Buzwagi

Shinyanga Region, Tanzania · Open Pit

Closed
GoldCopper

Companies & Ownership (1)

Connaught

Yukon, Canada · Underground

Feasibility
SilverGoldLeadZincCopper

Companies & Ownership (1)

Tulsequah Chief Mine

British Columbia, Canada · Underground

Closed
CopperZincLeadGoldSilver

Companies & Ownership (1)

NewRange Project

Minnesota, United States · Open Pit

Under Development
CopperNickelCobaltPalladiumPlatinumGold+1
Mine life
20 years
Capex (est.)
USD 1.00B
Workforce
over 360 full-time operational jobs and 700 jobs during its construction phase.
Overview
The NewRange Project is located in the established Iron Range mining region of northeastern Minnesota and consists of two deposits: NorthMet and Sunrise (formerly Mesaba). The project is currently in the permitting stage. In May 2025, the NorthMet Project was designated as a Transparency Project by the US federal government to prioritise and streamline the federal permitting process.
Production
The NorthMet deposit is planned as an open pit operation. The initial plan for the NorthMet operation is for a processing rate of 32,000 tons per day. NewRange is studying the potential to increase this to 40,000 tons per day.
Processing
The planned processing for the NorthMet project will involve a beneficiation plant and a hydrometallurgical plant. The process will include primary and secondary crushing, a new SAG mill and a new ball mill. Ore will be processed through rougher flotation to produce a bulk copper and nickel concentrate, which will then be reground and separated in a cleaner flotation circuit. The hydrometallurgical plant will involve pressure treatment of concentrates and precipitation of gold and platinum group metals.
Expansion
In partnership with Glencore.

Companies & Ownership (2)

Zafranal Project

Arequipa Region, Peru · Open Pit

Care And Maintenance
CopperGold
Commodities, grades and output
YearCommodityAv. GradeOutput
2016Copper0.4 %3543000000 lbs
2016Gold0.07 g/t891000 oz
Mine life
19 years
Capex (est.)
USD 1.26B
Overview
The Zafranal Project is a copper-gold deposit located in the Arequipa Region of southern Peru. The project is currently in the development phase, however, in March 2026, Teck Resources decided to postpone a construction decision, and the project has been transitioned to a state of asset preservation. Early work activities were scheduled to cease in the first quarter of 2026. The focus for 2026 will be on identifying and evaluating opportunities to enhance the business case for a future sanction decision.
Production
Production overview - 2016: copper 3543000000 lbs, gold 891000 oz.
Processing
conventional sulphide flotation concentrator with crushing, grinding, flotation, thickening, and filtering
Expansion
In partnership with Mitsubishi Materials.

Companies & Ownership (2)

Quebrada Blanca

Tarapacá Region, Chile · Open Pit

Operating
Copper
Commodities, grades and output
YearCommodityAv. GradeOutput
2024Copper-207800 t
2023Copper-56200 t
2022Copper-9600 t
Opened
1994-01-01
End year
2050
Mine life
27 years
Capex (est.)
USD 8.60B
Workforce
Over 3,000 local workers are expected to be employed during operations. During the construction of the Quebrada Blanca Phase 2 (QB2) project, more than 30,000 people participated.
Overview
The Quebrada Blanca Phase 2 (QB2) project achieved its first copper in March 2023 and was operating near design throughput capacity by the end of 2023. The expanded operation is expected to produce an average of 316,000 tonnes of copper-equivalent annually for the first five full years. It includes a concentrator plant with a capacity to process 140,000 tonnes per day, a tailings facility, a desalination plant, and pipelines. A molybdenum plant was substantially completed in December 2023, with commissioning underway. Cathode production ended in the fourth quarter of 2023. Operations are supported by a remote Integrated Operations Centre in Santiago.
Production
Production overview - 2024: copper 207800 t; 2023: copper 56200 t.
Processing
The expanded operation includes a concentrator plant with a capacity to process 140,000 tonnes per day. The infrastructure also features a tailings facility, a desalination plant for all production processes, and pipelines to transport copper concentrate and desalinated water over 165 kilometres. A molybdenum plant was substantially completed in December 2023, with commissioning underway. Cathode production ended in the fourth quarter of 2023. Operations are supported by a remote Integrated Operations Centre in Santiago.
Equipment
The QB2 expansion includes a new large crusher. PROK Chile was engaged to manufacture and supply 57 engineered pulleys with diameters ranging from 450mm to 2000mm.
Expansion
The Quebrada Blanca Phase 2 (QB2) project is a major expansion that develops the deeper sulphide resource underlying the original supergene orebody. The project was inaugurated in October 2023. The capital cost for the QB2 project was guided at US$8.6-$8.8 billion. The expansion will use only about 18% of the total 2022 reserves and resources, indicating significant potential for future growth.
Water sources
Desalination

Companies & Ownership (4)

Reko Diq Project

Balochistan, Pakistan · Open Pit

Under Development
CopperGold
Mine life
37 years
Workforce
During peak construction, the project is expected to employ between 7,500 and 10,000 people. Once in production, it is expected to create between 3,500 and 4,000 long-term jobs, with one source mentioning 6,400 employees and contractors during full production.
Overview
The Reko Diq Project is planned as a truck-and-shovel open-pit operation with two open pits, a processing plant, waste rock dumps, and a tailings storage facility. It is currently under development, though Barrick announced a slowdown in development activity and an extended project review until mid-2027 due to escalating security risks.
Production
The mine is expected to produce 200,000 to 250,000 tonnes of copper per year. Phase 1 is designed for an annual output of 200,000 tonnes of copper concentrate and 250,000 ounces of gold.
Processing
The project will have processing facilities to produce a high-quality copper-gold concentrate. Construction is planned in two phases, with a combined process capacity of 90 million tonnes per annum.
Expansion
Construction is planned in two phases. Phase 1 capital cost was estimated at $5.6 billion to $6.0 billion, and Phase 2 at $3.3 billion to $3.6 billion, though Barrick anticipates significant increases to the capital budget and timeline. The project's reconstitution was finalised in December 2022. An Environmental and Social Impact Assessment (ESIA) was completed in 2024 and approved in March 2025.
Noxon

Montana, United States · Underground

Under Development
SilverCopper

Companies & Ownership (1)

Libby Exploration Project

Montana, United States · Underground

Under Development
CopperSilver
Commodities, grades and output
YearCommodityAv. GradeOutput
2024Copper0.7 %1500000000 lbs
2024Silver1.6 oz/t183000000 oz
Overview
The Libby Exploration Project, formerly known as the Montanore project, is an underground silver and copper exploration operation in Lincoln County, Montana, acquired by Hecla Mining Company in September 2016. The project focuses on exploration and evaluation, with a new Plan of Operations from the U.S. Forest Service allowing for 16 years of underground exploration, including dewatering and rehabilitating the Libby Creek Adit. It faces regulatory oversight and legal challenges from environmental groups.
Production
Production overview - 2024: copper 1500000000 lbs, silver 183000000 oz.
Expansion
The mineralisation is reported to be open down dip and to the north, indicating potential for resource expansion.

Companies & Ownership (1)

NewRange Copper Nickel LLC

Minnesota, United States · Open Pit

Under Development
CopperNickelPlatinumPalladiumGoldSilver

Companies & Ownership (1)

San Nicolás Project

Zacatecas, Mexico · Open Pit

Under Development
CopperZincGoldSilver

Companies & Ownership (1)

Zafranal Project

Arequipa Region, Peru · Open Pit

Under Development
CopperGold

Companies & Ownership (1)

Quebrada Blanca

Tarapacá Region, Chile · Open Pit

Operating
CopperMolybdenum
Commodities, grades and output
YearCommodityAv. GradeOutput
2024Copper-207800 t
2023Copper-56200 t
2017Copper0.51 %-
2017Molybdenum0.019 %-
Opened
1994-01-01
Mine life
27 years
Workforce
over 3,000 local workers
Production
Production overview - 2024: copper 207800 t; 2023: copper 56200 t.
Processing
The operation consists of an open pit mine, a concentrator plant with a production capacity of 140,000 tonnes-per-day, a tailings facility, and port facilities. The processing of copper ore involves crushing, milling, bulk flotation, thickening, and filtering to produce copper and molybdenum concentrates. Copper concentrate is transported 165 kilometres by pipeline to the port for shipment. The molybdenum plant was substantially completed in December 2023 with ramp-up expected to be finished by the end of the second quarter of 2024.
Expansion
The Quebrada Blanca Phase 2 (QB2) project is a major expansion of the original mine, developing the deeper sulphide resource. At full production, QB2 is expected to double Teck's consolidated copper production. The project has an initial mine life of 27 years, which will use only about 18% of the 2022 reserves and resources, indicating significant potential for further expansions.
Water sources
Desalination

Companies & Ownership (4)

Carmen de Andacollo

Coquimbo Region, Chile · Open Pit

Operating
CopperGold
Commodities, grades and output
YearCommodityAv. GradeOutput
2025Copper-51000 t
2024Copper-39700 t
2024Gold-19300 oz
2023Copper-39600 t
2023Gold-22500 oz
2022Copper-38600 t
2022Gold-25900 oz
2021Copper-45000 t
2020Copper-58000 t
2019Copper-54000 t
Opened
1994-01-01
End year
2031
Mine life
35 years
Workforce
The mine has a workforce of 473 people. The majority of personnel reside in the nearby town of Andacollo or the cities of Coquimbo and La Serena.
Overview
The Carmen de Andacollo mine is an open-pit copper and gold operation in the Coquimbo Region of Chile, approximately 350 kilometres north of Santiago. It is operated by Compañía Minera Teck Carmen de Andacollo, a joint venture between Teck Resources (90%) and ENAMI (10%). The mine is located at an elevation of 1,000 metres and transitioned to 100% renewable power in September 2020.
Production
Annual copper production in concentrate was 39,600 tonnes in 2023 and 39,700 tonnes in 2024. All payable gold produced is sold to RGLD Gold AG under a streaming agreement.
Processing
The mine processes hypogene ore using semi-autogenous grinding and a flotation plant with a capacity of up to 55,000 tonnes of ore per day to produce copper concentrates. Previously, supergene ore was processed through heap leaching and a solvent extraction and electrowinning plant to produce copper cathodes, but these cathode operations ceased in 2023.
Equipment
The mining equipment fleet includes electric blast hole drills, electric cable shovels, a hydraulic excavator, front-end loaders, and haul trucks with capacities of up to 229 tonnes, supported by various ancillary vehicles.
Expansion
An operational continuity project is underway to extend the mine's life until 2031. A further extension beyond this date is being studied and will require additional water rights and regulatory approvals. These studies include technical assessments and the collection of environmental baseline data to support an environmental impact assessment.
Water sources
Groundwater

Companies & Ownership (2)

Noxon

Montana, United States · Underground

Under Development
CopperSilver
Commodities, grades and output
YearCommodityAv. GradeOutput
1989Copper0.68 %979200
1989Silver1.65 oz/t237600000 oz
Mine life
30 years
Overview
The Noxon project, also known as Rock Creek Project, is a proposed underground copper and silver mine located in Sanders County, Montana. It is currently in pre-development, facing a long permitting and legal process. Hecla Mining Company acquired the project in 2015 and holds 100% ownership. The proposed mine life is estimated to be between 30 and 37 years. The project involves a mill/concentrator complex with proposed metallurgical recoveries of 88% for silver and 92% for copper. Plans include wastewater discharge into the Clark Fork River and storage of 100 million tons of waste rock.
Production
Production overview - 1989: copper 888315 t, silver 237600000 oz.
Processing
mill/concentrator complex; metallurgical recoveries are 88% for silver and 92% for copper
Equipment
mill/concentrator complex

Companies & Ownership (1)

Libby Exploration Project

Montana, United States · Underground

Feasibility
CopperSilver
Commodities, grades and output
YearCommodityAv. GradeOutput
2024Copper0.7 %-
2024Silver1.6 oz/t-
Workforce
approximately 30 to 35 personnel
Overview
The Libby Exploration Project is an underground silver and copper exploration project operated by Hecla Mining Company through its wholly-owned subsidiary, Montanore Minerals Corporation. The project is located in Lincoln County, Montana, in the United States, approximately 20 aerial miles south of the town of Libby. The project was previously known as the Montanore Mine before being renamed by Hecla.
Processing
The processing method for the exploration phase involves the analysis of samples to obtain geologic and metallurgical data on the copper and silver mineralization.

Companies & Ownership (1)

Rock Creek

Montana, USA · Underground

Under Development
SilverCopper

Companies & Ownership (1)

Libby Exploration Project (formerly Montanore)

Montana, United States · Underground

Under Development
SilverCopper

Companies & Ownership (1)

Santa Lúcia Project

Pará, Brazil · Open Pit

Feasibility
CopperGold
Commodities, grades and output
YearCommodityAv. GradeOutput
2021Copper2.1 %-
2021Gold0.35 g/t-
Mine life
8 years
Overview
Iron oxide copper-gold mineral deposit located in the Carajás Mineral Province in the state of Pará, northern Brazil. The project is situated approximately 100 km south of Parauapebas and 30 km east of Canaã. It is also described as being within a 40 km trucking distance of the Antas processing hub.
Production
proposed mining rate is 1.0 Mtpa
Processing
conventional crushing, grinding, and flotation. Run-of-mine ore from Santa Lúcia to be processed at the central processing facility at the Carajás East Hub, located at the Antas mine.
Oak Dam

South Australia, Australia · Block Cave

Under Development
CopperGoldSilverUranium
Workforce
up to 150 personnel
Overview
Oak Dam is an advanced exploration project. BHP is progressing the Oak Dam Underground Access Project to conduct further exploration from underground drill platforms.
Equipment
up to 14 drill rigs, twin declines, box cut, portal development, utility facilities, diesel generation plant, refrigeration plant, administration buildings, maintenance buildings, concrete batch plant, waste rock landform
Expansion
BHP is progressing the Oak Dam Underground Access Project to conduct further exploration from underground drill platforms. Construction of declines and infrastructure planned to commence in FY25 and project completion in FY29.
Power sources
Diesel

Companies & Ownership (2)

Pedra Branca

Pará, Brazil · Underground

Operating
CopperGold
Commodities, grades and output
YearCommodityAv. GradeOutput
2025Copper1.68 %-
2025Gold0.47 g/t-
Opened
2020-01-01
Mine life
8 years
Workforce
During the construction phase, approximately 100 people were required, and once in production, the steady-state operations were expected to employ 450 people.
Processing
Ore from the Pedra Branca underground mine is transported approximately 75km to the Antas North processing plant. The plant has a capacity of 800 ktpa, and tailings are deposited in the exhausted Antas North open pit.
Expansion
OZ Minerals commenced mine construction in 2019, with the first development ore targeted for mid-2020 and ramp-up to full production in 2022. BHP acquired OZ Minerals in May 2023. On 15 August 2025, BHP entered into a binding agreement to sell its Carajás assets, including Pedra Branca, to a wholly-owned subsidiary of CoreX Holding. This transaction was completed on 2 April 2026. The new operating company is named CoreX Copper Brasil.

Companies & Ownership (2)

West Musgrave Project

Western Australia, Australia · Open Pit

Under Development
NickelCopper
Commodities, grades and output
YearCommodityAv. GradeOutput
2022Nickel0.31 %720000 t
2022Copper0.34 %790000 t
Mine life
26 years
Capex (est.)
USD 1.12B
Workforce
Prior to the suspension announcement, the construction workforce was reduced from approximately 400 to 300 people in March 2024. Following the decision to suspend the entire Western Australia Nickel operations, it was announced that the 1,600 frontline employees would be offered redeployment within BHP or redundancies.
Overview
The mine was expected to produce an average of approximately 35,000 tonnes of nickel and 41,000 tonnes of copper annually during the first five years of operation.
Production
Production overview - 2022: nickel 720000 t, copper 790000 t.
Processing
The project plans to use a mineral processing plant with a capacity of 10-12 million tonnes per annum (Mtpa). The processing method involves a grinding circuit with two stages of crushing followed by two parallel vertical roller mills and a bulk flotation circuit to produce separate copper and nickel concentrates. Key equipment suppliers include Metso Outotec for the cone crusher and flotation units. GR Engineering was contracted for the design and construction of the processing plant.
Expansion
The West Musgrave Project, along with BHP's other Nickel West operations, will be temporarily suspended from October 2024. BHP plans to review this decision by February 2027. The suspension is due to an oversupply in the global nickel market. Project construction was at 30 per cent completion when the suspension was announced.

Companies & Ownership (2)

Prominent Hill

South Australia, Australia · Underground

Operating
CopperGold
Commodities, grades and output
YearCommodityAv. GradeOutput
2022Copper-55547 t
2022Gold-124843 oz
Opened
2009-01-01
End year
2040
Capex (est.)
USD 900.00M
Production
Production overview - 2022: copper 55547 t, gold 124843 oz.
Processing
conventional crushing, grinding and flotation
Equipment
truck haulage, deep shaft ore hoisting system, Wira Shaft
Expansion
The Prominent Hill Operations Expansion (PHOX) project is a significant underground expansion to transition the mine from truck haulage to a deep shaft ore hoisting system. This project includes the construction of the Wira Shaft, a vertical shaft which was completed in the fourth quarter of fiscal year 2025. The new hoisting system is expected to come online in the second half of fiscal year 2027 and is designed to extend the mine's life to at least 2040. The project involves an investment of US$0.9 billion.

Companies & Ownership (2)

Carrapateena

South Australia, Australia · Sublevel Caving

Operating
CopperGoldSilver
Commodities, grades and output
YearCommodityAv. GradeOutput
2023Copper-11700 kt
2023Gold-15304 oz
2023Silver-157000 koz
End year
2045
Workforce
approximately 700 (as of June 2024)
Overview
The Carrapateena mine produces copper concentrate containing gold and silver. A major development is the transition from the current sub-level caving mining method to a block cave for the lower half of the orebody, aiming to make the mine a multi-generational, low-cost operation.
Production
Production overview - 2023: copper 11700 kt, gold 15304 oz, silver 157000 koz.
Processing
Ore is processed on-site through conventional crushing, grinding, and flotation methods to produce concentrate. The processing plant includes a semi-autogenous grinding (SAG) mill and a ball mill. A second crusher (Crusher 2) was commissioned in the third quarter of FY2024 to enhance productivity from the sub-level cave. There are also plans for the commissioning of a HydroFloat coarse particle flotation (CPF) plant.
Equipment
semi-autogenous grinding (SAG) mill, ball mill, second crusher (Crusher 2), HydroFloat coarse particle flotation (CPF) plant
Expansion
The Carrapateena Expansion Project is focused on developing the lower half of the orebody into a block cave. This expansion is expected to unlock the mine's potential to be a long-life, low-cost operation. The development of the decline for the block cave was ongoing in FY2024. A major development is the transition from the current sub-level caving mining method to a block cave for the lower half of the orebody. This expansion aims to make the mine a multi-generational, low-cost operation.

Companies & Ownership (2)

Page 4 of 32 (766 total)