← Map view|Directory

Directory

Browse minesites, mining companies and suppliers. Use the tabs below to switch sections.

Minesites Directory

Browse minesites. Each card shows company ownership and their most recent associated articles.

Filter by mine details and commodity attributes.
Page 18 of 30 (705 total)
Grasberg Block Cave Underground Mine

Central Papua, Indonesia · Block Cave

Operating
CopperGoldSilver
Opened
2019-01-01
End year
2041
Workforce
75 female remote equipment operators. The entire Grasberg minerals district employed approximately 27,000 people (including contractors) as of December 2021.
Overview
The Grasberg Block Cave (GBC) is an underground copper and gold mine in the Sudirman Mountain Range of Central Papua, Indonesia, operated by PT Freeport Indonesia. It uses the block caving method, targeting the ore body previously mined by the Grasberg open pit. It began ore extraction in 2019.
Production
Planned production rate of approximately 160,000 tonnes per day. Achieved a record daily production of 151,582 tons of copper ore in July 2023.
Processing
Ore is crushed and ground, then processed by flotation using alcohol and lime to separate copper, gold, and silver concentrates. The complex includes four crushers and two large semi-autogenous grinding (SAG) units.
Equipment
Mixed fleet of 10-15 metric ton LHD loaders and 55-60 metric ton haul trucks (32 loaders, 16 remote-controlled), fully autonomous mobile rockbreakers, automated rail haulage system, three-gyratory crusher complex, dual inclined conveyors, ventilation system, and pumping system.
Expansion
Operations temporarily suspended in September 2025, expected to restart in Q2 2026.
Companies & ownership
  • PT Freeport Indonesia
Quévillon Project

Québec, Canada · Underground

Under Development
GoldSilverCopperZinc
Workforce
potential for 350 permanent jobs (combined with Windfall)
Overview
Exploration and resource definition stage project covering 150,163 hectares, including the Osborne-Bell deposit 15-17 km northwest of Lebel-sur-Quévillon. A PEA for combined development with Windfall was completed in 2018.
Production
3,200 tonnes per day (combined with Windfall)
Processing
central gold processing mill; 93% recovery
Expansion
2018 PEA for combined development with Windfall deposit
Companies & ownership
  • Osisko Mining Inc.
    TSX:OSK.TO
Mount Royal

New South Wales, Australia · Open Pit

Feasibility
CopperGold
Overview
Mount Royal was a copper-gold prospect, not an operational mine, for Mincor Resources. It is part of the larger Tottenham Copper-Gold Project, located near the town of Tottenham in central New South Wales, Australia. Mincor's activities focused on exploration and resource definition, including drilling and surveys. A maiden Indicated and Inferred Mineral Resource was announced in 2008. A scoping study in 2012 indicated positive cash flow potential but insufficient to cover estimated establishment costs. Mincor sold its 70% interest in the Tottenham Project to Locksley Resources Limited in July 2021.
Processing
heap leaching and solvent extraction/electrowinning
Companies & ownership
  • Mincor Resources NL
Carolina

New South Wales, Australia · Underground

Feasibility
CopperGold
Overview
The Carolina project is a copper-gold deposit located in the Lachlan Fold Belt of New South Wales, Australia, near the town of Tottenham. It is situated within a geological setting known for Volcanic Hosted Massive Sulphide (VHMS) mineralisation. It was a resource-level exploration project under Mincor's management.
Expansion
In 2017, Bacchus Resources Pty Ltd entered into an earn-in and joint venture agreement with Mincor for the Tottenham Project. Subsequently, on 20 April 2021, Mincor Resources executed a tenement sale agreement to sell its 70% interest in the Tottenham Project, which includes the Carolina deposit, to Locksley Resources Limited.
Companies & ownership
  • Mincor Resources NL
Tottenham Copper-Gold Project

New South Wales, Australia · Open Pit

Feasibility
CopperGold
Overview
The Tottenham Copper-Gold Project is an exploration-stage project located in the Lachlan Fold Belt of New South Wales, Australia. Mincor Resources defined it as a copper and gold project and spent over $6 million on exploration activities, leading to mineral resource estimates. It was considered a non-core asset for Mincor.
Processing
heap leaching and solvent extraction/electrowinning
Expansion
In 2017, Mincor entered into an earn-in and joint venture agreement with Bacchus Resources Pty Ltd. In April 2021, Mincor Resources sold its interest in the project to Locksley Resources Limited.
Companies & ownership
  • Mincor Resources NL
Durkin North Mine

Western Australia, Australia · Underground

Care And Maintenance
NickelCopper
Mine life
5 years
Workforce
more than 200 jobs during operations
Overview
The Durkin North Mine is an underground nickel and copper mine located in the Kambalda district of Western Australia, Australia. It is part of the Kambalda Nickel Operations (KNO), which also include the Long North mine, collectively referred to as the Northern Operations. The mine is situated approximately 60 kilometres south of Kalgoorlie.
Processing
Ore transported to BHP's Kambalda Nickel Concentrator for processing under an Ore Tolling and Concentrate Purchase Agreement.
Equipment
production drill rig
Expansion
The Durkin North Mineral Resources are considered open to the east towards the Long mine, with potential to extend the mine life.
Companies & ownership
  • Mincor Resources NL
Cerro del Gallo Project

Guanajuato, Mexico · Open Pit

Under Development
GoldSilverCopper
Mine life
15.3 years
Workforce
around 400 direct jobs during its operational life
Overview
The Cerro del Gallo Project is an advanced development stage gold and silver project located in the state of Guanajuato, Mexico.
Production
earlier 2019 PFS by Argonaut Gold projected an annual production of 60,000 to 70,000 ounces of gold and 1.2 million ounces of silver.
Processing
heap leaching circuit, three-stage crushing plant, a heap leach pad, waste dump, solution ponds, a Sulphidization, Acidification, Recycling, and Thickening (SART) plant, and an Adsorption, Desorption, and Recovery (ADR) plant. The SART plant is designed to recover copper and silver from the solution, which also allows for the recycling of cyanide.
Equipment
fleet of 91-tonne haul trucks and 13 cubic metre front-end loaders
Companies & ownership
  • Argonaut Gold Inc.
    TSX:AR
Furnas Copper-Gold Project

Pará State, Brazil · Open Pit

Feasibility
CopperGoldSilver
Mine life
24 years
Overview
The Furnas Copper-Gold Project, located in the Carajás Mineral Province, Pará State, Brazil, is in the advanced exploration and engineering studies phase with a Preliminary Economic Assessment (PEA) completed. It proposes a combination of open pit and underground mining over 2,400 hectares.
Production
Projected production over the first 15 years: 70,000 tonnes copper, 111,000 ounces gold, 532,000 ounces silver per year. Full 24-year mine life: over 1.2 million tonnes copper, approximately 2 million ounces gold, and nine million ounces silver.
Processing
Centralized processing facility with a design capacity of 13.5 million tonnes per annum, utilising conventional flotation to produce a copper concentrate with gold and silver by-product credits.
Expansion
Earn-in agreement with Vale Base Metals (VBM) to earn 60% interest.
Companies & ownership
  • Ero Copper Corp.
    TSX:ERO
Caraíba Operations

Bahia State, Brazil · Processing Facility

Operating
CopperGoldSilver
Opened
1979-01-01
End year
2042
Mine life
20 years
Workforce
approximately 3,181 direct and third-party employees
Overview
The Caraíba Operations is a fully integrated copper complex composed of a hub-and-spoke model with multiple mines feeding a central processing plant. It includes both underground (Pilar, Vermelhos) and open-pit (Surubim) mines.
Production
For the full year of 2025, the Caraíba Operations produced 36,035 tonnes of copper in concentrate. The production guidance for 2026 is projected to be between 35,000 and 40,000 tonnes of copper in concentrate.
Processing
Ore from the mines is treated at the Caraíba Mill, which is located next to the Pilar underground mine. The process involves conventional crushing and flotation to produce a high-grade copper concentrate. The mill has a throughput capacity of approximately 4.2 million tonnes per annum.
Expansion
construction of a new, external shaft for the Pilar mine, which is expected to be operational in 2027. This project is intended to increase total ore production from the Pilar mine from approximately 1.3 million tonnes per annum to roughly 3.0 million tonnes by 2026.
Companies & ownership
  • Ero Copper Corp.
    TSX:ERO
Tucumã Operation

Pará State, Brazil · Open Pit

Operating
CopperGoldIron Ore
End year
2033
Mine life
12 years
Workforce
approximately 2,220 people (construction phase); over 90% of operational staff hired by June 2024
Overview
The Tucumã Operation, formerly known as the Boa Esperança Project, is an open-pit mine located in Pará State, Brazil, within the Carajás Mineral Province. The primary commodity is copper, and the deposit is an iron oxide copper gold (IOCG) type.
Production
mill designed to treat 4.0 million tonnes of ore annually. In 2024, 5,156 tonnes of copper in concentrate produced. In 2025, 28,272 tonnes of copper in concentrate produced. Production guidance for 2026 is between 32,500 and 37,500 tonnes of copper in concentrate.
Processing
conventional three-stage crushing circuit with primary, secondary, and tertiary crushers, a ball mill for comminution, and flotation to produce a high-grade copper concentrate
Equipment
backhoe configured excavator and 38-tonne conventional trucks
Companies & ownership
  • Ero Copper Corp.
    TSX:ERO
Surubim open pit mine

Bahia State, Brazil · Open Pit

Operating
Copper
Opened
2010-01-01
Mine life
20 years
Workforce
approximately 250 direct jobs
Overview
The Surubim open pit mine is operated by Mineração Caraíba S.A. (MCSA), in which the Canadian company Ero Copper Corp. holds a 99.6% interest. MCSA holds a 100% interest in the Caraíba Operations, of which the Surubim Mine is a part. The mine is located in the Curaçá Valley in Bahia State, Brazil.
Production
For the full year of 2023 were 568,148 tonnes of ore mined at a copper grade of 0.62%. For the full year of 2024, tonnes of ore mined were 605,292 at 0.62% copper.
Processing
conventional crushing, grinding, and flotation
Equipment
truck and shovel/loader
Companies & ownership
  • Ero Copper Corp.
    TSX:ERO
Vermelhos underground mine

Bahia State, Brazil · Underground

Operating
CopperGold
Companies & ownership
  • Ero Copper Corp.
    TSX:ERO
Pilar underground mine

Bahia State, Brazil · Underground

Operating
CopperGold
Companies & ownership
  • Ero Copper Corp.
    TSX:ERO
Santo Domingo Project

Atacama, Chile · Open Pit

Under Development
CopperIron OreGold
Mine life
19 years
Workforce
1,550 to 4,060 workers during construction; 1,055 employees once operational
Overview
The Santo Domingo Project is a fully-permitted copper-iron-gold project operated by Capstone Copper Corp. in the Atacama region, Chile. It will be developed as two open-pit mines, Santo Domingo and Iris Norte.
Production
Projected average annual production for the first seven years: 106,400 tonnes of copper and 3.7 million dry metric tonnes of iron concentrate. Life-of-mine average annual production: 68,100 tonnes of copper and 3.6 million dry metric tonnes of iron concentrate. Total life-of-mine copper production: 1.3 million tonnes.
Processing
Copper-iron concentrator with a designed maximum throughput of 72,000 tonnes per day, using Autogenous Grinding (AG) milling, conventional rougher cell flotation, regrinding, classification, Jameson Cells, and Low Intensity Magnetic Separation for magnetite recovery
Equipment
electric and hydraulic shovels, a wheel loader, and 290-tonne capacity haul trucks, supported by drilling rigs, tracked and wheel dozers, motor graders, and water trucks
Expansion
Agreement for Orion Resource Partners LP to acquire a 25% interest upon a positive final investment decision
Companies & ownership
  • Capstone Copper Corp.
    ASX:CSC · TSX:CS
Mantoverde

Atacama Region, Chile · Open Pit

Operating
CopperGold
Opened
1995-01-01
End year
2049
Workforce
More than 1,000 jobs (MVDP)
Overview
Mantoverde is an operating open-pit copper-gold mine located in the province of Chañaral, Atacama Region, Chile. It is situated 56 kilometres southeast of the city of Chañaral and 100 kilometres north of Copiapó, at an altitude of approximately 900 metres above sea level. The operation consists of four open pits along the Mantoverde fault, mining both sulphide and oxide ores.
Production
SX-EW plant capacity of 60,000 tonnes per year of copper cathodes. Annual copper production was 95,115 tonnes in 2025. Sulphide concentrator nominal capacity of 32,000 tonnes per day (MVDP).
Processing
Oxide ore is treated through heap and dump run-of-mine leaching and a conventional solvent extraction-electrowinning (SX-EW) plant to produce high-purity copper cathodes. Sulphide ore is processed at a concentrator plant that produces copper concentrate with gold as a by-product. Processing infrastructure includes a primary gyratory crusher, a SAG mill, a ball mill, traditional and column flotation cells, thickeners, cyclones, and pumps. Supported by a state-of-the-art desalination plant.
Equipment
Komatsu 830E and Caterpillar 785 haul trucks; Caterpillar 994K front-end loaders, Komatsu 4100XPC electric cable shovels, and Komatsu PC5500 hydraulic shovels; Atlas Copco (Epiroc) DM50 and Caterpillar MD6310 drills
Expansion
Mantoverde Development Project (MVDP) completed in 2023, adding a sulphide concentrator with 32,000 tonnes per day capacity; Mantoverde Optimized (MV-O) project is a brownfield expansion to increase sulphide concentrator throughput to 45,000 tonnes per day
Companies & ownership
  • Capstone Copper Corp.
    ASX:CSC · TSX:CS
Mantos Blancos

Antofagasta, Chile · Open Pit

Operating
CopperSilver
Opened
1960-01-01
End year
2038
Workforce
Workforce lives off-site, primarily in Antofagasta. In 2022, contractors made up approximately 38% of the total workforce at Mantos Blancos and Mantoverde combined. For 2024, contractors form approximately 54% of the total workforce at Mantos Blancos and Mantoverde operations.
Overview
Mantos Blancos is an active open-pit mine owned and operated by the Canadian mining company Capstone Copper Corp. It is located in the Antofagasta region of Chile, approximately 45 kilometres northeast of the city of Antofagasta, situated 800 metres above sea level in the Atacama Desert. The primary commodities produced are copper and silver.
Production
49,522 tonnes in 2023; 44,574 tonnes in 2024; guidance of 49,000–59,000 tonnes for 2025.
Processing
Sulphide ore processed via concentrator with a flotation circuit; oxide ore treated via dump leaching. Sulphide concentrator plant throughput expanded to 7.3 million tonnes per year (20,000 tonnes per day).
Equipment
primary crusher, secondary crusher, tertiary crushers, Sandvik crushers (including a CH870i model), ball mills, mining fleet, auxiliary equipment
Expansion
Mantos Blancos Concentrator Debottlenecking Project (completed late 2021); Phase II expansion being studied to potentially increase throughput to at least 27,000 tonnes per day
Companies & ownership
  • Capstone Copper Corp.
    ASX:CSC · TSX:CS
Cozamin

Zacatecas, Mexico · Underground

Operating
CopperSilverZincLead
End year
2030
Overview
The Cozamin mine is an operating underground copper-silver mine with a surface milling facility, owned and operated by Capstone Copper Corp. It is a polymetallic mine, producing primarily copper and silver, with zinc and lead as by-products. The operation is 100% owned by Capstone Copper.
Production
For the full year of 2025, Cozamin produced 25,348 tonnes of copper. The production guidance for 2026 is forecast to be between 21,000 and 24,000 tonnes of copper. The milling facility has a capacity of 4,400 tonnes per day.
Processing
The processing plant includes a primary jaw crusher, a secondary cone crusher, and a tertiary crusher. The crushed ore is then fed into ball mills for grinding. The ground slurry undergoes a flotation process to produce copper, zinc, and lead concentrates. A paste backfill plant was completed in late 2022 and became operational in 2023.
Equipment
The Capstone-owned fleet includes: Ten Sandvik LH 410 load-haul-dump scoops, Sandvik Axera 5 and DD-311-40 jumbo drills, a variety of Sandvik long-hole drills (DL310, DL311, DL331, DL411), two Sandvik TH430 haul trucks, a TUMI SBR 400SR raise borer, five Sandvik DS 311 rock bolters, two Paus 853 S8 rock scalers, Caterpillar telehandlers and backhoe loaders, a Getman A64 utility vehicle and a Maclean scissor lift. The contractor-owned fleet includes additional load-haul-dump scoops, jumbo drills, rock bolters, and haul trucks.
Expansion
A paste backfill plant was completed in late 2022 and became operational in 2023. This plant combines approximately half of the filtered tailings with cement to create a paste that is pumped back underground to be used as backfill, which aids in increasing copper ore extraction.
Companies & ownership
  • Capstone Copper Corp.
    ASX:CSC · TSX:CS
Pinto Valley Mine

Arizona, United States · Open Pit

Operating
CopperMolybdenumGoldSilver
Opened
1975-01-01
End year
2039
Workforce
The mine supports approximately 2,250 direct and secondary jobs annually and is the second-largest employer in the Globe-Miami district. In 2021, it was stated that the mine life extension would preserve approximately 700 jobs. When Capstone acquired the mine in 2013, 98% of the 650 employees accepted employment offers.
Production
In the fourth quarter of 2025, the mine produced 11,423 tonnes of copper. The total copper production for 2025 was 42,382 tonnes. In 2024, the mine produced 126 million pounds of copper.
Processing
The mine uses conventional open-pit hard rock mining methods which include drilling, blasting, loading, and hauling. The ore is processed at a concentrator plant that uses a conventional porphyry copper concentrator flowsheet with primary, secondary, and tertiary crushing, followed by ball milling and flotation to produce copper and molybdenum concentrates. There is also a solvent extraction-electrowinning (SX-EW) plant for producing copper cathode from leach solutions. The concentrator has a capacity of 60,000 tonnes per day, and the SX-EW plant has a capacity of 25,000 tonnes per day.
Equipment
The mining fleet includes haul trucks and loaders. As of 2021, the fleet included 19 Caterpillar 789D haul trucks (185 dry tonnes capacity) and 4 Liebherr T264 trucks (215 dry tonnes capacity). Loading equipment included two Caterpillar 994K front-end loaders, two Caterpillar 994H loaders, and one Hitachi EX5600 hydraulic shovel. The processing plant consists of a primary crusher, secondary and tertiary crushers, six ball mills, and flotation circuits. Specifically, there is a Fuller Traylor gyratory primary crusher and six Allis-Chalmers overflow ball mills. In 1978, the plant was described as having four 7 ft standard and eight 7 ft shorthead crushers, and six 18 ft by 21 ft, 4000 hp single-stage ball mills.
Expansion
A district growth study is evaluating the potential to extend the mine life through 2050.
Companies & ownership
  • Capstone Copper Corp.
    ASX:CSC · TSX:CS
AIM (Acid, Iron, Metal) Plant

Central Sulawesi, Indonesia · Processing Facility

Operating
SulfurIron OreCopperLeadZincGold+1
Overview
The AIM Plant is a processing facility located in the Indonesia Morowali Industrial Park (IMIP). It processes high-grade pyrite spent ore from the Wetar Copper Mine, designed to treat over 1 million tonnes per year. It produces sulphuric acid, saturated steam, iron ore pellets, copper sponge, copper cathodes, lead-zinc hydroxides, gold doré, and silver.
Production
Nominal rate of over 1 million tonnes per year; capacity of 1.2 million tonnes per annum for acid and steam. Q3 2025 production: 251,715 tonnes of acid, 48,228 tonnes of iron pellets, 464 tonnes of copper sponge. Q4 2025 production: 321 tonnes of LME-grade copper cathode.
Processing
concentrator for pyrite concentrate, acid plant, chloridising roasting plants, metal extraction plant; involves milling, pyrite flotation, concentrate thickening and filtration, roasters producing sulphur dioxide gas for sulphuric acid plants, and a chloride roaster for calcine, with base and precious metals recovered from the gas stream.
Equipment
mill, roasters, acid plants, a disc pelletizer, chloride rotary kiln, trucks, barges
Companies & ownership
  • PT Merdeka Copper Gold Tbk.
Re-Sustainability Reldan Hyderabad Facility

Telangana, India · Processing Facility

Operating
GoldSilverPlatinumPalladiumCopper
Opened
2023-01-01
Overview
Advanced LEED Platinum processing facility, part of the Re-Sustainability Reldan joint venture, spanning 100,000 square feet on a 14-acre site, completed in 2023.
Companies & ownership
  • Sibanye-Stillwater Limited
    NYSE:SBSW
Reldan Fairless Hills Facility

Pennsylvania, USA · Processing Facility

Operating
GoldSilverPlatinumPalladiumCopper
Opened
2008-01-01
Overview
Main US facility of the Reldan precious metals recycling group, dedicated to circularity and minimising landfill waste, achieving a landfill diversion rate of over 98% in 2024. It reclaims and processes precious metals from industrial and electronic waste.
Production
From 2008 through the end of 2024, diverted 273 million pounds of material from landfills, including over 3.1 million troy ounces of gold, over 25.2 million troy ounces of silver, over 221,000 troy ounces of palladium, over 232,000 troy ounces of platinum, and over 40.4 million pounds of copper. In 2022, secondary gold production was around 170,000 ounces, and platinum and palladium production contributed to a combined total of 400,000-450,000 ounces of secondary PGM production.
Processing
thermal processing, mechanical reduction, pyrometallurgical processing, and hydrometallurgical processing
Expansion
expanded its operations in 2019
Companies & ownership
  • Sibanye-Stillwater Limited
    NYSE:SBSW
Tujuh Bukit Copper Project

East Java Province, Indonesia · Sublevel Caving

Feasibility
CopperGoldMolybdenum
Mine life
30 years
Overview
Underground copper-gold porphyry deposit currently in a pre-production phase, located beneath the operational Tujuh Bukit Gold Mine.
Production
At peak production, designed to process 24 Mtpa of ore, producing over 110,000 tonnes of copper and 350,000 ounces of gold annually. Staged expansion plans to peak at 112,000 tonnes per annum of contained copper and 366,000 ounces per annum of contained gold in concentrate.
Processing
Copper-gold concentrator developed in phases. Phase 1: 4 Mtpa concentrator with grinding, rougher flotation, and cleaner flotation circuits. Phase 2: expansion to 14 Mtpa with Albion, SXEW, and CIL circuits. Phase 3: further increase to 24 Mtpa with additional processing stream and pyrite flotation circuit.
Equipment
diamond drill rigs, perimeter jaw crushers, materials handling system consisting of transfer conveyors and a main conveyor decline
Expansion
staged expansion plans for processing (Phase 1, 2, 3); initial Sub-Level Cave (SLC) mine followed by a larger Block Cave (BC) mine
Companies & ownership
  • PT Merdeka Copper Gold Tbk.
Wetar Copper Mine

Maluku Province, Indonesia · Open Pit

Operating
CopperGoldSilver
End year
2027
Workforce
Over 65% of the workforce is comprised of local residents.
Overview
The Wetar Copper Mine is located on Wetar Island, Maluku Barat Daya Regency, Maluku Province, Indonesia. It is owned 100% by PT Merdeka Copper Gold Tbk. The mine is a conventional open-cut operation. Mining operations at the Wetar heap leach facility are expected to cease in the third quarter of 2025, with copper leaching continuing until the first quarter of 2027. The primary commodities are copper, with gold, silver, and pyrite also recovered. The mine comprises three open pits: Lerokis, Kali Kuning, and Partolang. As of early 2025, open-pit copper mining was ongoing at Partolang.
Production
FY 2025: 10,454 tonnes of copper. Q3 2025: 3,228 tonnes of copper. Q2 2025: 1,854 tonnes of copper. FY 2021: 19,000 tonnes of copper. FY 2020: 5,000 tonnes of copper. The revised full-year copper production guidance for 2025 was 10,000–12,000 tonnes. The forecast for 2026 is 4,000–5,000 tonnes.
Processing
heap leach and solvent extraction-electrowinning (SX-EW) to produce copper cathodes
Equipment
crusher and agglomerator
Companies & ownership
  • PT Merdeka Copper Gold Tbk.
Mt Lyell

Tasmania, Australia · Underground

Care And Maintenance
CopperGold
Opened
1894-01-01
Mine life
25 years
Workforce
potential restart could create 250-350 full-time positions during the operational phase
Overview
Historic underground copper-gold mine in Tasmania, Australia, on care and maintenance since 2014. Sibanye-Stillwater is evaluating its re-establishment, with a decision expected in 2026.
Production
average annual production for the first 10 years of 27,000 tonnes of copper and 16,000 ounces of gold
Processing
flotation
Expansion
Feasibility study completed for re-establishment; decision expected 2026. A PFS outlined a potential 25-year mine life for a restart, targeting four underground deposits: Prince Lyell, Western Tharsis, Cape Horn-Green Horn, and Copper Chert.
Companies & ownership
  • Sibanye-Stillwater Limited
    NYSE:SBSW
Page 18 of 30 (705 total)