Fourmile

Nevada, United States · Underground

Under Development
Gold
Mine life
25 years
Capex (est.)
USD 3.20B
Overview
The Fourmile project is a significant high-grade gold discovery wholly owned and operated by Barrick Gold Corporation. Updated studies and a preliminary economic assessment confirm its potential as a large-scale, long-life, low-cost Tier 1 asset. The deposit features single refractory gold ore which requires only a single-stage roast, a metallurgical advantage over the nearby Goldrush deposit. The project is advancing through a pre-feasibility study that commenced in 2025.
Production
A preliminary economic assessment indicates a potential annual output of between 600,000 and 750,000 ounces of gold.
Processing
The development plan includes pilot autoclave and roaster test work. Ore from Fourmile can be processed at the existing Carlin-Cortez facilities, and as it ramps up it will offset lower-grade stockpiles.
Expansion
A three-year pre-feasibility study began in 2025 and is targeted for completion in late 2028. This will be followed by an independent feasibility study in 2029. Construction of the Bullion Hill exploration decline portal is scheduled to commence in late 2026. Underground access from the advancing Goldrush multi-purpose development is expected to provide critical exploration drilling access from 2027. Barrick plans to have 34 kilometres of development in place by 2029 to connect Bullion Hill with Goldrush. Mine start-up is targeted for 2030, with initial test stoping and a ramp-up to full production anticipated by 2034.
Companies & ownership
  • Barrick Gold Corporation
    TSX:ABX · NYSE:B
  • Teck Resources
Otjikoto Mine

Otjozondjupa Region, Namibia · Open Pit

Operating
Gold
End year
2032
Workforce
expected to decrease from 700 to 400 employees during 2025
Overview
The Otjikoto Mine is a gold-producing operation in north-central Namibia, approximately 300 kilometres north of Windhoek. Operated by B2Gold Corp. (90% interest), it comprises an open-pit mine (concluding Q3 2025) and the Wolfshag underground mine (continuing into 2027). Processing of stockpiles is forecast until 2032. It is Namibia's largest gold producer.
Production
2023: 208,598 ounces of gold; 2024: 198,142 ounces of gold; 2025: 199,139 ounces of gold
Processing
conventional flowsheet, gravity concentration and intensive leaching, cyanide leach and carbon-in-pulp process for the gravity tailings, throughput capacity of 3.4 million tonnes per annum, gold recovery rate of approximately 98.0%
Equipment
Load, Haul and Dump (LHD) vehicles, 10.5 MWp solar power plant
Expansion
Wolfshag underground mine, potential new underground development at the nearby Antelope deposit
Companies & ownership
  • B2Gold Corp.
    TSX:BTO · NYSE:BTG
Masbate Mine

Masbate, Philippines · Open Pit

Operating
Gold
Companies & ownership
  • B2Gold Corp.
    TSX:BTO · NYSE:BTG
Fekola Mine

Kayes Region, Mali · Open Pit

Operating
Gold
Workforce
nearly 2,800 people
Overview
The Fekola Mine is a gold mine located in the Kayes Region of south-western Mali, approximately 210 kilometres south of Kayes and 40 kilometres south of Kéniéba. It is operated by B2Gold Corp. The mine is part of the larger Fekola Complex, which also includes Fekola Regional assets.
Production
2023: 590,243 ounces of gold; 2024: 392,946 ounces of gold; 2025 (full year): 530,769 ounces of gold
Processing
conventional flowsheet, gyratory primary crusher, conveyors, reclaim stockpile, semi-autogenous grinding in a primary mill, secondary ball milling, leach feed thickening, agitated leaching, carbon-in-pulp adsorption, elution, electrowinning, gold recovery to doré. Processing plant throughput capacity of 9.0 million tonnes per annum.
Equipment
90-tonne capacity off-highway mining trucks, 16.5m³ hydraulic front shovels, 44 Cat 777 (90-tonne capacity) and 17 Cat 789 (180-tonne capacity) trucks, Sandvik development drills, production drills, loaders, and trucks
Expansion
mill expansion to 7.5 million tonnes per annum was commissioned in September 2020; solar plant expansion became operational in January 2025, bringing total solar capacity to 52 MW with 27.7 MWh of battery capacity
Companies & ownership
  • B2Gold Corp.
    TSX:BTO · NYSE:BTG
Veladero

San Juan Province, Argentina · Open Pit

Operating
GoldSilver
Commodities, grades and output
YearCommodityAv. GradeOutput
2025Gold-230000 oz
2024Gold-504000 oz
2023Gold-414000 oz
Opened
2005-01-01
Workforce
approximately 3,800 people
Production
Production overview - 2024: gold 504000 oz; 2023: gold 414000 oz.
Processing
The mine utilises two-stage crushing and valley-fill heap leaching with a Merrill-Crowe recovery process. It also employs advanced recycling and closed-loop water systems.
Expansion
The mine is undergoing a significant expansion of its leach pad. The construction of Phase 7B was completed in December 2024. Construction of Phase 8, which is divided into three stages (8A, 8B, and 8C), began in the first quarter of 2025 with an expected completion in early 2026. The capital for the Phase 8 expansion is estimated at US$250-US$270 million. Additionally, a US$400 million investment proposal for the period of 2025-2028 has been submitted under Argentina's Large Investment Incentive Scheme (RIGI). This investment is intended to add approximately 1.6 million ounces of gold production over the mine's lifespan by creating 89.2 million tonnes of additional capacity for stockpiling and processing ore.
Power sources
Grid
Companies & ownership
  • Barrick Gold Corporation
    TSX:ABX · NYSE:B
  • Shandong Gold
Pueblo Viejo Expansion

Sánchez Ramírez province, Dominican Republic · Open Pit

Operating
Gold
Commodities, grades and output
YearCommodityAv. GradeOutput
2025Gold-631666.6666666666 oz
2023Gold-559000 oz
2022Gold-713000 oz
2021Gold-814000 oz
2020Gold-903000 oz
2019Gold-983000 oz
2018Gold-968000 oz
Opened
2012-01-01
End year
2040
Capex (est.)
USD 2.10B
Workforce
approximately 2,350 employees and 2,500 contractors
Overview
The Pueblo Viejo mine is an active, open-pit gold and silver mine in the Sánchez Ramírez province of the Dominican Republic, operated by Pueblo Viejo Dominicana Corporation (a JV between Barrick Gold (60%) and Newmont (40%)). The expansion project aims to extend its life beyond 2040 by increasing processing plant throughput to 14 Mtpa, sustaining over 800 koz annual gold production.
Production
Production overview - 2023: gold 559000 oz; 2022: gold 713000 oz.
Processing
Pressure oxidation for refractory ore, using four autoclaves, followed by cyanidation in a carbon-in-leach (CIL) circuit. Post-expansion, the plant handles approximately 30,000 tonnes of run-of-mine refractory ore per day. Stages include crushing, grinding, flotation, high-pressure oxidation, washing, neutralization, and CIL circuits.
Equipment
conventional truck and shovel operation, including CAT 994 Loaders, Hitachi 3600 Hydraulic shovels, CAT 789 C/D Rear-dump trucks, and Sandvik D55SP Drills
Expansion
Expansion project designed to extend mine life beyond 2040, involving processing plant expansion to 14 million tonnes per year throughput and a new tailings storage facility. Plant expansion substantially completed by end of 2023.
Companies & ownership
  • Barrick Gold Corporation
    TSX:ABX · NYSE:B
  • Newmont Corporation
    NYSE:NEM
Porgera

Enga Province, Papua New Guinea · Open Pit

Operating
GoldSilver
Commodities, grades and output
YearCommodityAv. GradeOutput
2025Gold-279000 oz
2011Gold-526000 oz
2009Gold-572595 oz
2009Silver-94764 oz
Opened
1990-01-01
End year
2043
Mine life
20 years
Capex (est.)
USD 304.78M
Opex (est.)
USD 444.22M
Workforce
As of early 2024, the mine employed over 2,000 people, with 98 per cent being Papua New Guineans. New Porgera Limited expects to employ approximately 3,200 people by the end of 2024.
Production
Production overview - 2011: gold 526000 oz; 2009: gold 572595 oz, silver 94764 oz.
Processing
The processing plant uses gravity and flotation circuits, followed by pressure autoclaves and cyanide leaching. It includes a cyanide destruction plant. The plant was fully commissioned in August 2024 following the mine's restart.
Equipment
The open pit and underground operations continue. To replace an aging surface fleet, an order was placed in the first quarter of 2025 for four Sandvik DR410i rotary blasthole drill rigs and three Leopard™ DI650i down-the-hole drill rigs, with deliveries expected to begin in June 2025. New Sandvik trucks, loaders, and drills for the underground operations began delivery in 2024.
Expansion
The mine was on care and maintenance from April 2020 until its official restart on 22 December 2023. This followed the granting of a new Special Mining Lease (SML 13) in October 2023. Full production is anticipated to be reached before the end of the third quarter of 2024. A Community Development Agreement (CDA) was being finalised as of late 2024. For 2024, a total expenditure of K2.7 billion (US$749 million) was planned, comprising K1.6 billion for operating costs and K1.1 billion for capital.
Companies & ownership
  • Barrick Gold Corporation
    TSX:ABX · NYSE:B
  • Kumul Minerals Holdings Limited
  • Zijin Mining Group
  • Barrick Niugini Limited
North Mara

Mara Region, Tanzania · Open Pit

Operating
Gold
Commodities, grades and output
YearCommodityAv. GradeOutput
2023Gold-253000 oz
2022Gold-263000 oz
Opened
2002-01-01
End year
2038
Workforce
2,923 people
Overview
The North Mara gold mine is located in the Tarime district of the Mara region in north-west Tanzania, approximately 100 kilometres east of Lake Victoria and 20 kilometres south of the Kenyan border. It is a combined open pit and underground operation.
Production
Production overview - 2023: gold 253000 oz; 2022: gold 263000 oz.
Processing
The process plant has the capacity to process an average of 8,000 tonnes of ore per day. The ore is treated using a conventional gravity, differential flotation and carbon-in-leach (CIL) process to produce gold dore. A new crushing plant was planned for commissioning in the fourth quarter of 2023 to improve crush size and increase throughput.
Equipment
The underground mining fleet includes Sandvik TH540, TH551i, and TH663i trucks, and Caterpillar R2900G LHDs, along with Sandvik production and development drills. The open pit operations utilise a fleet that includes ten new Cat 777 trucks commissioned in late 2022. The main loading units are two Cat 6020s, with a Cat 395 used for scaling and as a standby loading unit.
Expansion
Mining at the Gena pit was restarted in the second half of 2023. The Gokona Boxcut Project is underway, with the development of a new surface decline at the Gokona deposit. The decline development is expected to be completed in the first quarter of 2025, with the cutback to commence in the second quarter of 2025. There is also potential for a new underground mine at North Mara which is being explored. The mine's power generation capacity is set to be increased.
Companies & ownership
  • Barrick Gold Corporation
    TSX:ABX · NYSE:B
  • Government of Tanzania
Lone Tree

Nevada, United States · Processing Facility

Care And Maintenance
Gold
Companies & ownership
  • Barrick Gold Corporation
    TSX:ABX · NYSE:B
Long Canyon

Nevada, United States · Open Pit

Care And Maintenance
GoldSilver
End year
2024
Mine life
8 years
Workforce
In 2022, the workforce at Long Canyon consisted of 45 company employees and 40 contract employees. For 2023, the number of company employees was 14, with an additional 14 contract employees.
Overview
The Long Canyon mine is an open-pit gold and silver mine located in Elko County, Nevada, United States. It is situated on the eastern flank of the Pequop Mountains, approximately 27 miles east of Wells and 31 miles west of West Wendover. The project is part of the Nevada Gold Mines joint venture, which is 61.5% owned and operated by Barrick Gold Corporation, with Newmont Corporation holding the remaining 38.5%.
Production
In 2022, the mine produced 89,988 ounces of gold and 2,054 ounces of silver. For 2023, production was 15,002 ounces of gold and 897 ounces of silver. The facility is permitted to process up to 5 million tons of ore annually.
Processing
The processing of ore is conducted via a heap leach facility and a carbon-in-column plant.
Equipment
The mining equipment fleet includes blast-hole drills, hydraulic shovels, front-end loaders, and off-highway trucks. The support fleet consists of dozers, rubber-tired loaders, motor graders, and water trucks. The infrastructure at the site includes the open pit, a heap leach facility, a carbon-in-column plant, a waste rock storage facility, a truck shop, and an administration building.
Companies & ownership
  • Barrick Gold Corporation
    TSX:ABX · NYSE:B
Phoenix

Nevada, United States · Open Pit

Operating
GoldSilverCopper
Opened
1985-01-01
End year
2040
Workforce
approximately 500 employees
Overview
The Phoenix mine, also referred to as the Fortitude/Reona (Phoenix) Project, is an active open pit mining operation in the United States. It is located in Lander County, Nevada, approximately 13 miles south of the town of Battle Mountain. The project is situated within the historic Battle Mountain Mining District.
Production
average mining rate of approximately 110,000 tons per day; processing capacity of 48,000 tons per day and 20,000,000 tons per year; attributable gold production (Barrick's 61.5% share) was 27,000 ounces from a total production of 44,000 ounces in Q2 2025.
Processing
multi-stage beneficiation facility with a capacity of 48,000 tons per day and 20,000,000 tons per year, including a crushing and grinding circuit, a gravity separation facility, a dedicated cyanide leaching facility for gold and silver, a flotation mill, a carbon-in-leach plant, a copper leach pad, and a solvent extraction-electrowinning (SX-EW) plant.
Equipment
fleet of haul trucks, truck and shovel/loader
Expansion
A proposed expansion, the Greater Phoenix Project, aims to extend the mine life from 2040 to 2063 by consolidating five existing pits into an expanded Phoenix Pit and increasing its depth.
Companies & ownership
  • Barrick Gold Corporation
    TSX:ABX · NYSE:B
Twin Creeks Mine

Nevada, United States · Open Pit

Operating
GoldSilver
Opened
1993-01-01
End year
2030
Workforce
Over 700 people in the late 1990s; approximately 650 employees in 2000.
Overview
The Twin Creeks Mine, located in Humboldt County, Nevada, United States, was formed in 1993 by consolidating the Chimney Creek and Rabbit Creek mines. It is an active operation utilizing both open-pit and underground methods.
Production
From 1993 to 2002, produced 6,614,829 ounces of gold and 1,794,678 ounces of silver. In 1999, gold production was 760,574 ounces. Planned surface mining rate of 71,000 tonnes of ore per day. Underground expansion expected to add 30,000-40,000 ounces of gold annually.
Processing
Two mills (Pinon and Sage), Sage mill with two large autoclaves for refractory ores, heap leach facilities for lower-grade oxide ore, Juniper Mill for higher-grade oxide ore. Refractory ore process includes pressure oxidation, cyanide leaching, carbon adsorption, electrowinning, refining. Merrill-Crowe process also employed.
Equipment
haulage fleet, new electric shovel equipped with a 56-cubic yard bucket
Expansion
Twin Creeks Underground expansion achieved commercial production in 2018, expected to add 30,000 to 40,000 ounces of gold production annually and extend processing life to 2030.
Companies & ownership
  • Barrick Gold Corporation
    TSX:ABX · NYSE:B
Carlin Complex

Nevada, USA · Open Pit

Operating
Gold
End year
2045
Mine life
20 years
Overview
The Carlin project, also known as the Carlin Trend project or Carlin Complex, is a significant gold mining operation located in Eureka and Elko counties in Nevada, USA. It is operated by Nevada Gold Mines, a joint venture between Barrick Gold Corporation (61.5% ownership) and Newmont Corporation (38.5%). Barrick is the operator of the joint venture. The Carlin Complex is not a single mine but consists of multiple open pit and underground mines.
Production
In 2022, the Carlin Operations produced approximately 500,000 ounces of gold. For the full year 2023, the Carlin Complex's total production was 1,411,000 ounces of gold, with Barrick's attributable production being 868,000 ounces.
Processing
roasters, autoclaves, and heap leach pads. Specific processing plants mentioned are the Gold Quarry Roaster and the Goldstrike Roaster and Autoclave. The processing methods employed include carbon-in-leach (CIL) circuits, carbon stripping, and carbon regeneration kilns.
Equipment
Komatsu 930E-5 haul trucks, with 20 commissioned for use at Carlin as part of a larger deployment across Nevada Gold Mines.
Companies & ownership
  • Barrick Gold Corporation
    TSX:ABX · NYSE:B
Goldrush mine

Nevada, USA · Underground

Operating
Gold
End year
2048
Mine life
24 years
Workforce
around 570 people during its operational phase
Overview
The Goldrush mine is an underground gold mine located in the Cortez Mining District, Nevada, USA, part of the broader Cortez Complex. It officially opened in April 2024 and is currently ramping up production.
Production
Production for 2024 is forecast to be 130,000 ounces, with a projected increase to approximately 400,000 ounces per annum by 2028.
Processing
Non-refractory ores are treated on-site, which includes an oxide mill and heap leach facilities. Refractory ore is transported to Barrick's Goldstrike operation for processing.
Equipment
Sandvik 663 haul trucks
Companies & ownership
  • Barrick Gold Corporation
    TSX:ABX · NYSE:B
Goldstrike

Nevada, United States · Open Pit

Operating
GoldSilver
Opened
1987-01-01
Overview
The Goldstrike mine is a significant gold-producing asset in Eureka County, Nevada, operated by Nevada Gold Mines (NGM), a joint venture between Barrick Gold Corporation (61.5% ownership) and Newmont Corporation (38.5%). It comprises both open pit (Betze-Post) and underground (Meikle and Rodeo) operations, now integrated into the larger Carlin Complex.
Production
From 1986 to 2018, the mine produced 44.4 million ounces of gold. In 2018, Goldstrike produced 795,663 ounces of gold. Production figures are now reported for the entire Carlin Complex.
Processing
Processing facilities include roasters and autoclaves for treating refractory ore. The method involves crushing and milling, followed by oxidation in either an autoclave or a roaster before gold is leached from the ore.
Equipment
Open pit operations utilize a conventional truck and shovel fleet, including two P&H 4100 and two P&H 2800 electric shovels, four Hitachi hydraulic shovels, 40 Komatsu 930E haul trucks, 15 CAT 793 haul trucks, and smaller haul trucks and support equipment. Underground operations employ longhole open stoping and drift and fill methods.
Companies & ownership
  • Barrick Gold Corporation
    TSX:ABX · NYSE:B
Cortez

Nevada, United States · Open Pit

Operating
Gold
Commodities, grades and output
YearCommodityAv. GradeOutput
2023Gold-1000000 oz
2019Gold-963000 oz
Opened
1969-01-01
End year
2031
Capex (est.)
USD 1.00B
Workforce
463 (337 company employees, 126 contract employees) for the Cortez Hills Underground Mine.
Overview
The Cortez Complex is a large gold mining and processing facility located in Lander and Eureka Counties, Nevada. It is part of the Nevada Gold Mines LLC joint venture, which is 61.5% owned and operated by Barrick Gold Corporation, with Newmont Corporation holding the remaining 38.5%. The complex comprises multiple open-pit and underground mines, including the Pipeline, Crossroads, and Cortez Hills open-pit mines, and the Cortez Hills underground mine. It also includes the Goldrush, Fourmile, and Robertson development projects. The deposits are identified as Carlin-type sedimentary rock-hosted deposits.
Production
Production overview - 2023: gold 1000000 oz; 2019: gold 963000 oz.
Processing
A multi-faceted processing system is used. Lower-grade oxide ore is treated via heap leaching. Higher-grade, non-refractory ore is processed at an oxide mill using carbon-in-leach (CIL) and carbon-in-column (CIC) processes. Refractory ores are transported to Nevada Gold Mines' Carlin Complex for processing in autoclave or roaster facilities.
Equipment
Conventional truck-and-shovel fleets, including 400-short-ton Liebherr T 282 B trucks and Komatsu 930E-5 haul trucks.
Expansion
The Goldrush underground mine is a major expansion project at the Cortez complex. The U.S. Bureau of Land Management approved the plan of operations in late 2023, allowing the production ramp-up to begin in 2024. The official opening of the Goldrush mine was announced on 25 April 2024. The project is forecast to produce 130,000 ounces in 2024, increasing to approximately 400,000 ounces per year by 2028. The total anticipated capital expenditure for the project is approximately $1 billion.
Companies & ownership
  • Barrick Gold Corporation
    TSX:ABX · NYSE:B
  • Newmont Corporation
    NYSE:NEM
Loulo-Gounkoto

Kayes Region, Mali · Open Pit

Operating
Gold
Commodities, grades and output
YearCommodityAv. GradeOutput
2025Gold-29000 oz
2024Gold-723000 oz
Opened
2005-01-01
End year
2037
Mine life
16 years
Workforce
5,956 in 2022, 6,909 in 2023, and 8,100 in 2024 (majority contractors)
Overview
The Loulo-Gounkoto complex is a significant gold mining operation in western Mali, near the Falémé River, which marks the border with Senegal. It is located approximately 350km west of Bamako and 220km south of Kayes. The complex comprises two distinct mining permits: Loulo, which includes the Gara and Yalea deposits, and Gounkoto to the south. It is one of the world's largest gold producers. Operations were suspended in January 2025 due to a dispute with the Malian government but resumed in December 2025 after a settlement was reached. Barrick regained operational control on December 18, 2025.
Production
Production overview - 2025: gold 29000 oz; 2024: gold 723000 oz.
Processing
The complex has a processing facility with an annual capacity of 5.0 million tonnes per annum (mtpa). There are plans to increase the plant's annual capacity to 6.2mtpa by 2029.
Equipment
The underground equipment fleet includes development and production drills, trucks, and load-haul-dumps (LHDs) with remote and fully automated options.
Expansion
The Baboto pit is being reopened with the potential for underground expansion.
Companies & ownership
  • Barrick Gold Corporation
    TSX:ABX · NYSE:B
  • State of Mali
Kibali

Haut-Uélé Province, Democratic Republic of Congo · Open Pit

Operating
Gold
Commodities, grades and output
YearCommodityAv. GradeOutput
2025Gold2.79 g/t9.4243605 t
2024Gold2.82 g/t9.61104 t
2023Gold2.89 g/t10.6687 t
2022Gold2.98 g/t10.48098 t
Opened
2013-01-01
End year
2033
Mine life
10 years
Workforce
As of 31 December 2025, the mine had a workforce of 3,173.
Overview
The Kibali mine is a joint venture operated by Barrick Gold Corporation (45% ownership), with AngloGold Ashanti (45%) and Société Miniére de Kilo-Moto (SOKIMO) (10%) as partners. Recent drilling at the ARK-KCD corridor has shown the potential for significant orebodies, which could extend the mine's life. A 10-year business plan was implemented in July 2023 to maintain its Tier One asset status.
Production
Production overview - 2025: gold 9.4243605 t; 2024: gold 9.61104 t.
Processing
The metallurgical plant includes a twin-circuit sulphide and oxide plant with conventional carbon-in-leach (CIL) and gravity recovery. A 16MW solar plant with an integrated Battery Energy Storage System has been commissioned, increasing the mine's use of renewable energy to 85% and allowing it to run on 100% renewable power for six months of the year.
Expansion
Ongoing exploration is focused on near-mine discoveries to replenish reserves. The Kalimva, Ikamva and Ndala satellite pits are being mined under contracts with local businesses.
Power sources
HydroelectricSolarBattery Storage
Companies & ownership
  • Barrick Gold Corporation
    TSX:ABX · NYSE:B
  • AngloGold Ashanti
  • Société Miniére de Kilo-Moto (SOKIMO)
Whyalla Quarry

South Australia, Australia · Quarry

Operating
Silica SandGraphiteKaolinHalloysiteTitaniumIron Ore (Magnetite)+39
Overview
The Boral Whyalla Quarry is a hard rock quarry owned and operated by Boral Limited, located just outside Whyalla, South Australia. It is an active, operational quarry and a strategic mineral resource area, co-located with a Boral concrete plant. The quarry supplies a range of high-quality construction materials for regional projects and infrastructure development.
Companies & ownership
  • Boral Limited
    ASX:BLD
Stirling North Quarry

South Australia, Australia · Quarry

Operating
GraphiteSilica SandKaolinHalloysiteTitaniumIron Ore (Magnetite)+39
Workforce
The operation has a workforce of less than 10 full-time employees.
Overview
The Stirling North Quarry, owned and operated by Boral Limited, is an active open-cut quarry in South Australia. Located approximately 5 km northeast of Stirling North township, it operates under Private Mine tenement 154 with an approved Mine Operation Plan as of December 2023. The quarry has been operational since the mid-1970s.
Processing
The general process involves extraction, crushing, and screening to produce various sizes of quarry products, including thermal sand for the Lincoln Gap Wind Farm.
Equipment
The primary equipment includes a main processing plant and a contractor screen.
Companies & ownership
  • Boral Limited
    ASX:BLD
Lobethal Quarry

South Australia, Australia · Open Pit

Operating
GraphiteSilica SandKaolinHalloysiteTitaniumIron Ore (Magnetite)+39
Overview
The Lobethal Quarry, operated by Boral Limited, is an active open-cut quarry located in Lobethal, South Australia. It is considered a strategic mineral resource area and supplies construction materials such as aggregates, asphalt, cement, crushed rock, and roadbase to the Adelaide Hills region.
Production
The quarry produces aggregates, rail ballast, pre-mix concrete, and road materials.
Processing
The quarry underwent a $4 million plant upgrade in 2015, transforming it into a more automated and efficient operation for producing construction materials.
Equipment
The quarry underwent a $4 million plant upgrade in 2015, transforming it into a more automated and efficient operation. It is recognised as one of the cleanest and safest fixed plant areas within Boral's South Australian business.
Companies & ownership
  • Boral Limited
    ASX:BLD
Kapunda Quarry

South Australia, Australia · Quarry

Operating
Silica SandGraphiteKaolinHalloysiteTitaniumIron Ore (Magnetite)+39
Overview
Boral's Kapunda Quarry, an operating site in Kapunda, South Australia, produces aggregates, rail ballast, pre-mix concrete, and road materials, and is a strategic mineral resource area. The broader Kapunda site also includes Australia's first commercially successful metal mine, which produced copper from 1844 to 1879 and is now a State Heritage Place. Environmental Copper Recovery Pty Ltd (ECR) and Terramin Australia Limited are advancing the Kapunda Copper & Gold ISR Project on the historic mine site, with technical collaboration from OZ Minerals.
Expansion
The Kapunda Copper & Gold ISR Project, a joint venture between Environmental Copper Recovery Pty Ltd (ECR) and Terramin Australia Limited, aims to extract an estimated 119,000 tonnes of copper from shallow oxide ores using in-situ recovery methods. In May 2025, the South Australian Department for Energy and Mining approved in-ground test work for the project, which also has potential for gold recovery.
Companies & ownership
  • Boral Limited
    ASX:BLD
Nueltin Lake Project

Nunavut, Canada · Underground

Under Development
UraniumGoldMolybdenumCopperTungstenCobalt+1
Workforce
anticipated to be between two and nine people, including a two-person drill crew, a drill foreman, geologists, and two two-person mapping crews.
Overview
The Nueltin Lake project is an exploration-stage undertaking located in the Kivalliq Region of southern Nunavut, Canada, just north of the Manitoba border. It is a joint venture between URU Metals Limited and Cameco Corporation. The project is focused on exploring for polymetallic deposits, with target commodities including uranium, gold, molybdenum, copper, tungsten, cobalt, and nickel.
Equipment
helicopter-mobilised drill (heli-drill)
Expansion
joint venture between URU Metals Limited and Cameco Corporation; option agreement was entered into where URU Metals could earn into the project by funding exploration activities.
Companies & ownership
  • Cameco Corporation
    TSX:CCO · NYSE:CCJ
Stonyfell Quarry

South Australia, Australia · Quarry

Operating
Silica SandGraphiteKaolinHalloysiteTitaniumIron Ore (Magnetite)+39
Opened
1837-01-01
Mine life
100 years
Workforce
The quarry's management team includes a Quarry Manager, a Quarry Support Manager, and an Operations Manager Quarries.
Overview
Stonyfell Quarry, located in the foothills of the Mount Lofty Ranges east of Adelaide, South Australia, is one of Adelaide's oldest quarries, operating since 1837. Boral Limited acquired the site in the 1980s. The quarry extracts sandstone and quartzite to produce road base, aggregates, crushed rock, washed sands for concrete manufacturing, fill materials, and specialty rocks. It also recycles concrete and is considered a significant state resource with at least 100 years of available materials.
Production
Produces road base, aggregates, crushed rock, washed sands for concrete manufacturing, fill materials, specialty rocks, and recycled concrete. Primary materials extracted are sandstone and quartzite.
Processing
The processing infrastructure at Stonyfell Quarry includes a primary crusher and a sprinkler system within the crushing plant to manage dust. The facility produces road base, aggregates, crushed rock, washed sands for concrete manufacturing, fill materials, and specialty rocks from extracted sandstone and quartzite.
Equipment
The processing infrastructure at the site includes a primary crusher and a sprinkler system within the crushing plant to manage dust. Other equipment includes a water cart for spraying roads and stockpiles, and a truck wash.
Expansion
Major capital improvement works were undertaken to upgrade the primary crusher, which involved installing a new steel structure and a heavy-duty concrete slab.
Companies & ownership
  • Boral Limited
    ASX:BLD
Page 43 of 59 (1395 total)