The Mokopane Feeder Project

Limpopo, South Africa · Underground

Under Development
PlatinumPalladiumRhodiumGoldNickelCopper
Companies & ownership
  • Ivanhoe Mines Ltd.
    TSX:IVN · OTC:IVPAF
Platreef PGM-Nickel Mine

Limpopo Province, South Africa · Underground

Operating
PlatinumPalladiumRhodiumNickelCopperGold
Opened
2025-01-01
End year
2060
Mine life
35 years
Workforce
550 permanent and contract workers (2021); 90% of employees covered by collective bargaining agreement (2024).
Overview
Tier-one project operated by Ivanhoe Mines through its South African subsidiary, Ivanplats (64% interest). Located in Limpopo Province, South Africa, near Mokopane, on the Northern Limb of the Bushveld Igneous Complex.
Production
Phase 1: 113,000 oz 3PE+Au, 5M lbs nickel, 3M lbs copper. Phase 2: 450,000 oz 3PE+Au, >30M lbs nickel and copper. Phase 3: >1M oz 3PE+Au.
Processing
Concentrator plant. Phase 1: 770 ktpa milling capacity. Phase 2: adds 3.3 Mtpa concentrator module (total 4.1 Mtpa). Potential Phase 3: increases capacity to 10.7 Mtpa. Produces concentrate of platinum, palladium, nickel, rhodium, gold, and copper.
Equipment
Shaft 1 (7.25m diameter, 2.5 Mtpa hoisting); Shaft 2 (10m diameter, 6 Mtpa hoisting); Shaft 3 (operational by April 2026, increasing hoisting to 5 Mtpa). Large, mechanised operation.
Expansion
Project developed in three phases. Phase 2 expansion targeted for completion in Q4 2027. Potential Phase 3 expansion to increase processing capacity to 10.7 Mtpa.
Companies & ownership
  • Ivanhoe Mines Ltd.
    TSX:IVN · OTC:IVPAF
Kamoa-Kakula Copper Complex

Lualaba Province, Democratic Republic of Congo · Underground

Operating
Copper
End year
2054
Mine life
33 years
Workforce
Approximately 4,700 in Sept 2020; 10,800 by end of 2021; 6,000 full-time in Feb 2025. Smelter operating team: 982 personnel.
Overview
The Kamoa-Kakula Copper Complex is an operating underground copper mine in the Lualaba Province of the Democratic Republic of Congo, located approximately 25 kilometres west of Kolwezi. It is a joint venture with Ivanhoe Mines holding a 39.6% interest.
Production
2021: 105,884 tonnes copper in concentrate; 2022: 333,497 tonnes copper; 2023: 393,551 tonnes copper in concentrate. 2024 guidance: 440,000-490,000 tonnes copper in concentrate. 2025 guidance: 520,000-580,000 tonnes copper in concentrate. 2026 guidance: 380,000-420,000 tonnes copper. Smelter capacity: 500,000 tonnes blister copper annually.
Processing
Multiple concentrator plants and a direct-to-blister smelter. The concentrators utilise ball mills manufactured by CITIC Heavy Industries (9.75m long, 6.1m wide, driven by 7 MW variable-speed-drive motors from WEG Industries). The processing plant also includes high-pressure grinding rolls, flotation cells, thickeners, slurry pumps, regrind mills, and concentrate filters. An on-site direct-to-blister copper smelter, the largest in Africa, has a processing capacity of approximately 1.2 million tonnes of dry concentrate feed and is designed to produce 500,000 tonnes of blister copper annually.
Equipment
Fleet of equipment from Epiroc, including: Minetruck MT65 S haulers with a 65-tonne payload, Scooptram ST18 S loaders with an 18-tonne payload, Boomer 282 face drilling rigs, Simba E70 S production drilling rigs.
Expansion
Phased expansions have led to increased production.
Companies & ownership
  • Ivanhoe Mines Ltd.
    TSX:IVN · OTC:IVPAF
Jump Up Dam

Western Australia, Australia · Open Pit

Feasibility
NickelCobaltCopper
Overview
Part of Ardea Resources' Kalgoorlie Nickel Project (KNP), associated with an Archaean ultramafic complex. Drilling identified a nickel laterite resource and a 400-metre long copper-nickel enrichment zone.
Production
Nickel laterite resource of 64Mt at 0.75% nickel and 0.04% cobalt, containing 479kt of nickel and 26.1kt of cobalt.
Companies & ownership
  • Ardea Resources Limited
    ASX:ARL
Bulong Nickel Project

Western Australia, Australia · Open Pit

Under Development
NickelCobaltPlatinumCopperLeadZinc
Overview
The project is part of Ardea Resources' Kalpini Hub, which is a component of the broader Kalgoorlie Nickel Project (KNP). Ardea Resources holds 100% of the non-gold mineral rights for the Bulong tenements. The project is at an exploration and resource definition stage and is not currently an active mining operation.
Production
As of February 2021, the Bulong nickel laterite resource contained 54 million tonnes at 0.88% nickel and 0.053% cobalt, including an inferred resource at Bulong Taurus of 14 million tonnes at 0.84% nickel and 0.051% cobalt.
Processing
historical processing plant used a pressure acid leach process
Equipment
non-operating Bulong nickel laterite plant located on the site from previous, historical operations
Companies & ownership
  • Ardea Resources Limited
    ASX:ARL
Elang project

Sumbawa Island, Indonesia · Open Pit

Under Development
CopperGold
Companies & ownership
  • PT Amman Mineral Internasional Tbk
    ASX:AMMN
Batu Hijau mine

West Nusa Tenggara, Indonesia · Open Pit

Operating
CopperGold
Companies & ownership
  • PT Amman Mineral Internasional Tbk
    ASX:AMMN
Skouries

Halkidiki Peninsula, Greece · Open Pit

Under Development
GoldCopper
Companies & ownership
  • Eldorado Gold Corporation
Mount Zephyr Gold Project

Western Australia, Australia · Open Pit

Under Development
GoldNickelCopperPlatinumPalladium
Overview
Active exploration project located in the Northern Goldfields of Western Australia, approximately 60 kilometres north-northeast of Leonora, within the Mount Zephyr greenstone belt.
Equipment
aircore and reverse circulation (RC) drill rigs; high-resolution aeromagnetic and ground gravity survey data
Companies & ownership
  • Ardea Resources Limited
    ASX:ARL
Perrinvale Nickel Sulphide Project

Western Australia, Australia · Underground

Feasibility
NickelCopperPlatinumGoldZincSilver+1
Overview
Early-stage exploration project located approximately 260km northwest of Kalgoorlie in the Yilgarn Craton of Western Australia. It comprises nine exploration licenses and one miscellaneous license, totalling 306 square kilometres. Ardea Resources commenced exploration, identifying nickel-copper sulphide potential. Cobre Limited later acquired the project and continued exploration, defining a maiden JORC-2012 Mineral Resource Estimate for the Schwabe Deposit in April 2023.
Companies & ownership
  • Ardea Resources Limited
    ASX:ARL
Bonya Project

Northern Territory, Australia · Open Pit

Under Development
TungstenCopper
Overview
The Bonya project is an exploration-stage joint venture located in the Northern Territory, Australia, approximately 280 to 350 kilometres north-east of Alice Springs. The project's tenements are prospective for tungsten and copper. Arafura Rare Earths holds a 60% interest in the Bonya joint venture, with Thor Mining PLC acting as project manager and operator. The project is in the exploration and resource definition phase.
Companies & ownership
  • Arafura Rare Earths Limited
    ASX:ARU
Reko Diq Copper-Gold Project

Balochistan, Pakistan · Open Pit

Under Development
CopperGold
Commodities, grades and output
YearCommodityAv. GradeOutput
2022Copper0.41 %-
2022Gold0.22 g/t-
End year
2066
Mine life
37 years
Capex (est.)
USD 5.60B
Workforce
Approximately 7,500 during peak construction, 4,000 long-term jobs once in production.
Overview
Reko Diq is one of the world's largest undeveloped copper-gold deposits. An updated feasibility study for the project has been completed. Barrick announced in March 2026 it was slowing development and extending its review period by 12 months from July due to security concerns, impacting budgets and timelines. The original target for first production was 2028. The project is planned as a truck-and-shovel open-pit operation.
Production
Phase 1 projected to produce 200,000-250,000 tonnes of copper and 300,000 ounces of gold annually. Phase 2 expected to increase output to 400,000 tonnes of copper and 500,000 ounces of gold per year. Life of mine yield: 13.1 million tonnes of copper and 17.9 million ounces of gold.
Processing
Two-phase construction of processing facilities. Phase 1 capacity: 45 Mtpa; combined capacity after Phase 2: 80-90 Mtpa. Facilities will produce high-quality copper-gold concentrate, transported by rail to Port Qasim in Karachi for export.
Equipment
Fluor Corporation (EPCM partner); Metso, Weir, and Komatsu (processing and mining equipment suppliers).
Companies & ownership
  • Barrick Gold Corporation
    TSX:ABX · NYSE:B
  • Government of Balochistan
  • Government Holdings (Private) Limited (GHPL)
  • Pakistan Petroleum Limited (PPL)
  • Oil and Gas Development Company Limited (OGDCL)
Zaldívar

Antofagasta Region, Chile · Open Pit

Operating
Copper
Commodities, grades and output
YearCommodityAv. GradeOutput
2025Copper0.38 %62000000 t
2023Copper-40500 t
2022Copper-89000 t
2017Copper-228000000 lbs
2009Copper-136984 t
2005Copper-123379 t
2004Copper1 %147602 t
Opened
1995-01-01
End year
2051
Mine life
14 years
Capex (est.)
USD 1.20B
Workforce
3,102 workers, including contractors (as of 2023).
Overview
The Zaldívar mine is an open-pit, heap-leach copper mine located in the Andean Precordillera in the Antofagasta Region of northern Chile. It is situated approximately 1,400 kilometres north of Santiago and about 175-196 kilometres southeast of the port city of Antofagasta, at an altitude of 3,000 to 3,300 metres. The mine is a 50/50 joint venture between Barrick Gold Corporation and Antofagasta Plc; Antofagasta is the operator. The mine, which commenced production in 1995, produces high-grade copper cathodes.
Production
Production overview - 2025: copper 62000000 t; 2023: copper 40500 t.
Processing
The mine recovers copper through heap leaching of crushed ore, followed by solvent extraction and electrowinning (SX-EW) to produce copper cathodes. The processing infrastructure includes a primary gyratory crusher, secondary cone crushers, and tertiary crushers. An electrowinning plant was modified to increase its capacity to 150,000 tonnes of cathode copper per year. The approved mine life extension allows for the future development of primary sulphide ore.
Equipment
truck and shovel fleet, primary gyratory crusher, secondary cone crushers, water-flush tertiary crushers, flotation plant, electrowinning plant, 16 Alfa Laval plate heat exchangers, 95-metre steel dome
Expansion
In May 2025, the Chilean Environmental Authority approved an Environmental Impact Assessment (EIA) to extend the mine's life until 2051. This extension includes a plan to transition the mine's water source from the local aquifer to either seawater or a third-party source, which will follow a transition period extending the current water extraction permit from 2025 to 2028. The project, which involves developing a deep primary sulphide ore body, has a proposed investment of $1.2 billion over the life of the mine.
Companies & ownership
  • Barrick Gold Corporation
    TSX:ABX · NYSE:B
  • Antofagasta Plc
Lumwana mine

North-Western Province, Zambia · Open Pit

Operating
Copper
Commodities, grades and output
YearCommodityAv. GradeOutput
2025Copper-151000 t
Opened
2009-01-01
End year
2057
Mine life
48 years
Capex (est.)
USD 2.00B
Workforce
As of October 2025, 1,882 direct employees and 2,054 contracted labour. Expansion expected to add 550 permanent roles and 2,500 construction workers by 2028.
Overview
The Lumwana mine, operated by Barrick Gold Corporation, is a conventional open-pit, truck and shovel copper operation located in the North-Western Province of Zambia. The Lumwana Super Pit Expansion project is underway to extend its operational life and increase production.
Production
Production overview - 2025: copper 151000 t.
Processing
Conventional sulfide flotation plant to produce copper concentrate, with throughput doubling from 27 Mtpa to 52 Mtpa due to expansion.
Equipment
Upgraded ultra-class fleet including SANY excavators (SY750H, SY500H), SANY mining trucks (SRT95C), SANY truck crane (STC500), Siemens truck trolley system with Hitachi 4500 trucks, and 62 Komatsu 930E-5 haul trucks (delivery 2023-2025).
Expansion
Lumwana Super Pit Expansion project is underway, with construction expected to have commenced in 2025 and first production from the expansion scheduled for 2028. The expansion aims to double the processing plant's throughput from 27 Mtpa to 52 Mtpa.
Companies & ownership
  • Barrick Gold Corporation
    TSX:ABX · NYSE:B
Jabal Sayid

Al Madinah Province, Saudi Arabia · Underground

Operating
Copper
Commodities, grades and output
YearCommodityAv. GradeOutput
2025Copper-64000 t
2024Copper-65000 t
2023Copper-130000000 lbs
2022Copper-150700000 lbs
Workforce
The mine has a multinational workforce with employees from countries including Egypt, Zambia, Australia, New Zealand, Indonesia, the United Kingdom, Ireland, the Philippines, Tanzania, Ghana, and Saudi Arabia.
Overview
The Jabal Sayid mine is located 350 kilometres north-east of Jeddah. It is an underground operation using large-scale longhole open stoping, with a combination of cemented rock fill and paste fill. The project extracts approximately 3 million tonnes of ore per year. In 2025, the mine switched from diesel generators to grid power. As of 31 December 2025, Barrick's 50% share of proven and probable copper reserves was 0.25 million tonnes.
Production
Production overview - 2025: copper 64000 t; 2024: copper 65000 t.
Processing
The processing method involves conventional flotation to produce a copper concentrate. The mine utilises a Barrick-patented air-metabisulfate process which does not require cyanide, lime, or fresh water, and processes copper concentrate using 100 percent wastewater. In January 2026, the Saudi government launched an initiative to build a 75-kilometre treated-water pipeline to support the Jabal Sayid area, which is expected to reduce water supply costs by up to 60 percent.
Equipment
The underground mining fleet is composed of Sandvik machines, including nine TH663i and three TH663 trucks, seven LH621i and one LH621 LHDs, four DL421 production drills, and three DD421 development rigs. A Rhino 100HM boxhole borer is also used.
Expansion
An expansion project is underway with the development of the Lode 1 orebody, located less than a kilometre from the existing lode. Extensive underground capital development for the extension was completed in 2024, along with upgrades to ventilation and the paste plant. Stoping at Lode 1 commenced in the third quarter of 2023. Commissioning of the paste plant began in the second quarter of 2024. Barrick and Ma'aden also signed joint venture agreements in January 2023 for exploration at the Jabal Sayid South and Umm Ad Damar license areas.
Power sources
GridDiesel
Water sources
Recycled/Reclaimed
Companies & ownership
  • Barrick Gold Corporation
    TSX:ABX · NYSE:B
  • Saudi Arabian Mining Company (Ma'aden)
Phoenix

Nevada, United States · Open Pit

Operating
GoldSilverCopper
Opened
1985-01-01
End year
2040
Workforce
approximately 500 employees
Overview
The Phoenix mine, also referred to as the Fortitude/Reona (Phoenix) Project, is an active open pit mining operation in the United States. It is located in Lander County, Nevada, approximately 13 miles south of the town of Battle Mountain. The project is situated within the historic Battle Mountain Mining District.
Production
average mining rate of approximately 110,000 tons per day; processing capacity of 48,000 tons per day and 20,000,000 tons per year; attributable gold production (Barrick's 61.5% share) was 27,000 ounces from a total production of 44,000 ounces in Q2 2025.
Processing
multi-stage beneficiation facility with a capacity of 48,000 tons per day and 20,000,000 tons per year, including a crushing and grinding circuit, a gravity separation facility, a dedicated cyanide leaching facility for gold and silver, a flotation mill, a carbon-in-leach plant, a copper leach pad, and a solvent extraction-electrowinning (SX-EW) plant.
Equipment
fleet of haul trucks, truck and shovel/loader
Expansion
A proposed expansion, the Greater Phoenix Project, aims to extend the mine life from 2040 to 2063 by consolidating five existing pits into an expanded Phoenix Pit and increasing its depth.
Companies & ownership
  • Barrick Gold Corporation
    TSX:ABX · NYSE:B
Whyalla Quarry

South Australia, Australia · Quarry

Operating
Silica SandGraphiteKaolinHalloysiteTitaniumIron Ore (Magnetite)+39
Overview
The Boral Whyalla Quarry is a hard rock quarry owned and operated by Boral Limited, located just outside Whyalla, South Australia. It is an active, operational quarry and a strategic mineral resource area, co-located with a Boral concrete plant. The quarry supplies a range of high-quality construction materials for regional projects and infrastructure development.
Companies & ownership
  • Boral Limited
    ASX:BLD
Stirling North Quarry

South Australia, Australia · Quarry

Operating
GraphiteSilica SandKaolinHalloysiteTitaniumIron Ore (Magnetite)+39
Workforce
The operation has a workforce of less than 10 full-time employees.
Overview
The Stirling North Quarry, owned and operated by Boral Limited, is an active open-cut quarry in South Australia. Located approximately 5 km northeast of Stirling North township, it operates under Private Mine tenement 154 with an approved Mine Operation Plan as of December 2023. The quarry has been operational since the mid-1970s.
Processing
The general process involves extraction, crushing, and screening to produce various sizes of quarry products, including thermal sand for the Lincoln Gap Wind Farm.
Equipment
The primary equipment includes a main processing plant and a contractor screen.
Companies & ownership
  • Boral Limited
    ASX:BLD
Lobethal Quarry

South Australia, Australia · Open Pit

Operating
GraphiteSilica SandKaolinHalloysiteTitaniumIron Ore (Magnetite)+39
Overview
The Lobethal Quarry, operated by Boral Limited, is an active open-cut quarry located in Lobethal, South Australia. It is considered a strategic mineral resource area and supplies construction materials such as aggregates, asphalt, cement, crushed rock, and roadbase to the Adelaide Hills region.
Production
The quarry produces aggregates, rail ballast, pre-mix concrete, and road materials.
Processing
The quarry underwent a $4 million plant upgrade in 2015, transforming it into a more automated and efficient operation for producing construction materials.
Equipment
The quarry underwent a $4 million plant upgrade in 2015, transforming it into a more automated and efficient operation. It is recognised as one of the cleanest and safest fixed plant areas within Boral's South Australian business.
Companies & ownership
  • Boral Limited
    ASX:BLD
Kapunda Quarry

South Australia, Australia · Quarry

Operating
Silica SandGraphiteKaolinHalloysiteTitaniumIron Ore (Magnetite)+39
Overview
Boral's Kapunda Quarry, an operating site in Kapunda, South Australia, produces aggregates, rail ballast, pre-mix concrete, and road materials, and is a strategic mineral resource area. The broader Kapunda site also includes Australia's first commercially successful metal mine, which produced copper from 1844 to 1879 and is now a State Heritage Place. Environmental Copper Recovery Pty Ltd (ECR) and Terramin Australia Limited are advancing the Kapunda Copper & Gold ISR Project on the historic mine site, with technical collaboration from OZ Minerals.
Expansion
The Kapunda Copper & Gold ISR Project, a joint venture between Environmental Copper Recovery Pty Ltd (ECR) and Terramin Australia Limited, aims to extract an estimated 119,000 tonnes of copper from shallow oxide ores using in-situ recovery methods. In May 2025, the South Australian Department for Energy and Mining approved in-ground test work for the project, which also has potential for gold recovery.
Companies & ownership
  • Boral Limited
    ASX:BLD
Nueltin Lake Project

Nunavut, Canada · Underground

Under Development
UraniumGoldMolybdenumCopperTungstenCobalt+1
Workforce
anticipated to be between two and nine people, including a two-person drill crew, a drill foreman, geologists, and two two-person mapping crews.
Overview
The Nueltin Lake project is an exploration-stage undertaking located in the Kivalliq Region of southern Nunavut, Canada, just north of the Manitoba border. It is a joint venture between URU Metals Limited and Cameco Corporation. The project is focused on exploring for polymetallic deposits, with target commodities including uranium, gold, molybdenum, copper, tungsten, cobalt, and nickel.
Equipment
helicopter-mobilised drill (heli-drill)
Expansion
joint venture between URU Metals Limited and Cameco Corporation; option agreement was entered into where URU Metals could earn into the project by funding exploration activities.
Companies & ownership
  • Cameco Corporation
    TSX:CCO · NYSE:CCJ
Stonyfell Quarry

South Australia, Australia · Quarry

Operating
Silica SandGraphiteKaolinHalloysiteTitaniumIron Ore (Magnetite)+39
Opened
1837-01-01
Mine life
100 years
Workforce
The quarry's management team includes a Quarry Manager, a Quarry Support Manager, and an Operations Manager Quarries.
Overview
Stonyfell Quarry, located in the foothills of the Mount Lofty Ranges east of Adelaide, South Australia, is one of Adelaide's oldest quarries, operating since 1837. Boral Limited acquired the site in the 1980s. The quarry extracts sandstone and quartzite to produce road base, aggregates, crushed rock, washed sands for concrete manufacturing, fill materials, and specialty rocks. It also recycles concrete and is considered a significant state resource with at least 100 years of available materials.
Production
Produces road base, aggregates, crushed rock, washed sands for concrete manufacturing, fill materials, specialty rocks, and recycled concrete. Primary materials extracted are sandstone and quartzite.
Processing
The processing infrastructure at Stonyfell Quarry includes a primary crusher and a sprinkler system within the crushing plant to manage dust. The facility produces road base, aggregates, crushed rock, washed sands for concrete manufacturing, fill materials, and specialty rocks from extracted sandstone and quartzite.
Equipment
The processing infrastructure at the site includes a primary crusher and a sprinkler system within the crushing plant to manage dust. Other equipment includes a water cart for spraying roads and stockpiles, and a truck wash.
Expansion
Major capital improvement works were undertaken to upgrade the primary crusher, which involved installing a new steel structure and a heavy-duty concrete slab.
Companies & ownership
  • Boral Limited
    ASX:BLD
Boral Concrete Rockhampton

Queensland, Australia · Processing Facility

Operating
GraphiteSilica SandKaolinHalloysiteTitaniumIron Ore (Magnetite)+39
Overview
The Boral Concrete Rockhampton facility is an operational concrete batching plant located at 36-40 Johnson Street in Parkhurst, Rockhampton, Queensland. Operated by Boral Limited, this processing facility produces and supplies ready-mixed concrete for the Central Queensland construction market.
Processing
The facility is a concrete batching plant that produces and supplies ready-mixed concrete.
Companies & ownership
  • Boral Limited
    ASX:BLD
Pinyon Plain Project

Arizona, United States · Underground

Operating
UraniumCopper
Mine life
2.67 years
Workforce
60 employees
Overview
The Pinyon Plain Project, formerly known as the Canyon Mine, is a fully permitted and operating underground uranium and copper mine in Coconino County, Arizona, United States. It is located in the Kaibab National Forest, approximately 6 miles southeast of the town of Tusayan.
Production
Planned maximum annual production rate is 109,500 tons of uranium ore. In April 2025, the mine produced 4,604 tons of ore containing approximately 151,400 pounds of uranium. For the full year 2025, the mine produced ore containing approximately 1,530,000 pounds of U3O8.
Processing
Mineralised material is hoisted to the surface and stockpiled on an ore pad before being transported to Energy Fuels' White Mesa Mill in Blanding, Utah, for processing.
Equipment
shaft, a headframe, hoist, compressor, a lined ore pad, and a ventilation shaft
Companies & ownership
  • Energy Fuels Inc.
    TSX:EFR · NYSE:UUUU