Minesites Directory

Browse minesites. Each card shows company ownership and their most recent associated articles.

Filter by mine details and commodity attributes.
Page 40 of 59 (1395 total)
Los Gatos Silver Mine

Chihuahua, Mexico · Underground

Operating
SilverZincLeadGoldCopper
End year
2032
Workforce
approximately 540 employees, with over 99% hailing from Mexico.
Production
current operating throughput target of approximately 3,500 tonnes per day. For the full year 2024, on a 100% basis, the mine's production was projected to be 15.6 million silver equivalent ounces, which includes 9.7 million ounces of silver, 69.7 million pounds of zinc, 46.4 million pounds of lead, and 5,530 ounces of gold.
Processing
conventional design with flotation technology to produce lead and zinc concentrates. The processing flowsheet includes a crushing and grinding circuit equipped with a jaw crusher, a semi-autogenous grinding (SAG) mill, and a ball mill. This is followed by lead and zinc flotation circuits, concentrate thickening, and tailings thickening.
Equipment
six jumbo drills, seven bolters, one cable bolter, three longhole production drill rigs, nine loaders, and seven 40-tonne underground mine trucks. The total mobile equipment fleet comprises 97 pieces, including ancillary vehicles for mine services and personnel.
Companies & ownership
  • First Majestic Silver Corp.
    TSX:AG · NYSE:AG
Angangueo

Michoacán, Mexico · Underground

Under Development
CopperZincLeadSilverGold
Overview
Polymetallic mining project in Angangueo, Michoacán, Mexico, operated by Southern Copper Corporation's parent company, Grupo México. The project is currently not in operation and is considered a future or potential project pending government approvals. Located within the buffer zone of the Monarch Butterfly Biosphere Reserve, a UNESCO World Heritage site, leading to environmental concerns and public opposition, delaying its development. As of early 2024, it lacked necessary authorisation for land use change.
Production
Planned annual production: 10,400 tonnes of copper, 9,700 tonnes of zinc, and 3,900 tonnes of lead (other sources projected 10,400 tonnes of copper and 7,000 tonnes of zinc).
Companies & ownership
  • Southern Copper Corporation
La Encantada Silver Mine

Coahuila, Mexico · Underground

Operating
SilverGold
Workforce
640 people, comprising 290 unionised workers, 110 employees, and 240 contractors.
Overview
The mine is located in northern Mexico in the state of Coahuila, approximately 708 kilometres northeast of Torreon. The property is situated in the municipality of Villa de Ocampo, about 120 kilometres east of the city of Melchor Múzquiz. The site includes 4,076 hectares of mining rights and 1,343 hectares of surface rights.
Production
In 2023, the mine processed 966,392 tonnes of ore, producing 2,718,856 ounces of silver and 321 ounces of gold. In the fourth quarter of 2024, the mine produced 755,963 ounces of silver from 253,953 tonnes of processed ore. The projected production for 2024 is 2.3 million ounces of silver.
Processing
Historically, a 1,000 tonne-per-day flotation plant was the primary method for silver recovery. This was later replaced by a 4,000 tonne-per-day cyanidation mill. The flotation circuit was suspended in June 2010 and is currently under care and maintenance. The cyanidation plant, which commenced operations in April 2010, allows for the production of silver doré bars on-site.
Equipment
electro-hydraulic jumbos, hand-held jacklegs, diesel-powered load-haul-dumps (LHDs), highway-type diesel rear-dump trucks, battery-powered rail haulage trains, three new 20-tonne Torino-style haulage trucks with Mercedes-Benz engines
Expansion
In 2015, the plant was upgraded with a new 12' x 24' ball mill, a tertiary crusher, two vibrating screens, and a series of conveyor belts. A roasting circuit has also been implemented to enhance recoveries from tailings.
Companies & ownership
  • First Majestic Silver Corp.
    TSX:AG · NYSE:AG
Santa Elena Silver/Gold Mine

Sonora, Mexico · Underground

Operating
SilverGold
End year
2027
Overview
The Santa Elena operation is a district-scale project encompassing mining concessions that total 102,244 hectares. It comprises the Santa Elena and the Ermitaño underground mines.
Production
In Q1 2024, produced 2,280,739 silver equivalent ounces (355,205 oz silver, 21,713 oz gold) from 224,394 tonnes of ore. 2024 guidance: 10.3 million silver equivalent ounces (1.5 million oz silver, 104,000 oz gold).
Processing
The processing plant has a capacity of 3,000 tonnes per day and utilises a cyanidation circuit. The plant processes ore from the Santa Elena and Ermitaño mines in separate campaigns.
Equipment
crushers and mills
Expansion
A dual-circuit concept with an additional leach tank, CCD thickener and filter press has been implemented to improve metallurgical performance.
Companies & ownership
  • First Majestic Silver Corp.
    TSX:AG · NYSE:AG
San Dimas Silver/Gold Mine

Durango, Mexico · Underground

Operating
SilverGold
Opened
1904-01-01
Workforce
approximately 1,800 people
Overview
Underground silver/gold mine in Durango, Mexico, operated by First Majestic Silver Corp. since its acquisition in May 2018. The company holds 100% ownership.
Production
Q4 2025: 1,315,711 ounces of silver and 15,066 ounces of gold. Full year 2025 production saw a 19% increase. 2024 production guidance: 4.5 million ounces of silver and 50,000 ounces of gold.
Processing
Conventional crushing and grinding, followed by cyanidation and zinc precipitation to recover gold and silver. Doré bars are produced through smelting. Tayoltita mill has a processing capacity of 2,500 tonnes per day.
Equipment
load-haul-dump (LHD) machinery and haul trucks
Companies & ownership
  • First Majestic Silver Corp.
    TSX:AG · NYSE:AG
Angaston Quarry

South Australia, Australia · Open Pit

Operating
PhosphateMineral SandsSilica SandKaolinHalloysiteTitanium+39
Opened
1950-01-01
Workforce
40 jobs (2014)
Overview
The operational mine is an open-pit quarry located approximately 2.5 kilometres north of the township of Angaston, in the Barossa Valley region of South Australia, Australia. It produces limestone, marble, and aggregates for various industrial uses.
Production
approximately one million tonnes of industrial minerals and aggregates per annum (2014); 900,000 tonnes of material (2016)
Processing
crushing and grading of the extracted materials
Equipment
large fleet of Komatsu equipment, including WA600-3 and WA480-6 loaders and HD785-5 and HD465-5 dump trucks (information from 2010)
Companies & ownership
  • Adbri Limited
    ASX:ABC
Mt Carrington Project

New South Wales, Australia · Open Pit

Under Development
GoldSilverCopperZinc
Mine life
5.5 years
Overview
The Mt Carrington project is at an advanced exploration and development stage and is not currently in production. Small-scale open-pit mining was conducted from 1974 to 1990. The current owner, Legacy Minerals, is compiling historical data and plans further fieldwork, geophysics, and diamond drilling, with a Scoping Study scheduled for Q1 2026.
Production
A 2020 Pre-Feasibility study for a "Gold First" stage projected the production of 172,600 ounces of gold over a 5.5-year mine life, with an average annual production of approximately 31,400 ounces.
Processing
Flotation to produce a precious metal concentrate.
Equipment
The project has substantial existing infrastructure, including haul roads, a site office, accommodation, a core shed, and core processing facilities. A 2020 Pre-Feasibility Study proposed a 1 million tonnes per annum (Mtpa) processing plant.
Companies & ownership
  • White Rock Minerals Limited
Morning Star Gold Mine

Victoria, Australia · Underground

Care And Maintenance
Gold
Overview
The Morning Star Gold Mine is an underground gold mine located near the town of Woods Point, approximately 120 kilometres north-east of Melbourne, in the state of Victoria, Australia. The mine is part of the Woods Point Gold Project.
Production
80,000 tonne per annum gravity gold processing plant; nameplate throughputs of between seven and nine tonnes per hour; historically produced 883,000 ounces of gold at an average grade of 26.5g/t
Processing
gravity gold processing plant; gravity separation and smelting into doré on-site
Equipment
shaft, headframe, winder, and a dewatering system
Companies & ownership
  • White Rock Minerals Limited
Woods Point Gold Project

Victoria, Australia · Underground

Closed
Gold
Workforce
At the time of acquisition in August 2021, the project came with a workforce of 23 personnel. In July 2022, the company stated it would be doubling the workforce.
Overview
The Woods Point Gold Project, located in Victoria, Australia, includes the Morning Star Gold Mine and Rose of Denmark Mine. White Rock Minerals held a 95% interest. Acquired in August 2021, gold production recommenced in Q3 2022 but the Morning Star Gold Mine was placed on care and maintenance on 21 March 2023 and subsequently closed due to funding pressures.
Production
Historical production from Morning Star (1862-1963) was 883,000 ounces at 26.5 g/t gold. Rose of Denmark historical production was 36,000 ounces at 11.6 g/t gold. Prior to White Rock's full acquisition (Jan-Sep 2020), 7,600 tonnes at 12.3 g/t gold were processed, recovering 3,000 ounces.
Processing
Gravity gold processing plant with a capacity of 80,000 tonnes per annum. The processing method involved a VSI crushing unit and screens, which were refurbished in 2022.
Equipment
Underground infrastructure included a shaft, headframe, and winder. In July 2022, two new Eimco 12B Rocker Shovels and two new scrapers were ordered to support development.
Companies & ownership
  • White Rock Minerals Limited
Last Chance Gold Target

Alaska, United States · Open Pit

Under Development
Gold
Overview
The Last Chance Gold Target is an early-stage exploration project operated by White Rock Minerals. It is located in central Alaska, United States, within the Tintina Gold Province, and is part of White Rock Minerals' broader Red Mountain Project. The project is 100% owned by White Rock Minerals and targets gold over a 15 square kilometre area.
Equipment
drill rigs
Companies & ownership
  • White Rock Minerals Limited
Red Mountain Project

Alaska, USA · Underground

Under Development
ZincSilverLeadGoldCopper
Workforce
No permanent operational workforce; a 24-man field camp was planned for the 2019 field season.
Overview
The Red Mountain Project is an advanced exploration polymetallic volcanogenic massive sulphide (VMS) deposit in Central Alaska, rich in zinc, silver, lead, gold, and copper. It is located approximately 100 kilometres south of Fairbanks and covers 836 square kilometres, comprising two identified deposits: Dry Creek and West Tundra Flats.
Production
There are no production figures.
Processing
Preliminary metallurgical testing indicated good recoveries of over 90% for zinc, 75% for lead, 70% for silver, 80% for gold, and 70% for copper.
Equipment
A 24-man field camp was planned for the 2019 field season to support surface crews for mapping, sampling, geophysics, and drilling.
Companies & ownership
  • White Rock Minerals Limited
Woolgar Gold Project

Queensland, Australia · Open Pit

Under Development
Gold
Mine life
20 years
Overview
One of Queensland's most significant undeveloped gold resources. Mining leases have been granted, and the project is awaiting statutory approval.
Processing
Metallurgical test work has indicated that gold recoveries of over 90% can be achieved using a conventional processing flowsheet including crushing, milling, gravity separation, and leaching.
Companies & ownership
  • QCoal Group
Redcliffe Gold Project

Western Australia, Australia · Open Pit

Under Development
Gold
Overview
The Redcliffe Gold Project is located in the Eastern Goldfields region of Western Australia, approximately 45-60 kilometres northeast of Leonora. The project was previously acquired by Dacian Gold Limited in March 2021 through a merger with NTM Gold Limited. The primary commodity is gold. The project is currently in the development stage, with key approvals in place.
Processing
Proposed processing involves trucking ore to a nearby processing plant, such as the Mt Morgans mill.
Companies & ownership
  • Dacian Gold Limited
    ASX:DCN
Kelly

Western Australia, Australia · Open Pit

Under Development
Gold
Overview
The Kelly deposit is a gold project located in the Eastern Goldfields region of Western Australia, Australia. It forms part of the Redcliffe Project. Geologically, the Kelly deposit is described as being 1,090 metres long and extending 110 metres below the surface. The mineralisation strikes at 000° with a -35° dip to the east and is contained within 15 domains of variable thickness, ranging from 2 to 30 metres with an average width of 10 metres.
Processing
ore to be processed at Mt Morgans processing plant
Companies & ownership
  • Dacian Gold Limited
    ASX:DCN
Bindy

Western Australia, Australia · Open Pit

Feasibility
Gold
Overview
The Bindy deposit is a gold project in the Eastern Goldfields region of Western Australia, approximately 45-60km northeast of Leonora, and is part of the Redcliffe Project. The deposit is 950 metres long and extends 285 metres below the surface, with mineralisation consisting of eight domains averaging 8 metres width. As of 30 June 2021, the Mineral Resource was estimated to be 3,080,000 tonnes at 1.3 grams per tonne of gold, containing 129,000 ounces of gold.
Processing
Ore is expected to be processed at the Jupiter Processing Facility, part of the Mt Morgans Gold Operation.
Companies & ownership
  • Dacian Gold Limited
    ASX:DCN
Nambi

Western Australia, Australia · Open Pit

Under Development
Gold
Overview
Nambi is a gold deposit located in the Eastern Goldfields region of Western Australia, Australia. It is situated approximately 45 kilometres north-east of Leonora. The project is part of Dacian Gold's Redcliffe Gold Project, which the company owns 100%.
Production
The plan projected that the Nambi pit would provide 308,000 tonnes at 2.7g/t for 27,000 ounces.
Expansion
Nambi was intended to be a cutback on the historic pit.
Companies & ownership
  • Dacian Gold Limited
    ASX:DCN
GTS (Gindalbie Tectonic Zone South)

Western Australia, Australia · Open Pit

Under Development
Gold
Opened
2024-01-01
Overview
GTS (Gindalbie Tectonic Zone South) is a gold deposit within the Redcliffe Project, which is part of the Mt Morgans Gold Operation in Western Australia. The project is owned by Dacian Gold, which is a subsidiary of Genesis Minerals Limited. The Redcliffe Project is located 45-60 kilometres northeast of Leonora in the Eastern Goldfields Region of Western Australia, approximately 750 kilometres north-east of Perth.
Production
As of 30 June 2022, the Mineral Resource estimate for the GTS deposit included 930,000 tonnes at 1.9 g/t gold for 56,000 ounces in the indicated category, and 1,360,000 tonnes at 1.2 g/t gold for 51,000 ounces in the inferred category. A 2021 mine plan indicated the GTS pit was expected to provide 293,000 tonnes at 2.4 g/t for 23,000 ounces.
Processing
Metallurgical test work has been conducted, with recoveries based on rock types. Ore from the project would likely be processed at Dacian's 2.9Mtpa CIL treatment plant at the Mt Morgans operation.
Expansion
development was deferred due to a high strip ratio and the required capital investment. Regulatory approvals for mining were pending at that time. A five-year mine plan issued in August 2021 scheduled mining to transition to the GTS deposit during the 2024 financial year.
Companies & ownership
  • Dacian Gold Limited
    ASX:DCN
Hub

Western Australia, Australia · Open Pit

Under Development
Gold
Overview
The Hub deposit is part of the Redcliffe Project, located 45-60km northeast of Leonora in the Eastern Goldfields Region of Western Australia. It is planned as a high-grade open pit mine, with potential for underground extraction. As of October 2023, it was under development with final mining approvals received and an access agreement executed.
Production
A five-year mine plan announced in August 2021 projected the Hub open pit would mine a total of 212,000 tonnes at 5.0 g/t Au for 34,000 ounces. An updated Ore Reserve as of 30 June 2023 for the Hub open pit was 580,000 tonnes at 3.4 g/t for 64,000 ounces. The total Mineral Resource for the Hub deposit as of 30 June 2023 was 1.7 million tonnes at 3.1 g/t for 168,000 ounces.
Processing
Ore from the Redcliffe deposits is expected to be transported to and processed at the Mt Morgans processing plant. Metallurgical test work indicated a fixed gold recovery of 92%.
Companies & ownership
  • Dacian Gold Limited
    ASX:DCN
Heffernans

Western Australia, Australia · Open Pit

Care And Maintenance
Gold
End year
2025
Overview
Heffernans is an open-pit gold mine located in the North Eastern Goldfields region of Western Australia, Australia. It is part of the Jupiter mining complex, which is a component of the larger Mt Morgans Gold Operation (MMGO), owned and operated by Dacian Gold. Heffernans is one of three main syenite pipes that constitute the Jupiter syenite intrusive complex, the other two being Doublejay and Ganymede. This complex has a north-south extent of about 2 kilometres. The mineralisation at Heffernans is described as syenite-related gold mineralisation.
Processing
Carbon-in-Leach (CIL) treatment plant
Companies & ownership
  • Dacian Gold Limited
    ASX:DCN
Doublejay

Western Australia, Australia · Open Pit

Care And Maintenance
Gold
Overview
The Doublejay mine is a key component of the Jupiter open-pit mining complex, which is part of the broader Mt Morgans Gold Operation. The project is located in the Laverton gold district of Western Australia, Australia, approximately 25 to 30 kilometres south-west of Laverton.
Production
For the 2019 financial year, the Jupiter open pit (which includes Doublejay) mined 2 million tonnes of ore for 65,000 ounces of gold. A 2015 scoping study estimated potential high-grade production from the Doublejay open pit as 2.9 million tonnes at a grade of 1.40 grams per tonne (g/t) for 133,000 ounces, with an additional 0.9 million tonnes of low-grade production at 0.57 g/t for 16,000 ounces.
Processing
2.5 million tonnes per annum (Mtpa) Carbon-In-Leach (CIL) treatment plant
Equipment
conventional fleet which can include excavators and haul trucks
Expansion
cut-back of the historic Joanne and Jenny pits; mining conducted in three stages
Companies & ownership
  • Dacian Gold Limited
    ASX:DCN
Mt Marven

Western Australia, Australia · Open Pit

Care And Maintenance
Gold
Workforce
Specific numbers for Mt Marven not detailed. Dacian Gold had 136 employees plus contractors across all operations as of June 2022.
Overview
Mt Marven is an open-pit gold mine operated by Dacian Gold, located in Western Australia, Australia. It is a satellite pit situated approximately 3 kilometres west of the Jupiter processing plant, within the broader Mt Morgans Gold Operation (MMGO) near Laverton.
Production
No specific production figures solely for Mt Marven. Part of Mt Morgans Gold Operation which produced 106,919 ounces of gold in the 2021 financial year and 90,809 ounces in the 2022 financial year. A planned southern extension for FY2023 targeted 27,000 ounces of gold.
Processing
Ore from Mt Marven is transported by road train to the Jupiter Processing Facility for processing. The processing method used at the plant is a Carbon-in-Leach (CIL) process with a nameplate capacity of approximately 2.5 to 3 million tonnes per annum. Metallurgical recoveries from the ore are approximately 92%.
Equipment
trucks and excavators
Expansion
A future southern extension of the Mt Marven pit was planned to mine 662,000 tonnes at 1.3 g/t Au for 27,000 ounces in FY2023.
Companies & ownership
  • Dacian Gold Limited
    ASX:DCN
Cameron Well

Western Australia, Australia · Open Pit

Under Development
Gold
Overview
Cameron Well is a gold prospect located approximately 25 kilometres west of Laverton, Western Australia, as part of Dacian Gold's Mt Morgans Gold Operation (MMGO). Discovered in 2017, it was identified as a significant near-surface oxide gold anomaly. Exploration activities are ongoing, targeting both oxide and primary bedrock mineralisation.
Processing
Ore was intended to be processed at the 2.5Mtpa CIL treatment plant at the Mt Morgans Gold Operation.
Equipment
Potential to utilise synergies with the existing open pit mining fleet and personnel at Mt Morgans.
Companies & ownership
  • Dacian Gold Limited
    ASX:DCN
Jupiter

Western Australia, Australia · Open Pit

Care And Maintenance
Gold
Workforce
The Mt Morgans Gold Operation includes a 400-person mining camp.
Overview
The Jupiter mine is a large open pit gold mine located in the Laverton gold district of Western Australia, approximately 20 to 35 kilometres southwest of Laverton. It is part of the Mount Morgans Gold Operation (MMGO). The mine area is defined by a single large open pit, 1.8 kilometres long, up to 650 metres wide, and 220 metres deep, consisting of several sub-pits including Doublejay, Heffernans, Saddle, Ganymede, and Mt Marven.
Production
For the 2022 financial year, 2,674 kilotonnes of ore at a grade of 1.0 g/t Au, containing 86,537 ounces of gold, was mined from the Mt Morgans open pits.
Processing
Adjacent Jupiter Processing Facility (Mt Morgans mill), a Carbon-In-Leach (CIL) treatment plant with a capacity of 2.5-2.9 million tonnes per annum (Mtpa).
Equipment
Standard open pit mining equipment, 19.8 MW gas-fired power station. Contract with Macmahon Holdings for drilling and blasting, loading, hauling, and technical services.
Companies & ownership
  • Dacian Gold Limited
    ASX:DCN
Ramornie Complex

Western Australia, Australia · Open Pit

Care And Maintenance
Gold
Overview
Ramornie is a gold deposit located in the Eastern Goldfields region of Western Australia, forming part of the Mt Morgans Gold Operation. The project consists of the Ramornie, Ramornie North, and Sarah open pits, collectively known as the Ramornie Complex. Gold mineralisation is hosted within north-northeast trending shear-hosted lodes in greenschist facies altered basalt flows. The deposit has potential for both open pit and underground mining.
Processing
Ore from any future mining at the Ramornie Complex is intended to be processed at the Jupiter Processing Facility, part of the Mt Morgans infrastructure.
Companies & ownership
  • Dacian Gold Limited
    ASX:DCN