← Map view|Directory

Directory

Browse minesites, mining companies and suppliers. Use the tabs below to switch sections.

Minesites Directory

Browse minesites. Each card shows company ownership and their most recent associated articles.

Filter by mine details and commodity attributes.
Page 12 of 30 (705 total)
Hackett River Project

Nunavut, Canada · Open Pit

Feasibility
SilverZincLeadCopperGold
Mine life
16 years
Workforce
225 to 350 people
Overview
The Hackett River Project is an exploration-stage asset located in Nunavut, Canada. It is a silver-rich volcanogenic massive sulphide deposit. A 2008 project proposal outlined the potential for a mine with both open-pit and underground developments, and a 2010 preliminary economic assessment considered a 12,000-tonne-per-day operation with a 16-year mine life.
Production
12,000-tonne-per-day operation
Processing
conventional grinding and flotation plant on-site to produce zinc, copper, and lead concentrates
Equipment
conventional truck and shovel for open-pit operations and a conventional grinding and flotation plant
Companies & ownership
  • Sabina Gold & Silver Corp.
    TSX:SBB · OTC:OTCQX
Didipio Mine

Nueva Vizcaya, Quirino, Philippines · Underground

Operating
GoldCopper
Commodities, grades and output
YearCommodityAv. GradeOutput
2023Gold-138500 oz
2023Copper-14200 t
2022Gold-113200 oz
2022Copper-14400 t
Opened
2013-01-01
End year
2035
Workforce
1,788 (in 2017)
Overview
The Didipio mine is located in Barangay Didipio, Kasibu, in the provinces of Nueva Vizcaya and Quirino on the island of Luzon. It is operated by OceanaGold (Philippines), Inc., a subsidiary of OceanaGold Corporation. Following an Initial Public Offering (IPO) on the Philippine Stock Exchange on 13 May 2024, OceanaGold Corporation holds an 80% indirect interest in the mine. Large-scale open-pit mining was completed in May 2017. Current mining activities are solely from underground operations, which began in 2015, and are supplemented by the processing of surface stockpiles. The underground mining method is longhole open stoping with cemented paste backfill. The operation is governed by a Financial or Technical Assistance Agreement (FTAA) with the Philippine government, which was renewed in 2021 for a 25-year term.
Production
Production overview - 2023: gold 138500 oz, copper 14200 t; 2022: gold 113200 oz, copper 14400 t.
Processing
The processing plant uses a conventional SAG mill-ball mill grinding circuit, froth flotation, and a gravity gold recovery circuit. The combined processing rate of underground ore and surface stockpiles is approximately 4.0 million tonnes per annum (Mtpa).
Expansion
A pre-feasibility study is in progress to identify requirements to support an optimised underground mining production rate of approximately 2.5 Mtpa and to evaluate process plant augmentation needs. This study is expected to be completed in 2026. The company is also conducting exploration to expand resources, including at the Napartan prospect located about nine kilometres from the Didipio mine.
Companies & ownership
  • OceanaGold Corporation
Unca Creek

Northern Territory, Australia · Open Pit

Under Development
CopperSilverGold
Overview
Unca Creek is an exploration project in the Northern Territory, Australia, operated by KGL Resources (100% ownership) under exploration licence EL 28082. Located 380 km NE of Alice Springs, it surrounds the Jervois Copper Project. The 72.7 sq km tenement, acquired in March 2017, focuses on copper, silver, and gold exploration using advanced 3D modelling and seismic surveys.
Companies & ownership
  • KGL Resources Limited
    ASX:KGL
Jervois Copper Project

Northern Territory, Australia · Open Pit

Under Development
CopperSilverGold
Commodities, grades and output
YearCommodityAv. GradeOutput
2025Copper1.77 %30000 t
2025Silver26.27 g/t1106000 koz
2025Gold0.26 g/t8900 koz
2022Copper2.02 %-
2022Silver25.3 g/t-
2022Gold0.25 g/t-
Mine life
10 years
Workforce
320 (construction), 280 (peak production)
Overview
KGL Resources is advancing toward a Final Investment Decision in 2025, with the goal of bringing Jervois into production in 2027. The project has all necessary approvals to commence construction. The development plan includes two open pits (Reward and Bellbird) and four underground mining areas (Rockface, Reward, Marshall, and Bellbird).
Production
Production overview - 2025: copper 30000 t, silver 1106000 koz, gold 8900 koz.
Processing
The project will use a flotation plant to process up to 2 million tonnes of ore per annum, producing a copper concentrate with by-products. The concentrate will have a grade of 27% copper.
Expansion
KGL Resources is advancing toward a Final Investment Decision in 2025, with the goal of bringing Jervois into production in 2027. The project has all necessary approvals to commence construction. The construction schedule is 18 months, followed by a six-month plant commissioning and ramp-up period. The development plan includes two open pits (Reward and Bellbird) and four underground mining areas (Rockface, Reward, Marshall, and Bellbird). A February 2025 Feasibility Study Update confirmed the project is technically robust and financially viable.
Companies & ownership
  • KGL Resources Limited
    ASX:KGL
Antamina

Ancash, Peru · Open Pit

Operating
CopperZinc
Companies & ownership
  • BHP Group
    ASX:BHP
Cerro Colorado

Atacama Desert, Chile · Open Pit

Operating
Copper
Companies & ownership
  • BHP Group
    ASX:BHP
Spence

Atacama Desert, Chile · Open Pit

Operating
Copper
Companies & ownership
  • BHP Group
    ASX:BHP
Escondida

Atacama Desert, Chile · Open Pit

Operating
Copper
Overview
The world's largest copper mine.
Companies & ownership
  • BHP Group
    ASX:BHP
Olympic Dam

South Australia, Australia · Underground

Operating
CopperUraniumGoldSilver
Overview
A multi-mineral orebody producing copper, uranium, gold, and silver.
Companies & ownership
  • BHP Group
    ASX:BHP
Kucing Liar

Central Papua, Indonesia · Block Cave

Under Development
CopperGold
Commodities, grades and output
YearCommodityAv. GradeOutput
2024Copper1.05 %-
2024Gold0.92 g/t-
End year
2041
Capex (est.)
USD 4.00B
Overview
PT Freeport Indonesia commenced long-term mine development activities for the Kucing Liar deposit in October 2021, with development expected to continue over an approximate 10-year timeframe. Initial production is expected to commence and ramp up gradually around 2030, with full operating rates projected to yield approximately 750 million pounds of copper and 735,000 ounces of gold annually. The mine is being planned as a 90,000 metric tonnes per day block cave mine.
Production
Initial production is expected to commence and ramp up gradually around 2030. At full operating rates, annual production is expected to be approximately 750 million pounds of copper and 735,000 ounces of gold. The mine is being planned as a 90,000 metric tonnes per day block cave mine.
Expansion
PT Freeport Indonesia commenced long-term mine development activities for the Kucing Liar deposit in October 2021. Development activities are expected to continue over an approximate 10-year timeframe. Initial production is expected to commence and ramp up gradually around 2030.
Companies & ownership
  • Macmahon Holdings Limited
    ASX:MAH
Batu Hijau

West Nusa Tenggara, Indonesia · Open Pit

Operating
CopperGoldSilver
Commodities, grades and output
YearCommodityAv. GradeOutput
2024Copper-395 Mlbs
2024Gold-802749 oz
2022Copper-463.9 Mlbs
2022Gold-730700 oz
2022Silver-2170400 oz
End year
2030
Overview
Batu Hijau is a significant producer of copper and gold. In 2024, the mine's production increased substantially due to the processing of high-grade ore from Phase 7 of the mining plan.
Production
Production overview - 2024: copper 395 Mlbs, gold 802749 oz; 2022: copper 463.9 Mlbs, gold 730700 oz, silver 2170400 oz.
Processing
Crushing, grinding, and flotation to produce a copper-gold concentrate
Equipment
P&H 4100 electric mining shovels, Caterpillar 793C haul trucks with a 220-tonne capacity
Expansion
Expansion of the processing plant is underway to double its input capacity to accommodate ore from Phase 8 and the future Elang mine.
Companies & ownership
  • Macmahon Holdings Limited
    ASX:MAH
Telfer Gold Mine

East Pilbara, Australia · Open Pit

Operating
GoldCopperSilver
Commodities, grades and output
YearCommodityAv. GradeOutput
2022Gold-349000 oz
2022Copper-17000 t
2022Silver-208000 oz
2021Gold-408000 oz
2021Copper-14000 t
2019Gold-393164 oz
2019Copper-16000 t
2019Silver-164000 oz
Opened
1977-01-01
Capex (est.)
USD 141.24M
Production
Production overview - 2022: gold 349000 oz, copper 17000 t, silver 208000 oz; 2021: gold 408000 oz, copper 14000 t.
Processing
The processing facility has a nominal capacity of 20 million tonnes per annum, comprising two 10Mtpa trains. It produces gold doré, copper-gold concentrate, and gold middlings high-grade concentrate. The process includes a carbon-in-leach (CIL) plant for gold recovery and a flotation plant for copper-gold concentrates.
Expansion
Greatland Gold acquired the Telfer mine from Newmont in December 2024. Following the acquisition, Greatland resumed dual-train processing operations. The company has an initial 15-month mine plan targeting 374,000 ounces of gold and 13,000 tonnes of copper production. There is a significant focus on exploration to extend the mine's life, with a record 240,000m drilling program planned for FY26. The nearby Havieron project is being developed to be integrated with the Telfer operations, with Havieron ore planned to be processed at the Telfer plant. In November 2022, a A$214 million expansion of the West Dome Stage 8 cutback was approved to extend operations.
Companies & ownership
  • Macmahon Holdings Limited
    ASX:MAH
Mount Carlton Gold Mine

Queensland, Australia · Open Pit

Under Development
GoldSilverCopper
Commodities, grades and output
YearCommodityAv. GradeOutput
2022Gold-45768 oz
2022Silver-317198 oz
2022Copper-1838 t
Opened
2013-01-01
Capex (est.)
USD 15.70M
Workforce
200
Overview
The mine was placed on care and maintenance after the previous owner, Navarre Minerals, went into voluntary administration in mid-2023. In March 2026, Macmahon Holdings announced it had signed a Letter of Intent with Wolfram Limited to restart operations. Early works, including the repair and maintenance of the mine access road, have commenced. The restart of surface mining is expected to begin in April 2026, with underground mining to follow shortly after. Commercial production is anticipated to return by mid-2026.
Production
Production overview - 2022: gold 45768 oz, silver 317198 oz, copper 1838 t.
Processing
The site has a 960ktpa processing plant. The processing method involves crushing, grinding, and bulk sulphide flotation to produce a polymetallic concentrate. There is also a gravity circuit to produce gold doré.
Expansion
Macmahon Holdings has been engaged as the mining contractor for the restart of the Mount Carlton mine. The scope of the contract includes surface and underground mining, as well as civil infrastructure services. The contract is anticipated to have an initial term of 33 months and is valued at approximately $250 million. Wolfram has also engaged DRA Global to refurbish and operate the processing plant and has secured a seven-year offtake agreement with Glencore for 100 per cent of the site's output. An investment of $15.7 million is planned for commissioning by June 2026.
Companies & ownership
  • Macmahon Holdings Limited
    ASX:MAH
Deflector Gold Project

Western Australia, Australia · Underground

Operating
GoldCopper
Commodities, grades and output
YearCommodityAv. GradeOutput
2024Gold4.6 g/t139000 oz
2024Copper0.2 %1037 t
2023Gold-260478 oz
2023Copper-1325 t
Opened
2016-10-25
Production
Production overview - 2024: gold 139000 oz, copper 1037 t; 2023: gold 260478 oz, copper 1325 t.
Processing
The Deflector processing plant includes a three-stage crushing circuit, a single ball mill, a gravity circuit for gold recovery, and a sulphide flotation circuit with flotation tails treated by a carbon-in-pulp (CIP) circuit. The plant has a throughput capacity of approximately 0.8 million tonnes per annum.
Equipment
new mining equipment, SANDVIK DD421
Expansion
Exploration is focused on defining extensions to mineralisation at Deflector South West and the nearby Spanish Galleon high-grade lodes. Spanish Galleon is expected to become a new mining front to supplement production in FY26 and FY27. Access development to the Spanish Galleon area was scheduled to commence in the second half of FY25.
Companies & ownership
  • Macmahon Holdings Limited
    ASX:MAH
Red Chris Mine

British Columbia, Canada · Open Pit

Operating
CopperGold
Commodities, grades and output
YearCommodityAv. GradeOutput
2025Copper0.589 %93101213 lbs
2025Gold0.562 g/t92429 oz
2024Copper0.516 %85320618 lbs
2024Gold0.367 g/t59811 oz
2023Copper0.356 %57051467 lbs
2023Gold0.295 g/t46046 oz
2022Copper-67604485 lbs
2022Gold-63658 oz
2020Copper-88300000 lbs
2020Gold-73787 oz
Opened
2015-01-01
End year
2028
Mine life
13 years
Capex (est.)
USD 3.00B
Workforce
Approximately 750 operational employees, 50 project employees, and 220 Tahltan employees (as of end 2024).
Overview
Red Chris Mine is an operating open pit mine in British Columbia, Canada, currently transitioning to an underground block cave operation. It produces copper, gold, and silver. The mine is owned 70% by Newmont Corporation (operator) and 30% by Imperial Metals Corporation.
Production
Production overview - 2025: copper 93101213 lbs, gold 92429 oz; 2024: copper 85320618 lbs, gold 59811 oz.
Processing
The plant uses conventional crushing, grinding and flotation to produce a gold-copper concentrate. The circuit includes a semi-autogenous mill, a ball mill, and a pebble crusher. Concentrate is trucked to the Port of Stewart for shipment to smelters.
Equipment
Conventional truck and shovel fleet, including a P&H 2800 electric cable shovel and Caterpillar 793 haul trucks.
Expansion
The mine is undergoing a major expansion to transition from open-pit to an underground block cave operation. The project has a projected capital cost of C$2.6 billion to $3 billion. The expansion is being fast-tracked through the federal government's Major Projects Office and is forecast to create up to 1,800 construction jobs. A feasibility study for the block cave is expected to be completed in the second half of 2026. Perenti subsidiary Barminco was awarded a contract extension for the development of the underground exploration decline.
Companies & ownership
  • Perenti Limited
    ASX:PRN
Nova-Bollinger

Western Australia, Australia · Underground

Operating
NickelCopperCobalt
Commodities, grades and output
YearCommodityAv. GradeOutput
2025Nickel-16371 t
2025Copper-7324 t
2025Cobalt-581 t
2024Nickel-20806 t
2024Copper-9922 t
2024Cobalt-735 t
2023Nickel-22915 t
2023Copper-10266 t
2023Cobalt-803 t
2022Nickel1.85 %26675 t
2022Copper0.75 %11483 t
2022Cobalt0.07 %982 t
End year
2026
Overview
The Nova-Bollinger mine, officially known as the Nova Operation, is a wholly-owned subsidiary of IGO Limited. It is located in the Fraser Range of Western Australia, approximately 160 kilometres east-northeast of Norseman. The Ngadju People are the Traditional Owners of the land where the mine is situated. Commercial production at the underground mine commenced in July 2017. The operation is scheduled to reach its end of life by late 2026, with IGO planning to transition from operations directly into mine closure. A final Mine Closure Plan is anticipated to be submitted to the Western Australian government in mid-2026. The mine consists of two orebodies, Nova and Bollinger, which are now recognised as a single continuous deposit.
Production
Production overview - 2025: nickel 16371 t, copper 7324 t, cobalt 581 t; 2024: nickel 20806 t, copper 9922 t, cobalt 735 t.
Processing
processing plant on-site produces separate nickel and copper concentrates through a differential flotation circuit.
Equipment
underground sub-level open stoping (SLOS) and room-and-pillar mining methods; processing plant; Barminco (subsidiary of Perenti Global) provides mining and underground development services.
Companies & ownership
  • Perenti Limited
    ASX:PRN
Motheo Copper Mine (including A4 and T3 open pits)

Ghanzi District, Botswana · Open Pit

Operating
CopperSilver
Commodities, grades and output
YearCommodityAv. GradeOutput
2025Copper-58000 t
2024Copper0.9 %427000 t
2024Silver13.5 g/t19800000 oz
2023Copper-8700 t
2023Silver-200000 oz
End year
2033
Mine life
10 years
Workforce
The mine employs over 2,000 people, including contractors, with over 95% of direct employees being Batswana citizens. During the production phase, it is expected to create 600 full-time jobs.
Overview
Motheo Copper Mine, including the A4 and T3 open pits, is an operating copper and silver mine in Botswana's Ghanzi District. It commenced commercial production in July 2023 and has an initial mine life of 10 years. The mine employs over 2,000 people and utilizes conventional crushing, grinding, and flotation processes.
Production
Production overview - 2025: copper 58000 t; 2024: copper 427000 t, silver 19800000 oz.
Processing
The processing method involves a central facility with conventional crushing, grinding, and flotation processes to produce a high-quality copper concentrate with a silver by-product. The plant's initial processing capacity of 3.2 million tonnes per annum (mtpa) was expanded, with the operation running at a 5.6 mtpa rate by September 2025.
Equipment
The mining fleet includes Hitachi EX1900 and EX2600s excavators, a Cat 992 wheel-loader, Cat 785 (150-tonne capacity) and Cat 777 (100-tonne capacity) haul trucks, and Cat D10 dozers. The fleet also includes four D10T dozers, two 777 water trucks, and two 18 motor graders.
Expansion
The Motheo operations include the T3 and A4 open pit mines. The development of the A4 open pit is part of an expansion to increase the processing rate to 5.2 mtpa. First ore from the A4 pit was expected in the first quarter of FY2025. The A1 deposit, located about 20 kilometres north-east of the mine, is a development project with the potential to provide an additional source of ore.
Power sources
Solar
Companies & ownership
  • Perenti Limited
    ASX:PRN
Gonneville Project

Western Australia, Australia · Open Pit

Under Development
NickelCopperCobalt
Commodities, grades and output
YearCommodityAv. GradeOutput
2025Nickel-3200 t
2025Copper-5200 t
2025Cobalt-300 t
Mine life
23 years
Overview
The Gonneville discovery, made in March 2020, is the first major Platinum Group Element (PGE) discovery in Australia and has defined the new West Yilgarn Ni-Cu-PGE Province. It is recognised as the largest PGE discovery in Australian history and the largest nickel-sulphide discovery globally in over two decades.
Production
Production overview - 2025: nickel 3200 t, copper 5200 t, cobalt 300 t.
Processing
Copper-nickel sequential flotation and precious metal leaching to produce smelter-grade copper and nickel concentrates, and precious metal doré.
Companies & ownership
  • Chalice Mining Limited
    ASX:CHN · OTC:CGMLF
Gonneville Palladium-Nickel-Copper Project

Western Australia, Australia · Open Pit

Feasibility
PalladiumPlatinumGoldNickelCopperCobalt
Commodities, grades and output
YearCommodityAv. GradeOutput
2025Nickel-7000 t
2025Copper-8000 t
2025Cobalt-700 t
Opened
2029-01-01
End year
2052
Mine life
23 years
Capex (est.)
USD 541.20M
Workforce
Approximately 1,200 jobs during peak construction and around 500 during operations
Overview
The development plan involves a two-stage construction of an open pit mine and a process plant. Stage one is designed for the lowest capital cost and shortest payback period. Stage two will be an expansion, with the investment decision expected between 2031-2033. The ultimate processing capacity is planned to be 14Mtpa. The processing flowsheet will produce two smelter-grade concentrates (a copper concentrate and a nickel concentrate) and a palladium-platinum-gold doré.
Production
Production overview - 2025: nickel 7000 t, copper 8000 t, cobalt 700 t.
Processing
The processing flowsheet will produce two smelter-grade concentrates (a copper concentrate and a nickel concentrate) and a palladium-platinum-gold doré. A hydrometallurgical process is no longer required.
Expansion
The Pre-Feasibility Study (PFS) covers an initial 23-year open-pit mine life, which exploits about half of the Gonneville resource. There is significant potential for expansion through deeper open-pit mining or a large-scale underground operation beyond 2054. Stage two will be an expansion, with the investment decision expected between 2031-2033.
Companies & ownership
  • Chalice Mining Limited
    ASX:CHN · OTC:CGMLF
El Domo

Bolivar Province, Ecuador · Open Pit

Under Development
CopperGoldSilverZinc
Companies & ownership
  • Silvercorp Metals Inc.
    TSX:SVM · NYSE:SVM
GC Mine

Guangdong Province, China · Underground

Operating
SilverLeadZincGoldCopper
Companies & ownership
  • Silvercorp Metals Inc.
    TSX:SVM · NYSE:SVM
DCG

Henan Province, China · Underground

Operating
SilverLeadZincGoldCopper
Companies & ownership
  • Silvercorp Metals Inc.
    TSX:SVM · NYSE:SVM
LMW

Henan Province, China · Underground

Operating
SilverLeadZincGoldCopper
Companies & ownership
  • Silvercorp Metals Inc.
    TSX:SVM · NYSE:SVM
LME

Henan Province, China · Underground

Operating
SilverLeadZincGoldCopper
Companies & ownership
  • Silvercorp Metals Inc.
    TSX:SVM · NYSE:SVM
Page 12 of 30 (705 total)