Minesites Directory

Browse minesites. Each card shows company ownership and their most recent associated articles.

Filter by mine details and commodity attributes.
Page 25 of 30 (705 total)
Sentinel

North-Western Province, Zambia · Open Pit

Operating
Copper
End year
2033
Mine life
19 years
Workforce
8,600 jobs
Overview
The Sentinel mine is an operational open-pit copper mine, part of the larger Trident project. Construction started in 2012, costing US$2.1 billion, with commercial production declared in November 2016.
Production
2018: 223,656 tonnes of copper; 2022: 242,000 tonnes of copper; 2024: 231,000 metric tons of copper; 2025 (preliminary): 189,000 tonnes of copper; 2026 (guidance): 190,000-220,000 tonnes of copper
Processing
55 million tonnes per annum throughput copper concentrator plant including milling, flotation, concentrate handling, and tails thickening
Equipment
world's largest steel-ball mills, semi-mobile rope shovels, in-pit crushing and conveying system, trolley-assist systems for haul trucks, automated drilling technology
Companies & ownership
  • First Quantum Minerals Ltd.
    TSX:FM
Kansanshi

North-Western Province, Zambia · Open Pit

Operating
CopperGold
Opened
2005-01-01
End year
2049
Mine life
44 years
Workforce
The mine employs more than 13,000 people. The S3 Expansion project created 1,800 jobs during construction and is expected to add approximately 800 to 900 permanent jobs. The expansion is expected to secure over 15,000 jobs in total, comprising 7,100 direct employees and 7,800 contractors.
Overview
The Kansanshi mine consists of three open pits with a new pit, the South East Dome, being developed. It is owned and operated by Kansanshi Mining PLC. First Quantum Minerals owns 80% of Kansanshi Mining PLC, and the state-owned ZCCM Investment Holdings holds the remaining 20%.
Production
For 2023, copper production was 134,827 tonnes. Production guidance for 2024 is 130,000 to 150,000 tonnes of copper and 65,000 to 75,000 ounces of gold. Once the S3 expansion is complete, copper production is expected to average about 250,000 tonnes per year, with potential to reach 280,000 tonnes per year.
Processing
The integrated metallurgical processing facility is undergoing a major expansion, known as the S3 Expansion. This includes a new standalone 25 million-tonne-a-year processing plant, which will increase the total yearly throughput to 53 million tonnes. The S3 processing train features a 28 MW semi-autogenous grinding mill and a 22 MW ball mill. First ore was fed through the S3 expansion in July 2025. The on-site smelter's throughput capacity is being increased from 1.38 million tonnes a year to 1.65 million tonnes a year of concentrate, enabling production of more than 400,000 tonnes per year of copper anode.
Equipment
The mining fleet includes new electric loading and drilling equipment and an extension of the electric trolley assist infrastructure. A full battery dump truck from Hitachi was shipped to the mine in January 2024 for technological feasibility trials.
Expansion
The S3 Expansion is a $1.25 billion investment to extend the mine life and increase production. This capital expenditure includes $900 million for the new processing plant and mine fleet, and $350 million for pre-stripping the South East Dome pit.
Companies & ownership
  • First Quantum Minerals Ltd.
    TSX:FM
  • Royal Gold, Inc.
    NYSE:RGLD
Quebrada Blanca - Future Expansions

Tarapacá Region, Chile · Open Pit

Feasibility
CopperMolybdenumSilver
Overview
Future expansions beyond the current QB2 project are in the conceptual stage. Concept-level studies were ongoing as of February 2026 to assess various options for developing the vast Quebrada Blanca resource, with further studies planned for 2026. Geometallurgical and geotechnical drilling was undertaken in 2025 to support these studies.
Companies & ownership
  • Teck Resources
Quebrada Blanca Optimization and Debottlenecking

Tarapacá Region, Chile · Open Pit

Operating
CopperMolybdenum
End year
2050
Mine life
27 years
Overview
Significant expansion (QB2) developing deeper sulphide resource, utilizing desalinated seawater, and featuring autonomous haul trucks. Ramping up to full production through 2023.
Production
Targeted 285,000 – 315,000 tonnes of annual copper production (2024-2026); 207,800 tonnes in 2024.
Processing
Concentrator plant (140,000 tonnes-per-day capacity) including crushing, milling, bulk flotation, thickening, and filtering.
Equipment
Caterpillar 794AC electric drive off-highway trucks, autonomous haul trucks
Companies & ownership
  • Teck Resources
San Nicolas Project

Zacatecas, Mexico · Open Pit

Feasibility
CopperZincGoldSilver
Opened
2026-01-01
End year
2041
Mine life
15 years
Overview
The San Nicolas Project is a copper-zinc development project located in Zacatecas, Mexico. It is a volcanogenic massive sulphide (VMS) deposit and is considered the largest undeveloped VMS deposit in Mexico.
Production
expected to produce an average of 63,000 tonnes of copper and 147,000 tonnes of zinc in concentrate per year for the first five years of operation
Processing
flotation plant to produce copper and zinc concentrates
Companies & ownership
  • Teck Resources
NuevaUnión

Atacama Region, Chile · Open Pit

Under Development
CopperGoldMolybdenumSilver
Mine life
32 years
Workforce
Approximately 4,000 jobs during construction and 1,400 jobs during operation.
Overview
Combines the former Relincho and El Morro (La Fortuna) projects, located approximately 40 kilometres apart. Considered one of the largest undeveloped copper-gold-molybdenum projects in the Americas.
Production
A 2018 pre-feasibility study indicated average annual production for the first five years of 224,000 tonnes of copper, 269,000 ounces of gold, and 1,700 tonnes of molybdenum. A PEA estimated an initial capacity of 90,000 to 110,000 tonnes per day, producing an average of approximately 190,000 tonnes of copper and 315,000 ounces of gold per year for the first 10 years.
Processing
Single-line mill and concentrator facility at the Relincho site, utilizing desalinated seawater.
Equipment
Conveyor, single-line mill and concentrator facility, desalinated seawater system, single concentrator plant, one tailings deposit.
Companies & ownership
  • Teck Resources
Zafranal Project

Arequipa, Peru · Open Pit

Under Development
CopperGoldSilver
Opened
2028-01-01
End year
2047
Mine life
19 years
Workforce
During construction: approximately 3,000 direct and 1,000 indirect jobs. Once operational: approximately 834 direct and 423 indirect jobs.
Overview
The Zafranal Project is a copper-gold project in the Arequipa region of southern Peru, a joint venture between Teck Resources Limited (80%) and Mitsubishi Materials Corporation (20%). It is currently under development, with regulatory approval received. Construction could start in 2025, with production commencing in 2028 or 2029.
Production
Average of 133,000 tonnes of copper in concentrate during the first five years of operation. Over the entire mine life, the average annual production is estimated to be 76,000 tonnes of copper and 29,000 ounces of gold.
Processing
Conventional concentration process with a plant capacity of up to 80,000 tonnes of ore per day, including primary crushing, grinding, flotation with regrinding, thickening, and filtering.
Equipment
Open-pit mine utilising truck and shovel operations. Processing plant includes primary crusher, grinding circuit, flotation circuit, thickening, filtering. Plans for two additional mobile crushers and a 3,600-metre-long tunnel with a conveyor belt.
Companies & ownership
  • Teck Resources
Galore Creek Project

British Columbia, Canada · Open Pit

Care And Maintenance
CopperGoldSilver
Mine life
20 years
Workforce
Approximately 1,200 direct employees once operational.
Overview
One of the world's largest undeveloped copper-gold-silver deposits, currently in the pre-feasibility stage.
Production
Approximately 60,000 tonnes of ore per day.
Processing
Conventional grinding and flotation circuit to produce a copper-gold concentrate with gold and silver credits. Ore processed through a single gyratory crusher, conveyed to a coarse ore stockpile, then to a single-line grinding and flotation concentrator.
Equipment
large haul trucks, shovels, and drills. Potential for a fully electric haulage fleet.
Companies & ownership
  • Teck Resources
HVC Mine Life Extension Project

British Columbia, Canada · Open Pit

Under Development
CopperMolybdenum
End year
2046
Mine life
18 years
Workforce
approximately 2,900 jobs during the construction phase; ongoing operations at Highland Valley Copper will maintain around 1,500 direct jobs, with the expansion projected to add about 200 jobs to the existing workforce
Overview
A brownfield extension of Teck Resources Limited's existing Highland Valley Copper (HVC) Operations, involving the extension of the Highmont and Valley open pits.
Production
average annual copper production of 132,000 tonnes over the life of the mine; projected to process an additional 900 million tonnes of ore to yield approximately 1.95 million tonnes of copper over the extended mine life
Processing
autogenous and semi-autogenous grinding and flotation to produce metal concentrates
Equipment
expansion of the mine fleet and upgrades to the grinding circuit
Companies & ownership
  • Teck Resources
Carmen de Andacollo

Coquimbo Region, Chile · Open Pit

Operating
CopperGold
Opened
1996-01-01
End year
2031
Workforce
622 permanent workers and 578 contract workers.
Overview
The Andacollo mine, officially named Carmen de Andacollo, is an open-pit copper and gold mine located in the Coquimbo Region of central Chile. It is situated approximately 350 kilometers north of Santiago.
Production
copper production of 39,000 tonnes in 2023, 40,000 tonnes in 2024, and projected 51,000 tonnes in 2025. Flotation plant capacity up to 55,000 tonnes of ore per day.
Processing
processing hypogene ore through a semi-autogenous grinding and flotation plant
Equipment
semi-autogenous grinding and flotation plant
Expansion
operational continuity project to extend mine life until 2031
Companies & ownership
  • Teck Resources
  • Royal Gold, Inc.
    NYSE:RGLD
Quebrada Blanca

Tarapacá Region, Chile · Open Pit

Operating
CopperMolybdenumSilver
End year
2050
Mine life
27 years
Workforce
Over 3,000 local workers, approximately 30% women, 42% from the Tarapacá Region
Overview
A large, open-pit copper and molybdenum mine located in the Tarapacá Region of northern Chile. The current operation, Quebrada Blanca Phase 2 (QB2), is an expansion developing the deeper sulphide resource with a major expansion of the open pit and a new concentrator. It uses 100% desalinated seawater for all production processes.
Production
Concentrator plant capacity of 140,000 tonnes per day. Production guidance for 2025 is between 210,000 and 230,000 metric tons of copper. QB2 project aims for an annual production of 316,000 tonnes of copper-equivalent for the first five full years of operation.
Processing
crushing, milling, and bulk flotation of the ore in a concentrator plant with a capacity of 140,000 tonnes per day, 100% desalinated seawater for all production processes, tailings storage facility
Equipment
Komatsu 930E-4SE haul trucks (291 tonnes capacity), Caterpillar 794AC electric drive off-highway trucks, autonomous haulage technology
Companies & ownership
  • Teck Resources
Antamina

Ancash Region, Peru · Open Pit

Operating
SilverCopperZincMolybdenum
Opened
2001-01-01
Overview
Franco-Nevada Corporation holds a silver stream on production from the Antamina mine, which is operated by Compañía Minera Antamina S.A. The stream agreement has an effective date of July 1, 2015.
Production
Annual silver stream contributions are expected to average 2.8 - 3.2 million ounces. For 2026, an increase in silver ounces to between 3.5 and 3.7 million is anticipated, compared to 3.2 million ounces sold in 2025.
Equipment
wholly owned mining infrastructure, including a concentrate pipeline and port facilities.
Companies & ownership
  • Teck Resources
  • Franco-Nevada Corporation
    TSX:FNV
Highland Valley Copper

British Columbia, Canada · Open Pit

Operating
CopperMolybdenum
Opened
1962-01-01
End year
2040
Workforce
approximately 1,500 employees
Overview
Highland Valley Copper (HVC) is a large open-pit mining operation located in British Columbia, Canada. It is considered the largest open-pit copper mine in Canada. Teck Resources Limited holds a 100% interest in the operation.
Production
2023: 99,000 tonnes of copper; 2024: 102,000 tonnes of copper; Mill capacity: 155,000 tonnes of ore per day; Anticipated average annual production (HVC MLE): 132,000 to 137,000 tonnes of copper
Processing
autogenous and semi-autogenous grinding followed by flotation
Equipment
electric shovels, haul trucks, autonomous haul trucks, in-pit crushers, covered conveyor belts, grinding mills, ball mills, froth flotation cells
Companies & ownership
  • Teck Resources
Gorontalo Project

Gorontalo Province, Indonesia · Open Pit

Under Development
CopperGold
Opened
2024-01-01
End year
2054
Mine life
30 years
Overview
The project is in the exploration and development phase, with production estimated to begin in 2024. Construction and Production Permits were approved in February 2019.
Production
The conceptual development model is to build a 25 million tonnes per annum (feed tonnes) copper concentration plant.
Processing
The planned processing method includes a copper concentration plant. One report also mentions the potential for a heap leach method.
Companies & ownership
  • PT Bumi Resources Tbk
Rupice Mine

Zenica-Doboj canton, Bosnia and Herzegovina · Underground

Operating
SilverZincLeadGoldCopperAntimony+1
End year
2039
Mine life
14 years
Overview
The Rupice mine, part of the Vares Silver Operation, is located near the town of Vares in the Zenica-Doboj canton of Bosnia and Herzegovina, approximately 50 kilometres north of Sarajevo. It is a fully-mechanised, trackless underground operation.
Production
Processing plant nominal capacity of 800,000 tonnes per annum.
Processing
Three-stage crushing, grinding, flotation, and filtration to produce a silver-lead concentrate and a zinc concentrate.
Equipment
Sandvik's AutoMine® Multi-Lite automation system, two operator stations, three Sandvik underground loaders (Toro® LH517i and Toro® LH514 units)
Companies & ownership
  • Adriatic Metals Plc
Vareš Silver Project

Zenica-Doboj Canton, Bosnia and Herzegovina · Underground

Operating
SilverGoldCopperLeadZinc
Commodities, grades and output
YearCommodityAv. GradeOutput
2025Silver-533400 oz
2025Gold-5900 oz
Opened
2025-07-01
End year
2040
Mine life
15 years
Autonomous haulage
Yes
Workforce
At the end of 2024, the Vareš operations had a workforce of 549 people. Approximately 27% of the mine's employees are women.
Overview
The Vareš Silver Project, also known as the Vareš Operation, is an active underground polymetallic mine located in the Zenica-Doboj Canton of Bosnia and Herzegovina, approximately 50 kilometres north of Sarajevo. It achieved commercial production on 1 July 2025 and comprises the Rupice underground mine and the historical Veovača open-pit deposit. The operation was originally developed by Adriatic Metals Plc and is now owned by DPM Metals Inc. following an acquisition in September 2025.
Production
Initial production guidance for 2024 targeted between 240,000 and 300,000 tonnes of ore mined. For the period of 3 September to 31 December 2025, 78,900 tonnes of ore were processed, yielding 533,400 ounces of silver and 5,900 ounces of gold, along with copper, lead, and zinc. The production forecast for 2026 is for 30,000 to 35,000 ounces of gold and 3.5 to 4.1 million ounces of silver.
Processing
The extracted ore is treated at the modern Vareš Processing Plant, which has a nameplate capacity of 800,000 tonnes per annum. The process involves a three-stage crushing circuit with a primary jaw crusher and secondary and tertiary cone crushers, followed by grinding in a ball mill and cyclones. Valuable minerals are then separated through flotation to produce silver-lead-gold and silver-zinc concentrates.
Equipment
The mine's equipment includes Sandvik Toro® LH517i and Toro® LH514 underground loaders, which are part of an AutoMine® Multi-Lite automation system with two operator stations.
Expansion
An expansion to increase the processing plant capacity from 800,000 tonnes per annum to 1.3 million tonnes per annum is under assessment, with a target of reaching this rate by 2027.
Companies & ownership
  • DPM Metals Inc.
    ASX:DPM
  • Adriatic Metals Plc
Loma Larga Project

Azuay province, Ecuador · Underground

Under Development
GoldSilverCopper
Mine life
11 years
Overview
Planned underground gold, silver, and copper mine in Ecuador, currently suspended due to legal challenges and community opposition during the permitting stage.
Production
Projected annual payable production to average approximately 173,000 gold equivalent ounces. Over mine life, expected to produce 1.9 million payable gold equivalent ounces. Processing plant designed to handle approximately 1.2 million tonnes of ore per year.
Processing
Crushing, grinding, and flotation circuit to produce copper and pyrite concentrates. Water management plan includes minimising freshwater use, maximising recycled water, wastewater treatment, and fully lined tailings and contact water storage ponds.
Equipment
underground mine, a 1.2 million tonnes per annum processing plant, a paste backfill plant, a filtered tailings storage facility, a water treatment plant, a diesel power plant, and upgrades to electrical infrastructure. New roads to connect the mine site, processing plant, and tailings storage facility.
Companies & ownership
  • DPM Metals Inc.
    ASX:DPM
Čoka Rakita Project

eastern Serbia, Serbia · Underground

Under Development
GoldCopper
Opened
2029-01-01
End year
2039
Mine life
10 years
Workforce
Expected to create over 500 jobs; pre-feasibility study indicated a workforce of 328 employees in the second year of the life of mine plan.
Overview
A gold project, with exploration activities also confirming the presence of a large copper-gold system in the broader Rakita camp.
Production
Average life of mine gold production is expected to be approximately 148,000 ounces per year. For the first five full years of production, the average output is projected to be 189,000 ounces per year. Probable Mineral Reserve is 7.4 million tonnes of diluted ore, grading 6.44 g/t of gold, containing approximately 1.52 million ounces of gold.
Processing
standard comminution, gravity, and flotation flowsheet with a capacity to process 850,000 tonnes of ore per year, producing saleable gravity and flotation gold concentrates. A portion of the gravity concentrate will be smelted on-site to produce doré.
Equipment
twin declines, spiral ramp, maintenance bay, welding bay, warehouse, fuel-lube bay, explosives and detonator magazines, office, processing equipment and infrastructure from DPM's Ada Tepe operation
Companies & ownership
  • DPM Metals Inc.
    ASX:DPM
Lobo-Marte Project

Atacama Region, Chile · Open Pit

Under Development
GoldCopper
Opened
2027-01-01
End year
2043
Mine life
16 years
Overview
Gold development project in the Maricunga district of the Atacama Region, Chile, located approximately 160 kilometres east of Copiapó at an elevation of around 4,200 metres. The project comprises two adjacent porphyry gold deposits, Lobo and Marte, which are situated 7 kilometres apart.
Production
4.7 million ounces of gold equivalent (life-of-mine)
Processing
heap leach, SART plant
Equipment
crushing and storage facilities, rope conveyors, mine fleet
Companies & ownership
  • Kinross Gold Corporation
    TSX:K · NYSE:KGC
Libby Exploration Project

Montana, United States · Underground

Under Development
CopperSilver
Commodities, grades and output
YearCommodityAv. GradeOutput
2024Copper0.7 %-
2024Silver1.6 oz/t-
End year
2041
Mine life
16 years
Workforce
30 to 35 jobs during the exploration phase
Overview
The Libby Exploration Project, formerly known as Montanore, is a 100% owned underground silver and copper exploration and evaluation initiative by Hecla Mining Company, through its wholly-owned subsidiary Montanore Minerals Corporation. It is located in Lincoln County, approximately 20 aerial miles south of the town of Libby. The project's objective is to conduct underground exploration to assess the feasibility for a potential future mine by collecting data on mineralisation, geology, and hydrology. The U.S. Forest Service issued a final approval for the Plan of Operations on 3 October 2025. However, in March 2026, a coalition of environmental groups filed a lawsuit challenging the federal approval, citing concerns over the environmental review process and potential impacts on wildlife and the Cabinet Mountains Wilderness.
Expansion
The current Plan of Operations involves dewatering and rehabilitating an existing 7,000-foot adit. The plan includes extending this tunnel by an additional 4,200 feet and constructing more tunnels for exploration purposes. To manage waste rock, the company plans to expand the existing storage area and build a second site.
Companies & ownership
  • Hecla Mining Company
    NYSE:HL
Hammond Reef Gold Project

Ontario, Canada · Open Pit

Care And Maintenance
GoldCopperLeadSilver
Mine life
11 years
Overview
The Hammond Reef Gold Project is an open-pit gold project located in Northwestern Ontario, Canada, 30 km northeast of Atikokan. It is currently in care and maintenance with ongoing studies and permitting, having received federal and provincial environmental approval.
Production
60,000 tonnes per day
Processing
On-site metal mill with an ore input capacity of 60,000 tonnes per day, using conventional milling.
Equipment
ore processing facility
Companies & ownership
  • Agnico Eagle Mines Limited
    TSX:AEM · NYSE:AEM
San Nicolás

Zacatecas, Mexico · Open Pit

Feasibility
CopperZincGoldSilver
Mine life
15 years
Overview
Project San Nicolás is a copper-zinc development project located in Zacatecas, Mexico. It is operated as a 50/50 joint venture between Agnico Eagle Mines Limited and Teck Resources Limited. Agnico Eagle acquired its 50% interest in the project in April 2023. The project is currently in the permitting and engineering stage.
Production
For the first five years, production is expected to be 63,000 tonnes of copper and 147,000 tonnes of zinc in concentrate annually.
Processing
flotation
Companies & ownership
  • Agnico Eagle Mines Limited
    TSX:AEM · NYSE:AEM
Upper Beaver Project

Ontario, Canada · Underground

Under Development
GoldCopper
Mine life
13 years
Workforce
1,200 to 1,400 positions at production; 200 in training program.
Overview
A proposed underground and open-pit mine. The open-pit is planned to operate for the first four to five years to address a rock stability issue related to historical underground development. As of July 2024, the project entered the advanced exploration phase, which includes developing an exploration ramp and shaft to collect bulk samples and facilitate further drilling.
Production
Potential to produce an annual average of approximately 210,000 ounces of gold and 3,600 tonnes of copper. Maximum ore production capacity of the mine is proposed to be 15,000 tonnes per day.
Processing
The proposed on-site metal mill will have a maximum ore input capacity of approximately 10,000 tonnes per day.
Equipment
Exploration ramp and shaft (160m and 760m deep), shaft headframe, service and production hoists, on-site metal mill, processing facility, water treatment plant.
Companies & ownership
  • Agnico Eagle Mines Limited
    TSX:AEM · NYSE:AEM
LaRonde Complex

Quebec, Canada · Underground

Operating
GoldSilverZincCopper
Opened
1988-01-01
End year
2034
Workforce
1,042 workers
Overview
The LaRonde Complex is an active, producing operation located in the Abitibi-Témiscamingue region of northwestern Quebec, Canada, consisting of the underground LaRonde mine and the underground LaRonde Zone 5 (LZ5) mine.
Production
Projected 344,555 ounces of gold in 2025. LaRonde concentrator processing capacity of 7,000 metric tonnes per day, total facility capacity of 9,000 metric tonnes per day. Over 8 million ounces of gold produced to date.
Processing
Primary and secondary crushing, copper and zinc flotation, cyanide leaching, carbon-in-pulp circuit for gold recovery, stripping, electrowinning, refining, filtered tailings management.
Equipment
Penna Shaft, internal shaft, ramp, network of conveyors, crushers, ventilation systems, cooling plant
Companies & ownership
  • Agnico Eagle Mines Limited
    TSX:AEM · NYSE:AEM