← Map view|Directory

Directory

Browse minesites, mining companies and suppliers. Use the tabs below to switch sections.

Minesites Directory

Browse minesites. Each card shows company ownership and their most recent associated articles.

Filter by mine details and commodity attributes.
Page 4 of 61 (1443 total)
Porgera

Enga Province, Papua New Guinea · Open Pit

Operating
GoldSilver
Commodities, grades and output
YearCommodityAv. GradeOutput
2009Gold-572595 oz
2009Silver-94764 oz
Opened
1990-01-01
End year
2010
Mine life
20 years
Workforce
Over 3,000 Papua New Guineans will be employed by New Porgera Limited by the end of 2024
Overview
The Porgera mine was placed on care and maintenance in April 2020. On December 22, 2023, the Porgera Project Commencement Agreement was formally completed, and the mine officially reopened. Mining and processing restarted at Porgera in January and February 2024, respectively. New Porgera Limited has been appointed as the operator of the Porgera mine. The new ownership structure gives PNG stakeholders a 51% share and Barrick Niugini Limited (a joint venture between Barrick Gold and Zijin Mining) a 49% share. Over the life of the mine, PNG stakeholders will receive 53% of Porgera's overall economic benefits, while Barrick and Zijin will receive 47%. For 2024, Barrick's attributable production from Porgera is forecast to be between 80,000 and 100,000 ounces of gold.
Production
Production overview - 2019: gold 17 t; 2016: gold 234000 oz.
Processing
The major components of the Porgera processing plant include a crushing circuit, coarse and fine ore storage, a grinding circuit, a gravity and regrind circuit, a flotation circuit, pressure oxidation and tailings neutralisation circuits, leaching and adsorption circuits, acid wash and stripping elution circuits, electrowinning and gold refinery, an oxygen plant, and chemical storage and mixing.
Kibali

Haut-Uélé province, Democratic Republic of Congo · Underground

Operating
Gold

Companies & Ownership (1)

Greens Creek

Alaska, United States · Underground

Operating
SilverGoldZincLead
Commodities, grades and output
YearCommodityAv. GradeOutput
2024Silver-8500000 oz
2024Gold-55275 oz
2023Silver-9700000 oz
2023Gold-60900 oz
2023Zinc-51500 t
2023Lead-19600 t
Opened
1989-01-01
End year
2043
Workforce
512 (2024)
Production
Production overview - 2024: silver 8500000 oz, gold 55275 oz; 2023: silver 9700000 oz, gold 60900 oz, zinc 51500 t, lead 19600 t.
Processing
The mine uses a conventional flotation concentrator to produce a gravity gold concentrate, a silver concentrate, a zinc concentrate, and a precious metals concentrate. The primary mining methods are cut-and-fill and longhole stoping.
Expansion
U.S. Forest Service approved extension of production for 12-18 years, extending operational life past 2031 to at least 2043. Approval includes additional tailings disposal capacity and enhanced habitat protection measures.

Companies & Ownership (1)

Reko Diq Project

Balochistan, Pakistan · Open Pit

Under Development
CopperGold

Companies & Ownership (1)

Porgera

Enga Province, Papua New Guinea · Open Pit

Operating
GoldSilver

Companies & Ownership (1)

Kibali

Haut-Uele Province, Democratic Republic of Congo · Open Pit

Operating
Gold
Commodities, grades and output
YearCommodityAv. GradeOutput
2025Gold2.79 g/t20.930000000000003 t
2022Gold2.98 g/t337000 oz
2021Gold3.25 g/t365000 oz
2020Gold3.29 g/t364000 oz
2019Gold-814000 oz
2016Gold-585946 oz
2015Gold3.5 g/t642720 oz
End year
2043
Mine life
30 years
Capex (est.)
USD 3.02B
Workforce
2988 (2024), 2883 (2023), 2731 (2022), 5048 (2016), 94% of the workforce are Congolese nationals
Production
Production overview - 2025: gold 20.930000000000003 t; 2022: gold 337000 oz.
Processing
The metallurgical plant has a twin-circuit sulphide and oxide plant with conventional carbon-in-leach (CIL), gravity recovery, and a float and ultra-fine grind circuit. The plant can process 7.2 million tonnes of ore per year. In 2025, the mine milled 8.322 Mt at a recovery of 90.31%. The operation is powered by three hydropower stations and a 16MW solar plant with battery storage, which increases the renewable energy use to 85%.
Equipment
The open pit contractors use SY500/350 excavators, Caterpillar D8R bulldozers, Sinotruck water bowers, and XCMG GR300 graders. For blasting, Pantera DP1500 I and Komatsu drill rigs are used.
Expansion
Drilling results from the ARK-KCD corridor have shown the potential for significant additional orebodies, which could extend the mine life. The life-of-mine plan extends to 2043.
Power sources
HydroelectricSolarBattery Storage
Reko Diq Project

Balochistan, Pakistan · Open Pit

Under Development
CopperGold

Companies & Ownership (1)

Porgera

Enga Province, Papua New Guinea · Open Pit

Operating
GoldSilver

Companies & Ownership (1)

Loulo-Gounkoto

Kayes Region, Mali · Open Pit

Operating
Gold
Commodities, grades and output
YearCommodityAv. GradeOutput
2025Gold3.77 g/t5.5 t
2024Gold4.73 g/t723000 oz
2023Gold3.99 g/t547000 oz
2022Gold4.59 g/t547000 oz
2021Gold-700000 koz
2020Gold4.76 g/t680215 oz
2012Gold-503000 oz
2011Gold-346000 oz
2005Gold-67984 oz
Opened
2005-01-01
End year
2041
Mine life
32 years
Autonomous haulage
Yes
Workforce
The total workforce was approximately 8,100 people in 2024, including 2,900 employees and 5,200 contractors. Previous workforce numbers were 6,909 in 2023 and 5,956 in 2022. In May 2026, a major contractor, Gounkoto Mining Services, was reportedly laying off over 600 workers.
Overview
The Loulo-Gounkoto complex is an active gold-producing operation in the Kayes Region of western Mali, near the border with Senegal. It comprises two integrated mining permits, Loulo and Gounkoto, and is owned by Barrick Gold Corporation (80%) and the State of Mali (20%) through Société des Mines de Loulo SA (SOMILO) and Société des Mines de Gounkoto SA. The complex combines open-pit mining at Gounkoto, Yalea South, Gara West, and Baboto pits, with underground mines at Yalea, Gara, and Gounkoto. The Loulo mining permit was renewed for a further 10 years in February 2026.
Production
Gold production was 723,000 ounces in 2024, 547,000 ounces in 2023, and 5.5 tonnes in 2025 due to an operational suspension. As of 31 December 2025, proven gold reserves were 1.8 million ounces from 15 million tonnes grading 3.77 g/t, and probable reserves were 5.0 million ounces from 36 million tonnes grading 4.32 g/t.
Processing
Ore from both the Loulo and Gounkoto sites is processed at a central plant located at Loulo, which uses a conventional crushing, milling, and Carbon-in-Leach (CIL) circuit. Its throughput capacity has reached a peak of 5.2 million tonnes per annum. Ore from Gounkoto is first crushed on-site before being transported approximately 30 km to the Loulo plant.
Equipment
The open-pit mining fleet includes Liebherr 9350 and 9250 excavators, Caterpillar 777D and HD785 dump trucks, and Caterpillar 992-wheel loaders, dozers, and graders. The underground fleet is equipped with development and production drills, trucks, and load-haul-dumps (LHDs), some with remote and automated capabilities.
Expansion
Expansion plans include increasing the processing plant's capacity to 6.2 million tonnes per annum, with construction scheduled to begin in 2027. A third underground mine at Gounkoto began producing ore in 2023. Future developments include commencing mining at the Loulo 3 open pit in 2027 and the Faraba open pit in 2029. The complex is also expanding its solar power and battery storage system to 60 MW.
Power sources
DieselSolarBattery Storage

Companies & Ownership (2)

Kibali

Haut-Uélé Province, Democratic Republic of Congo · Open Pit

Operating
Gold
Commodities, grades and output
YearCommodityAv. GradeOutput
2025Gold2.79 g/t673000 oz
Opened
2013-01-01
End year
2043
Workforce
3173 (as of 31 December 2025)
Production
Production overview - 2025: gold 673000 oz.
Processing
The mine has a metallurgical plant that comprises a twin-circuit sulphide and oxide plant with conventional carbon-in-leach (CIL), including gravity recovery.
Expansion
A February 2026 technical report, with an effective date of 31 December 2025, updated the mine's geology, resources, reserves and project details. The life-of-mine plan extends to 2043. Exploration drilling in the ARK-KCD corridor shows the potential to significantly grow the mine's reserve base.
Kinskuch

British Columbia, Canada · Underground

Under Development
SilverGoldCopper
Overview
The Kinskuch mine, previously operated by Hecla Mining Company, is now under the full ownership of Dolly Varden Silver Corporation and integrated into its Kitsault Valley Project. It is a silver, gold, and copper exploration venture in British Columbia, Canada, currently in a pre-development phase with ongoing exploration activities.
Expansion
Integrated into Dolly Varden's larger Kitsault Valley Project, covering approximately 77,000 hectares, significantly increasing Dolly Varden's land position in British Columbia's Golden Triangle.

Companies & Ownership (2)

Connaught

Yukon, Canada · Open Pit

Historic Mine
GoldSilverLead
Commodities, grades and output
YearCommodityAv. GradeOutput
1966Gold2.1 g/t47.67 kg
1966Silver2297 g/t52.1519 kg
1966Lead67.3 %15.2851 t
Overview
The Connaught property is located approximately 65 kilometres west of Dawson City. Hecla Mining acquired the Connaught property as part of a larger land package from ATAC Resources in a transaction that closed in July 2023. The project has historically been explored as a high-grade silver-lead-zinc-copper-gold vein prospect. However, the focus has shifted to exploring for copper-molybdenum porphyry mineralisation. A 2022 government report noted that ATAC had re-envisioned the project as a porphyry copper-gold-molybdenum target.
Production
Production overview - 1966: gold 47.67 kg, silver 52.1519 kg, lead 15.2851 t.
Processing
hand sorting
Expansion
Hecla Mining acquired the Connaught property as part of a larger land package from ATAC Resources, which also included the Rackla property, for approximately US$18.8 million.

Companies & Ownership (1)

Wasamac Project

Quebec, Canada · Underground

Feasibility
Gold
Overview
Advanced exploration project.

Companies & Ownership (1)

Upper Beaver Project

Ontario, Canada · Underground

Under Development
Gold

Companies & Ownership (1)

San Nicolás Project

Zacatecas, Mexico · Underground

Feasibility
CopperZincGoldSilver
Overview
A 50/50 joint venture with Teck Resources, currently in the permitting and engineering stage.

Companies & Ownership (1)

Odyssey Mine

Quebec, Canada · Underground

Under Development
Gold
Overview
Part of the Canadian Malartic Complex, this is an underground project.

Companies & Ownership (1)

Marban Project

Quebec, Canada · Open Pit

Feasibility
Gold
Overview
Advanced exploration project that could potentially be a satellite open-pit operation for the Canadian Malartic Complex.

Companies & Ownership (1)

La India Mine

Sonora, Mexico · Open Pit

Closed
Gold
Overview
Open pit mining ceased in late 2023; the site is now in a residual leaching and pre-closure phase.

Companies & Ownership (1)

Hope Bay

Nunavut, Canada · Underground

Care And Maintenance
Gold
Overview
The mine is on care and maintenance with an active exploration program.

Companies & Ownership (1)

Meliadine Mine

Nunavut, Canada · Underground

Operating
Gold

Companies & Ownership (1)

Macassa Mine

Ontario, Canada · Underground

Operating
Gold

Companies & Ownership (1)

LaRonde Complex

Quebec, Canada · Underground

Operating
Gold

Companies & Ownership (1)

Kittilä Mine

Lapland, Finland · Underground

Operating
Gold

Companies & Ownership (1)

Goldex Complex

Quebec, Canada · Underground

Operating
Gold

Companies & Ownership (1)

Page 4 of 61 (1443 total)