production was 399,800 ounces of gold on a 100% basis, achieving the top end of guidance. 2026 Production Guidance: Production for 2026 is forecast to be between 390,000 and 440,000 ounces of gold on a 100% basis. Life of Mine Production: Over its expected 18-year mine life, the operation is projected to produce an average of 365,000 ounces of gold annually. For the first six years, the average annual production is expected to be 495,000 ounces.
Processing
The processing plant has a nameplate capacity of 36,000 tonnes per day, which it has successfully achieved. The process includes primary and secondary crushing, high-pressure grinding rolls (HPGR), gravity concentration, and whole-ore leaching, followed by gold recovery using a carbon-in-pulp circuit.
Equipment
The operation utilizes an autonomous fleet of haul trucks and drills. As of the fourth quarter of 2024, the haulage fleet included 21 commissioned CAT 793 autonomous haul trucks. The loading fleet includes CAT 6060 electric shovels and CAT 994 front-end loaders.
Expansion
The company is focused on stabilization and optimization of the plant. There is significant growth potential from the adjacent Gosselin zone, which is being incorporated into an updated mine plan.
Companies & ownership
  • IAMGOLD Corporation
    TSX:IMG · NYSE:IAG
  • Royal Gold, Inc.
    NYSE:RGLD
Dome Mountain Mine

British Columbia, Canada · Open Pit

Operating
CopperGold
Opened
2023-12-05
End year
2043
Mine life
21 years
Overview
Long-life open-pit copper-gold operation south of Princeton with stabilization and optimization mine plan post-acquisition.
Production
Avg. Cu ~46,500 tpa (first 5 yrs)
Processing
Crushing, grinding, flotation
Equipment
Mine stabilization equipment mentions only: remobilizing idle haul trucks with fleet ramp-up from 14 to 26 trucks (23 ramped up at time of release); trolley assist haulage; new electric shovel; evaluating trolley-assist haul trucks vs conveying systems for ore/waste movement.
Duncan Kerr Property

Ontario, Canada · Open Pit

Under Development
Gold
Opened
2013-03-22
Overview
Early-stage gold exploration property in the Larder Lake district.
Equipment
Diamond drilling (2,000–3,000 m programs); drill core re-logging (diamond drill holes DK12-02, DK12-04, DK12-07, DK12-08); trenching (recent trenching reviewed); diamond saw rental.
Eskay Creek Project

British Columbia, Canada · Open Pit

Under Development
GoldSilver
Opened
2022-09-06
End year
2039
Mine life
12 years
Workforce
~500 (planned)
Overview
A past-producing mine being redeveloped as a conventional truck and shovel open-pit operation. The project is fully permitted and under construction. Skeena Resources acquired 100% ownership of the project from Barrick Gold in 2020. A Definitive Feasibility Study was completed in November 2023. The project is located in the Golden Triangle region of northwestern British Columbia, within the territory of the Tahltan Nation.
Production
Initial production and cash flow are anticipated in the second quarter of 2027. The mine is projected to produce an average of 260,000 ounces of gold and 7.65 million ounces of silver annually. Other estimates project between 0.20 and 0.25 million ounces of gold and between 5.5 and 7.0 million ounces of silver annually. The processing plant will have the capacity for up to 3.6 million tonnes of ore per year.
Processing
The project will utilise a simplified flowsheet with metallurgical optimisation to produce a gold-silver concentrate on-site. This concentrate will be transported to third-party smelters.
Equipment
Conventional truck and shovel open-pit operation.
Companies & ownership
  • Skeena Resources Limited
    TSX:SKE · NYSE:SKE
Fenelon Gold Project

Québec, Canada · Underground

Feasibility
Gold
Opened
2025-03-21
End year
2043
Mine life
16 years
Workforce
~700 (planned)
Overview
Advanced underground gold project with 2025 PEA update by Wallbridge.
Production
Planned gold production
Processing
Crushing, grinding, gravity, cyanidation
Equipment
Underground personnel vehicles (pickups, vans, buses); tractors; graders; snow plows; manlifts; fuel truck; service truck; water truck; forklift; crane; ice-maker.
Fosterville Gold Mine

Victoria, Australia · Underground

Operating
Gold
Opened
2018-12-31
End year
2029
Mine life
10 years
Workforce
~800
Overview
Ultra-high-grade underground orogenic gold mine operated by Kirkland Lake Gold.
Production
Ongoing gold production
Processing
Crushing, grinding, gravity, flotation, CIL
Equipment
Development—(Sandvik) twin boom jumbos (2), mac bolt (2), LHD (2), trucks (2); Production—(Sandvik) longhole drill (2), LHD (3), trucks (3); Contractor fleet—twin boom jumbos (2), longhole drills (2), LHDs (4), trucks (3), mac bolt (2).
Fox Complex

Ontario, Canada · Underground

Operating
GoldSilver
Opened
2021-09-19
Workforce
Recent reports indicate the Fox Complex has faced workforce constraints and has been accelerating hiring efforts and engaging contractors to support operations.
Overview
The Fox Complex, located in the Timmins Gold Mining Camp, consists of the producing Froome underground mine, the Black Fox mine (on care and maintenance), the Stock Mill, and the advanced-stage Grey Fox and Stock development projects. Production from the Froome mine is being transitioned to the Stock mine, which is expected to begin initial production by mid-2026 and achieve commercial production in 2027. The development of the Grey Fox project is also a key part of the company's plan to increase production.
Production
Gold equivalent ounce production from the Fox Complex was 44,450 ounces in 2023 and 30,151 ounces in 2024. For 2025, 23,187 gold equivalent ounces were produced. Production guidance for 2026 is forecast to be between 16,000 and 19,000 gold equivalent ounces. McEwen Mining is targeting a significant production increase at the Fox Complex to between 105,000 and 120,000 gold equivalent ounces by 2030. The combined annual production from the Grey Fox and Stock mines is targeted to be between 75,000 to 90,000 gold equivalent ounces.
Processing
Mined material from the Froome underground mine is hauled by road trucks to the Stock mill. The processing includes a crushing circuit, a grinding circuit with two stages of closed-circuit ball milling, and soluble gold recovery through adsorption on granular activated carbon in CIC, CIL, and CIP trains, with a process efficiency of up to 97%. In 2025, production from the Fox Complex consisted of 98% doré and 2% slag and fine carbon.
Equipment
ITH (2); 2-boom jumbos (2); scissor decks (3); mechanized bolter (1); 4 yd LHD (1); 6 yd LHD (3); 8 yd LHD (2); 30 t trucks (3); 50 t trucks (2).
Expansion
A Pre-feasibility Study for the Grey Fox project, scheduled for release in Q2 2026, will highlight the potential to materially extend the mine life at the Fox Complex. Production from the Froome mine is being transitioned to the Stock mine, which is expected to begin initial production by mid-2026 and achieve commercial production in 2027. The development of the Grey Fox project is also a key part of the company's plan to increase production.
Companies & ownership
  • McEwen Mining Inc.
    TSX:MUX · NYSE:MUX
Frotet Gold Project

Québec, Canada · Open Pit

Under Development
Gold
Opened
2020-09-30
Overview
Large greenstone belt gold project in northern Québec; no mine plan defined.
Equipment
Exploration equipment & methods: airborne magnetics/EM (incl. VTEM and MegaTEM II); ground geophysics (magnetics, IP); borehole EM; till/humus geochem sampling; stripping/trenching & sampling; diamond drilling programs.
Garrison Project

Ontario, Canada · Open Pit

Feasibility
Gold
Opened
2020-11-25
End year
2032
Mine life
11 years
Workforce
~450 (planned)
Overview
PEA-stage gold project with stated initial CAPEX.
Production
Planned
Processing
Crushing, grinding, gravity, CIL
Equipment
Planned open-pit mining equipment (types/capacities only): diesel 165 mm DTH drills (production drilling); diesel RC drills (bench-scale grade control); 12 m³ diesel-hydraulic excavators; 13 m³ wheel loaders; 91 t rigid-frame haul trucks; 36 t articulated trucks; plus ancillary/service equipment and diesel-powered centrifugal pumps for pit dewatering.
Goldboro Project

Nova Scotia, Canada · Underground

Feasibility
Gold
Opened
2021-12-16
End year
2034
Mine life
11 years
Workforce
~500 (planned)
Overview
Feasibility-stage gold project in eastern Nova Scotia.
Production
Planned gold production
Processing
Crushing, grinding, gravity, leaching
Equipment
Owner mine equipment: 180 t excavator x1; 140 t excavator x2; 100 t excavator x1; 90 t excavator x3; 17.3 m³ wheel loader x1; 12.8 m³ wheel loader x1; 4.5 m³ loader/backhoe x1; 100 t (55 m³) off-highway haul trucks x7; 60 t (36 m³) off-highway haul trucks x9; 7.1 m³ ADT x4; 4.5 m³ ADT x2; 165 mm drill x2; 2.4 m³ dozer x2; 20.8 m³ dozer x1; grader (12 ft blade) x1; grader (14 ft blade) x2; water truck x2; fuel truck x2; small excavator x1; plus ancillary/support fleet (e.g., service trucks, pickups, forklift, boom trucks, manlifts, lube truck, etc.).
Goldex

Quebec, Canada · Underground

Operating
GoldSilverCopper
End year
2032
Workforce
approximately 700 employees and contractors
Overview
Goldex is an underground mine located in Val-d'Or, Quebec, Canada, and is operated by Agnico Eagle Mines Limited, which holds 100% ownership. The mine produces gold, with silver and copper as by-products. The Goldex complex is comprised of the Goldex underground mine and the Akasaba West open-pit mine, which is located less than 30 kilometres away and provides additional ore for the Goldex mill.
Production
760 thousand tonnes of ore milled in the first three months of 2023.
Processing
Primary jaw crusher (underground), secondary cone crusher (surface), grinding circuit (SAG mill, ball mill), gravity circuit (Knelson concentrators, Gemini shaking tables), flotation. Gold smelted on-site to produce doré bars. Gold-bearing pyrite concentrate transported to LaRonde complex for further processing.
Equipment
Rail-Veyor®, Jarvis and CAT AD45B haul trucks, CAT R2900X scooptrams
Companies & ownership
  • Agnico Eagle Mines Limited
    TSX:AEM · NYSE:AEM
Greens Creek

Alaska, United States · Underground

Operating
SilverGoldLeadZinc
Commodities, grades and output
YearCommodityAv. GradeOutput
2025Silver-8.7 Moz
2025Gold-59349 oz
2025Lead-18.2 kt
2025Zinc-51.3 kt
2024Silver-8.5 Moz
2024Gold-55275 oz
2023Silver-9.7 Moz
2023Gold-60900 oz
2023Lead-19600 t
2023Zinc-51500 t
Opened
1989-01-01
End year
2043
Autonomous haulage
Yes
Workforce
As of 2024, the mine employed approximately 512 people.
Overview
The Greens Creek mine is located on Admiralty Island, approximately 18 miles southwest of Juneau, within the Admiralty Island National Monument. It is one of the largest and lowest-cost primary silver mines in the world. The operation is accessed by sea and a 13-mile road. Major facilities include the underground mine, an ore concentrating mill, a dry stacked tailings facility, a ship-loading facility, camp facilities, and a ferry dock. The mine operates 24 hours a day, 365 days a year.
Production
Production overview - 2025: silver 8.7 Moz, gold 59349 oz, lead 18.2 kt, zinc 51.3 kt; 2024: silver 8.5 Moz, gold 55275 oz.
Processing
The ore concentrating mill uses a flotation and gravity process to recover silver, gold, lead, and zinc. The processing involves grinding and flotation to produce concentrates. A gravity circuit is used to recover free gold. Approximately half of the tailings are used as backfill in the underground mine, with the remainder being transported to a dry stacked tailings facility. In 2024, 46% of tailings were reused as backfill.
Equipment
The underground mobile equipment fleet includes conventional mining equipment. At least one LHD is capable of semi-autonomous operation and another is capable of tele-remote operation, which allows for production activities to continue during shift changes and post-blasting periods.
Companies & ownership
  • Hecla Mining Company
    NYSE:HL
Huckleberry Mine

British Columbia, Canada · Open Pit

Care And Maintenance
CopperMolybdenumGoldSilver
Opened
2016-05-11
End year
2017
Mine life
15 years
Workforce
approximately 260 people (when operational), 273 full-time employee equivalents (2016 filing)
Overview
The Huckleberry Mine is an open pit mine in British Columbia, Canada, currently on care and maintenance since August 2016. Imperial Metals Corporation holds 100% ownership. Primary commodities are copper, molybdenum, gold, and silver.
Production
Historical copper production
Processing
crushing, grinding, and flotation
Equipment
trucks and shovels
Expansion
Exploration activities include a 2025 diamond drilling program intersecting copper, molybdenum, silver, and gold mineralisation, with further drilling considered for 2026. Work planned in 2025 to update tailings facility design.
Companies & ownership
  • Imperial Metals Corporation
    TSX:III
Island Gold Mine (Phase 3+ Expansion)

Ontario, Canada · Underground

Feasibility
Gold
Opened
2022-06-28
Overview
Phase 3+ expansion of a high-grade underground gold mine near Dubreuilville.
Production
Planned expansion production
Processing
Crushing, grinding, CIL
Equipment
Jumbo (dev) current 4 / post 3; Bolter 0 / 4; Scissor lift 17 / 8; UG haulage truck 17 / 6 (ore/waste—includes Epiroc MT-42 + CAT AD-30 use referenced); LHD 6-yd 12 / 18; LHD 3.5-yd 4 / 4; Grader 2 / 2; Lube/Water truck 3 / 3; Boom truck 6 / 4; UG personnel vehicles 31 / 35; Tractor 4 / 6; Excavator 1 / 1; Loader (surface works) 4 / 2.
JOY Project

British Columbia, Canada · Open Pit

Under Development
CopperGoldSilver
Opened
2020-04-16
Overview
Porphyry Cu-Au-Ag exploration project in the Toodoggone district.
Equipment
Core drilling (Phase 1: 5,000 m; Phase 2: 12,500 m) supported by geophysical + geochemical + geological surface surveys; helicopter/trail access drilling; diamond saw-cut half-core preparation (core cutting/logging referenced)
Kemess Underground Project

British Columbia, Canada · Underground

Feasibility
CopperGold
Opened
2016-02-29
Overview
Restart/transition to underground mining leveraging existing Kemess South infrastructure under care & maintenance.
Production
Planned production
Processing
Crushing, grinding, flotation
Equipment
Owner fleet (max units): Jumbo, 2 boom (DD421) x4; Production Drill (DL431) x4; Aries ITH Drill with V30 Reamer (DU 411 – Aries) x1; Emulsion Loader (MC 605 VE) x4; Rockbolter (DS311) x3; Cablebolter (DS421) x2; Shotcrete Sprayer (SS3) x1; Transmixer (TM3) x3; Secondary Breaker, Water Cannon (WC-3) x1; Secondary Breaker, Blockholer (BH-3) x3; Secondary Breaker, Mobile Rockbreaker (RB3) x2; Secondary Breaker, Splitter (DB120) x2; Stationary Rockbreaker at Crushers (MRSTE35) x4; LHD, 3.7 m3, 6.7 t (LH307) x1; LHD, 8.6 m3, 17 t (manual) (LH517) x6; LHD, 8.6 m3, 17 t (automated) (LH517) x8; Haulage Truck, 50 t (TH550) x9; AutoMine System for LHDs (AutoMine LHD) x1; Grader (Veekmas FG 7 C) x1; Scissor Lift (SL3) x3; Boom Truck (BT3) x2; Flat Deck Truck (Toyota Landcruiser) x2; Mechanics Truck (Toyota Hurth) x2; Fuel/Lube Truck (PC3) x1; Personnel Carrier (9 per.) (Toyota Van) x2; Supervisor/Engineering Vehicle (Toyota) x8; Septic Vaccuum Truck x1; Forklift/Telehandler (535-140) x2; Personnel Carrier (16 per.) (FL3) x4; Cassettes System Prime Mover (Multimec MF 100) x2; Contractor fleet (max units): Surface Loader, 7 m3 (Cat966) x1; Surface Truck, 41 t (Cat745C) x4; Scissor Lift x1; Boom Truck x1; Flat Deck Truck x1; Supervisor/Engineering Vehicle x2; Forklift/Telehandler x1.
Kerr-Addison Project

Ontario, Canada · Underground

Feasibility
Gold
Opened
2023-04-30
Overview
Historic gold mine undergoing advanced exploration and technical studies.
Production
No current production
Processing
Conceptual gravity & leach
Equipment
Conceptual underground fleet
Kiena Mine Complex Project

Québec, Canada · Underground

Feasibility
Gold
Opened
2021-04-12
Overview
Prefeasibility study for underground restart/expansion at Val-d’Or.
Production
Planned production
Processing
Crushing, grinding, CIL
Equipment
Underground fleet including haulage and development equipment; quantities specified in PFS equipment schedules. Battery-electric haulage trucks (42-tonne class) – 3 units (planned); other mobile equipment is described at a high level but not itemized into a full make/model fleet list.
Kittilä

Lapland region, Finland · Underground

Operating
Gold
Autonomous haulage
No
Workforce
approximately 500 Agnico Eagle personnel and 600 contractors. Another source states the mine provides jobs for about 500 employees and about 500 employees of partner companies. Over 90% of the employees are from Lapland, with more than half from the municipality of Kittilä.
Overview
The Kittilä mine is a primary gold producer located in the Lapland region of northern Finland, approximately 900 kilometres north of Helsinki and 150 kilometres north of the Arctic Circle. It is owned and operated by Agnico Eagle Mines Limited. The mine is the largest primary gold producer in Europe. The operation is an underground mine, with mining having transitioned fully from open-pit operations in November 2012. The underground mining method is open stoping followed by delayed backfill.
Production
In 2023, the Kittilä mine processed an average of 5,353 tonnes of ore per day. The 2024 gold production is forecast to be 218,860 ounces from approximately 2 million tonnes of ore. The 2025 production was 217,379 ounces of gold. The mine's annual gold production is approximately 7,500 kg.
Processing
The processing plant has a capacity of 2 million tonnes of ore per year. The processing method for the refractory ore involves crushing, grinding, flotation, pressure oxidation in an autoclave, and a carbon-in-leach (CIL) circuit. Gold is recovered from the solution using electrowinning and then smelted into doré bars.
Equipment
Production hoist with a 2.5 MW motor and a personnel hoist with a 1.2 MW motor, both supplied by ABB. The underground fleet includes battery electric vehicles (BEVs). A Sandvik TH663i truck has been trialled at the mine. For development drilling, the mine uses four TeleRemote-operated machines. The operation is also implementing a 5G network for underground communication and to support autonomous and TeleRemote operations.
Companies & ownership
  • Agnico Eagle Mines Limited
    TSX:AEM · NYSE:AEM
Kona Gold Deposit

—, Côte d’Ivoire · Open Pit

Under Development
Gold
Opened
2021-07-31
Overview
Orogenic gold deposit with updated NI 43-101 Mineral Resource; no mine plan defined.
Equipment
Mining fleet/equipment not specified in this technical report (it describes exploration activities and drilling types—reverse circulation (RC) and diamond drilling—but does not provide a mining equipment/fleet list or make/model counts).
KSM (Kerr-Sulphurets-Mitchell) Project

British Columbia, Canada · Underground

Feasibility
CopperGoldSilver
Opened
2022-08-08
Overview
Large, multi-deposit copper-gold-silver project with PFS/PEA mine plans in NW BC.
Production
Planned production
Processing
Crushing, grinding, flotation
Equipment
Open pit (major equipment, maximum): Primary drill 311 mm electric drill x9; High wall drill 150 mm diesel hydraulic drill x5; Primary shovel 40 m³ diesel hydraulic shovel x3; Primary shovel 56 m³ electric cable shovel x3; Construction FEL 12 m³ x2; Haul truck 360 t x55; Construction haul truck 90 t x3
Lalor & Snow Lake Operations

Manitoba, Canada · Underground

Operating
CopperGoldSilverZinc
Opened
2021-03-29
End year
2031
Mine life
10 years
Workforce
~1,300
Overview
Integrated UG operations with reserve-backed LOM and capital programs.
Production
Ongoing
Processing
Crushing, grinding, flotation
Equipment
Underground trucks 65t (Lalor 4; 1901 2); underground trucks 42t (Lalor 12; 1901 1; WIM 5; 3 Zone 3); LHD 14t (Lalor 10; 1901 3; WIM 5; 3 Zone 3); LHD 18t (Lalor 5); LHD – service (Lalor 3; 1901 1); two boom jumbo (Lalor 6; 1901 2; WIM 2; 3 Zone 2); roof bolters (Lalor 10; 1901 3; WIM 2; 3 Zone 2); longhole drills (Lalor 5; WIM 2; 3 Zone 2); blockholer (Lalor 2); powder truck (Lalor 5; 1901 1; WIM 1; 3 Zone 1); scissor lift (Lalor 12; 1901 3; WIM 3; 3 Zone 3); boom truck (Lalor 3; 1901 1; WIM 1; 3 Zone 1); grader (Lalor 2; 1901 1; WIM 1; 3 Zone 1); backhoe (Lalor 5); cable reeler (Lalor 1); forklift (Lalor 15); general service truck (Lalor 17; 1901 2); skid steers (Lalor 2); front end loader (Lalor 3; 1901 1); personnel carriers (Lalor 33; 1901 3; WIM 2; 3 Zone 2).
Lamaque Complex

Quebec, Canada · Underground

Operating
Gold
End year
2032
Mine life
8 years
Overview
The Lamaque Complex is an operating underground gold mine in Val-d'Or, Quebec, Canada, 100% owned by Eldorado Gold. It includes the Triangle mine, Ormaque mine, Parallel and Plug #4 deposits, and the Sigma Mill.
Production
In 2025, produced 187,208 ounces of gold from 997,227 tonnes of ore milled at a grade of 6.19 grams per tonne. Average annual gold production expected to be above 175,000 ounces through 2028.
Processing
Ore from underground operations is processed at the Sigma Mill, which has a current capacity of approximately 2,500 tonnes per day, with studies to increase throughput towards 5,000 tonnes per day.
Expansion
Development of the Ormaque deposit adds a second underground mine to the complex, leveraging existing infrastructure, with operating authorisation in March 2026.
Companies & ownership
  • Eldorado Gold Corporation
Page 53 of 59 (1395 total)