← Map view|Directory

Directory

Browse minesites, mining companies and suppliers. Use the tabs below to switch sections.

Minesites Directory

Browse minesites. Each card shows company ownership and their most recent associated articles.

Filter by mine details and commodity attributes.
Page 11 of 30 (705 total)
Javelin VMS Project

Arizona, USA · Underground

Under Development
CopperZincLeadSilverGold
Overview
The Javelin VMS Project is an early-stage exploration project operated by Australian mining company New World Resources. The project's status is currently "exploration," a revision from the previously listed "feasibility." In January 2024, New World Resources commenced an initial diamond core drilling program at the project to test the Discus Copper Prospect. The project consists of a contiguous series of 100%-owned mining claims covering approximately 5,000 acres. It is located about 75 kilometres south-east of New World Resources' Antler Copper Deposit, near the Bagdad porphyry copper mine. The company is exploring the potential for the Javelin project to serve as a satellite source of ore, which could be transported to a future processing facility at the Antler Project.
Companies & ownership
  • New World Resources
    ASX:NWC
Reko Diq

Balochistan province, Pakistan · Open Pit

Under Development
CopperGold
Mine life
37 years
Capex (est.)
USD 5.70B
Workforce
Expected to employ 7,500 during peak construction and 4,000 long-term jobs once in production.
Overview
Development activity at the Reko Diq project has slowed, with Barrick extending a project review until mid-2027 due to escalating security risks. This review will assess security, capital, financing, scope, and timeline, potentially increasing budgets and delaying the first production target of late 2028.
Production
The project is not yet in production. Initial estimates for the first years of operation are for the production of 200,000 tonnes of copper and 250,000 ounces of gold annually. Another estimate suggests annual production of 200-250 kilotonnes of copper.
Processing
The operation will produce a high-quality copper-gold concentrate. Development is planned in two phases. Phase 1 is planned to process 45 million tonnes of ore per annum (mtpa). Phase 2, planned from 2034, is expected to double the processing capacity to a combined 90 mtpa.
Equipment
Truck-and-shovel open pit operation. Processing and mining equipment from Metso, Weir, and Komatsu. Fluor Corporation is the lead EPCM partner.
Expansion
Development is planned in two phases. Phase 1 is planned to process 45 million tonnes of ore per annum (mtpa). Phase 2, planned from 2034, is expected to double the processing capacity to a combined 90 mtpa.
Companies & ownership
  • Barrick Gold Corporation
    TSX:ABX · NYSE:B
  • Oil & Gas Development Company Limited
  • Government Holdings (Private) Limited
  • Pakistan Petroleum Limited
  • Government of Balochistan
Zaldívar

Antofagasta Region, Chile · Open Pit

Operating
Copper
Companies & ownership
  • Barrick Gold Corporation
    TSX:ABX · NYSE:B
Lumwana

North-Western Province, Zambia · Open Pit

Operating
Copper
Commodities, grades and output
YearCommodityAv. GradeOutput
2025Copper0.47 %151000 t
2024Copper0.52 %8300000 t
2020Copper0.49 %-
End year
2057
Mine life
36 years
Capex (est.)
USD 2.00B
Workforce
Over 3,000 local jobs in 2025; average 2,500-2,882 employees in 2024.
Overview
The mine consists of two open pits, Malundwe and Chimiwungo. The reopening of the Malundwe pit was underway in 2023. Barrick is developing a new regional airstrip, expected to be completed by the end of 2025. The expansion will also drive the development of the Manyama township and an industrial supplier park.
Production
Production overview - 2025: copper 151000 t; 2024: copper 8300000 t.
Processing
Ore is treated through a conventional sulphide flotation plant to produce copper concentrate.
Equipment
Conventional truck and shovel operation. Truck fleet transitioning from Hitachi EH4500 to 30 new trucks (Komatsu 930E-5, Hitachi EH5000). Shovel fleet updated to three Komatsu PC8000 and three Komatsu PC7000 shovels. Plan to transition to cable electric-powered shovels by 2031. Mine design for expansion includes in-pit crushing and conveying.
Expansion
A "Super Pit Expansion Project" is underway with a capital cost of nearly US$2 billion. The project aims to merge the Chimiwungo and Malundwe pits into a single large pit and develop two new satellite pits at Kamisengo and Kababisa. The expansion is designed to double the annual copper production to an average of 240,000 tonnes. The processing plant capacity will be increased to a target of 52 million tonnes per year, with a peak design of 54 million tonnes. Construction to begin in 2025 with expanded production anticipated in 2028.
Companies & ownership
  • Barrick Gold Corporation
    TSX:ABX · NYSE:B
Jabal Sayid

Al Madinah Region, Saudi Arabia · Underground

Operating
Copper
Commodities, grades and output
YearCommodityAv. GradeOutput
2025Copper-64000 t
2024Copper-65000 t
2023Copper-59091 t
End year
2028
Workforce
The mine has a multinational workforce including Saudi, West African, Australian, and Indonesian personnel.
Production
Production overview - 2025: copper 64000 t; 2024: copper 65000 t.
Processing
The mine uses conventional flotation to produce copper concentrate. The processing plant has a treatment rate of 3 million tonnes per annum. The plant was expanded to increase production capacity, with commissioning of a new paste plant in the second quarter of 2024.
Equipment
The mining contractor, Byrnecut, utilises a fleet of Sandvik machines, including: - Trucks: nine TH663i and three TH663 - LHDs: seven LH621i and one LH621 - Production drills: four Sandvik DL421 - Development rigs: three Sandvik DD421 - Boxhole borer: one Rhino 100HM
Expansion
A new ore body, Lode 1, has been included in the mine plan, which is expected to supplement the ore supply and enable the operation to deliver 3 million tonnes per annum. Stoping at Lode 1 commenced in the third quarter of 2023, with development for 2024 completed on schedule. The expansion project included upgrades to ventilation and the paste plant. In 2022, the Lode 1 development involved an additional 2,900 metres of capital development.
Companies & ownership
  • Barrick Gold Corporation
    TSX:ABX · NYSE:B
  • Saudi Arabian Mining Company (Ma'aden)
Phoenix

Nevada, United States · Open Pit

Operating
GoldCopper
Companies & ownership
  • Barrick Gold Corporation
    TSX:ABX · NYSE:B
Filo del Sol

San Juan Province, Argentina · Open Pit

Under Development
CopperGoldSilver
Commodities, grades and output
YearCommodityAv. GradeOutput
2019Copper0.39 %-
2019Gold0.33 g/t-
2019Silver15 g/t-
Mine life
13 years
Workforce
250-300 people (planned)
Overview
The Filo del Sol project is an advanced-stage copper, gold, and silver project operated by Filo Mining Corp. It is located on the border between San Juan Province in Argentina and Region III in Chile. The project is currently in the pre-development phase, with extensive exploration and drilling programs ongoing.
Processing
heap leach to produce copper cathodes and gold-silver doré, involving primary and secondary crushing, heap leaching with acid, solvent extraction, and electrowinning
Equipment
conventional open-pit with truck and shovel/loader operations, contemplated fully autonomous haul truck fleet
Expansion
integrated technical report for a combined project with the nearby Josemaria deposit is scheduled for completion in the first quarter of 2026
Power sources
Grid
Water sources
Groundwater
Companies & ownership
  • Filo Corp.
    TSX:FIL
  • Lundin Mining Corp.
    TSX:LUN
  • BHP Group
    ASX:BHP
Olympic Dam

South Australia, Australia · Underground

Operating
CopperGoldSilver
Commodities, grades and output
YearCommodityAv. GradeOutput
2023Copper-212000 t
2023Gold-186000 oz
Opened
1988-01-01
Mine life
57 years
Workforce
Approximately 3,000 people work at the Olympic Dam site itself, with the workforce divided about equally between permanent employees and contractors.
Production
Production overview - 2023: copper 212000 t, gold 186000 oz.
Processing
Olympic Dam is a fully integrated metallurgical complex that processes ore to final metal products on a single site. The process involves grinding and a flotation circuit to produce a copper concentrate. A hydrometallurgical plant with solvent extraction is used for copper and uranium, followed by a copper smelter and refinery. There is also a recovery circuit for precious metals.
Equipment
The mine utilises a highly mechanised underground mining method, including an automated rail system for ore haulage. Recent trials and additions to the equipment fleet include battery-electric jumbo drills and a new fleet of electric equipment for underground support works, such as the Utimec XL1100ED Agitator and a MF050VC Spraymec. The underground light vehicle fleet consists of around 240 vehicles, with trials of electric Land Cruisers underway. The underground electric rail network is being expanded from 4.85 kilometres to over 6 kilometres, supported by 6 new locomotives.
Expansion
BHP is investing over A$840 million in several projects to enhance productivity. This includes developing an underground access tunnel into the Southern Mine Area, a new backfill system to access previously unreachable ore, expanding ore pass capacity, and installing a new oxygen plant to improve smelter performance. There are also plans for a major smelter and refinery expansion to increase copper production capacity up to 650,000 tonnes per annum. This expansion will also allow for the processing of concentrate from other BHP mines in the region, such as Prominent Hill and Carrapateena. A final investment decision on a major expansion is anticipated in 2028.
Companies & ownership
  • NRW Holdings Limited
    ASX:NWH
  • BHP Group
    ASX:BHP
Filo del Sol

Atacama Region, San Juan Province, Chile, Argentina · Open Pit

Under Development
CopperGoldSilver
Commodities, grades and output
YearCommodityAv. GradeOutput
2023Copper0.39 %66000.00000000001 t
2023Gold0.34 g/t5.225388 t
2023Silver16 g/t287.99831 t
2019Copper0.38 %67000.00000000001 t
2019Gold0.33 g/t4.9454565 t
2019Silver15 g/t269.1905755 t
Mine life
13 years
Autonomous haulage
Yes
Workforce
250-300 people
Overview
Filo del Sol is an advanced-stage, high-sulphidation epithermal copper-gold-silver deposit. The project is located on the border between Argentina and Chile, approximately 140 kilometres south-east of the city of Copiapó. It spans the Atacama Region of northern Chile and the San Juan Province of Argentina.
Production
Production overview - 2023: copper 66000.00000000001 t, gold 5.225388 t, silver 287.99831 t; 2019: copper 67000.00000000001 t, gold 4.9454565 t, silver 269.1905755 t.
Processing
The project will use a heap leach process. Run-of-mine ore will be crushed before being placed on a heap leach pad. Copper will be leached with acid, with the resulting solution undergoing solvent extraction and electrowinning to produce LME-grade copper cathodes. Following copper leaching, the ore will be rinsed and neutralised. This material will then be agglomerated and stacked on a separate heap leach pad for gold and silver recovery using a cyanide solution. Gold and silver will be recovered from the pregnant leach solution via the Merrill-Crowe zinc precipitation process and smelted into doré bars.
Equipment
Mining will be conducted using diesel hydraulic face shovels and front-end loaders on 12-metre benches. Haul trucks will transport ore to the crusher. The project plans to implement an autonomous haulage fleet. The processing plant will feature a primary crusher and a closed-circuit secondary crushing system.
Expansion
Currently in development stage with an updated pre-feasibility study released in February 2023.
Power sources
Grid
Water sources
Groundwater
Companies & ownership
  • Filo Corp.
    TSX:FIL
  • BHP Canada Inc.
  • Lundin Mining Corp.
    TSX:LUN
Bear

British Columbia, Canada · Open Pit

Under Development
MolybdenumCopperGold
Commodities, grades and output
YearCommodityAv. GradeOutput
2004Molybdenum0.059 %-
2004Copper0.27 %-
1996Gold22.16 g/t-
1996Copper6.81 %-
Overview
greenfield exploration project located in British Columbia, Canada. The project is situated in the Skeena Mountains, approximately 150 kilometres north of Smithers.
Companies & ownership
  • Imperial Metals Corporation
    TSX:III
Catface

British Columbia, Canada · Open Pit

Under Development
CopperMolybdenumSilver
Overview
Catface is an undeveloped mining project owned by Imperial Metals Corporation, located on Catface Mountain, Vancouver Island, British Columbia, Canada. It is a copper-molybdenum porphyry deposit at an exploration and development stage.
Production
approximately 7 million tonnes of ore per year
Processing
conventional crushing, grinding, and flotation technology
Companies & ownership
  • Imperial Metals Corporation
    TSX:III
Gonneville Project

Western Australia, Australia · Open Pit

Feasibility
PalladiumPlatinumGoldNickelCopperCobalt
Commodities, grades and output
YearCommodityAv. GradeOutput
2024Nickel0.15 %960 kt
2024Copper0.083 %540 kt
2024Cobalt0.015 %96 kt
2023Nickel0.16 %-
2023Copper0.09 %-
2023Cobalt0.015 %-
2022Nickel0.16 %-
2022Copper0.1 %-
2022Cobalt0.015 %-
2021Nickel0.16 %530 kt
2021Copper0.1 %330 kt
2021Cobalt0.016 %53 kt
Opened
2029-01-01
End year
2052
Mine life
23 years
Workforce
Approximately 1,200 jobs during peak construction and 500 jobs per year during operations.
Overview
The Gonneville Project, operated by Chalice Mining Limited, is a significant critical minerals development located on Chalice-owned farmland about 70km north-east of Perth, Western Australia. Discovered in early 2020, it is considered the largest undeveloped palladium-nickel-copper project in the Western world. The project has been awarded 'Strategic Project' status by the Western Australian Government and 'Major Project Status' by the Australian Federal Government. A Pre-Feasibility Study (PFS) completed in December 2025 outlines a two-stage, open-pit mine. The project is currently in the feasibility and permitting stage, with a final investment decision targeted for the first half of 2028 and construction potentially starting in 2028-29. Proposed mining operations are expected to begin in 2029. The project is notable for its suite of critical minerals, including palladium, platinum, nickel, copper, and cobalt, which are essential for decarbonisation technologies.
Production
Production overview - 2024: nickel 960 kt, copper 540 kt, cobalt 96 kt.
Processing
The processing will involve a conventional flotation plant. A simplified flowsheet will produce two smelter-grade concentrates: a copper-PGE-gold concentrate and a nickel-cobalt-PGE concentrate, as well as an iron concentrate and a palladium-platinum-gold doré.
Equipment
small, track-mounted diamond and air-core drill rigs, conventional flotation plant
Expansion
A Pre-Feasibility Study (PFS) completed in December 2025 outlines a two-stage, open-pit mine.
Companies & ownership
  • Chalice Mining Limited
    ASX:CHN · OTC:CGMLF
Huckleberry Mine

British Columbia, Canada · Open Pit

Care And Maintenance
CopperGoldSilver
Commodities, grades and output
YearCommodityAv. GradeOutput
2015Copper-43000000 lbs
2015Gold-3500 oz
2015Silver-206000 oz
Opened
1997-01-01
Workforce
260 employees (prior to 2016 suspension)
Overview
The Huckleberry Mine is an open pit copper mine located 88 kilometres southwest of Houston in west-central British Columbia, Canada. It is wholly owned by Imperial Metals Corporation. The mine commenced operations in 1997 and was placed on care and maintenance in August 2016 due to low copper prices.
Production
Production overview - 2015: copper 43000000 lbs, gold 3500 oz, silver 206000 oz.
Processing
froth flotation process to produce separate copper and molybdenum concentrates
Equipment
primary crusher, semi-autogenous (SAG) mill, ball mills
Expansion
continued exploration activities on the property; a diamond drilling program in 2025 intersected copper, molybdenum, silver, and gold mineralisation; additional drilling is being considered for 2026; plans in 2026 to investigate and update the tailings facility design
Companies & ownership
  • Imperial Metals Corporation
    TSX:III
Red Chris Mine

British Columbia, Canada · Open Pit

Operating
CopperGold
Commodities, grades and output
YearCommodityAv. GradeOutput
2025Copper0.583 %93101213 lbs
2025Gold0.529 g/t92429 oz
2024Copper-85320618 lbs
2024Gold-59811 oz
2023Copper-57051467 lbs
2023Gold-46046 oz
2022Copper-67600000 lbs
2022Gold-63658 oz
2020Copper-88300000 lbs
2020Gold-73787 oz
Opened
2015-01-01
Mine life
28 years
Workforce
350
Production
Production overview - 2025: copper 93101213 lbs, gold 92429 oz; 2024: copper 85320618 lbs, gold 59811 oz.
Processing
upgrades to the existing processing plant to treat underground ore at a throughput rate of 13.6 million tonnes per annum.
Expansion
Newmont is proposing to transition the existing mine from open-pit mining to an underground method called 'block-caving'. A feasibility study for the block cave expansion is advancing, with completion expected in the second half of 2026. The proposed change to block cave mining is expected to extend the mine's life by approximately 15 years. A pre-feasibility study included upgrades to the existing processing plant to treat underground ore at a throughput rate of 13.6 million tonnes per annum.
Companies & ownership
  • Newmont Corporation
    NYSE:NEM
  • Imperial Metals Corporation
    TSX:III
Mount Polley Mine

British Columbia, Canada · Open Pit

Operating
CopperGold
Commodities, grades and output
YearCommodityAv. GradeOutput
2025Copper0.255 %30715000 lbs
2025Gold0.254 g/t37555 oz
2024Copper0.292 %35700000 lbs
2024Gold0.263 g/t39108 oz
2023Copper0.287 %30100000 lbs
2023Gold0.311 g/t41834 oz
End year
2033
Production
Production overview - 2025: copper 30715000 lbs, gold 37555 oz; 2024: copper 35700000 lbs, gold 39108 oz.
Expansion
In August 2025, a permit amendment was approved to allow for the expansion of operations at the Mount Polley mine. This includes deepening the existing Springer pit and enlarging rock-disposal areas.
Companies & ownership
  • Imperial Metals Corporation
    TSX:III
Azegour mine

Marrakech-Safi, Morocco · Underground

Historic Mine
CopperGoldSilver
Companies & ownership
  • Aya Gold & Silver Inc.
    TSX:AYA
Porter Idaho Project

British Columbia, Canada · Underground

Historic Mine
SilverGoldLeadZincCopper
Companies & ownership
  • Skeena Resources Limited
    TSX:SKE · NYSE:SKE
  • StrikePoint Gold Inc.
Spectrum-GJ Project

British Columbia, Canada · Open Pit

Under Development
CopperGoldSilver
Mine life
25 years
Overview
The Spectrum-GJ Project is a copper and gold project located in the Golden Triangle region of north-west British Columbia, Canada. It comprises two main deposits, the Donnelly Deposit (GJ) and the Spectrum Central Zone. The project is at a development stage with a Preliminary Economic Assessment (PEA) completed in 2017.
Processing
conventional copper/gold porphyry processing plant with a flotation unit, with potential for a carbon-in-leach (CIL) plant in the sixth year
Companies & ownership
  • Skeena Resources Limited
    TSX:SKE · NYSE:SKE
  • Newcrest Mining Limited
    ASX:NCM
Clermont Copper-Gold Project

Central Queensland, Australia · Open Pit

Under Development
Copper
Commodities, grades and output
YearCommodityAv. GradeOutput
2006Copper2.69 %-
Companies & ownership
  • Metallica Minerals Limited
Thunder Zone

Saskatchewan, Canada · Underground

Under Development
CopperZincSilverGold
Commodities, grades and output
YearCommodityAv. GradeOutput
2026Copper0.08 %-
2026Zinc4.5 %-
2026Silver41.6 g/t-
2026Gold0.25 g/t-
Workforce
approximately 450 people on site (McIlvenna Bay project)
Overview
The Thunder Zone is an exploration target within Foran Mining's 100%-owned McIlvenna Bay Project, located approximately five kilometres southeast of the main McIlvenna Bay Deposit. A 2026 winter drilling program is underway to accelerate growth and unlock district-scale potential.
Expansion
The Thunder Zone is a regional exploration target within Foran Mining's 100%-owned McIlvenna Bay Project. It is located approximately five kilometres southeast of the main McIlvenna Bay Deposit. A 2026 winter drilling program at the Thunder Zone included up to 3,000 metres of drilling to accelerate growth and unlock district-scale potential. Results from drill hole BA-26-84 extended the mineralisation strike by 100 metres to the northwest, defining a strike length of about 300 metres. The mineralisation remains open along strike and at depth. The broader McIlvenna Bay project is approximately 88% complete and on schedule for commercial production in mid-2026. An 85-kilometre, 110 kV transmission line connecting the McIlvenna Bay Project to the electrical grid was successfully energised.
Power sources
Grid
Companies & ownership
  • Foran Mining Corporation
    TSX:FOM
Hanson Lake Property

Saskatchewan, Canada · Underground

Under Development
CopperZincGoldSilver
Overview
The Hanson Lake Property is a 4,510-hectare claim in east-central Saskatchewan, Canada, 65 km west-southwest of Flin Flon, Manitoba. It is located 5 km northwest of Foran's McIlvenna Bay Deposit, along the Tesla Trend, and is being explored for copper, zinc, gold, and silver mineralization.
Processing
Foran's strategy for the broader Hanson Lake District involves the potential for a central processing facility to service multiple deposits.
Expansion
Foran Mining Corporation is currently in the exploration phase for the Hanson Lake Property. The company has a five-year period to explore the property with no minimum spending requirement before deciding on the acquisition. Planned exploration activities include ground-based electromagnetic surveys to identify potential extensions of mineralization from the Tesla Zone.
Companies & ownership
  • Foran Mining Corporation
    TSX:FOM
Denare West Property

Saskatchewan, Canada · Underground

Under Development
CopperZincGoldSilver
Overview
The Denare West Property is an exploration-stage project in east-central Saskatchewan, Canada, covering 21,066 hectares. It is prospective for volcanogenic massive sulphide (VMS) deposits containing copper, zinc, gold, and silver. Foran Mining Corporation has an option to acquire up to a 100% interest, and is conducting airborne surveys to prioritize exploration targets.
Companies & ownership
  • Foran Mining Corporation
    TSX:FOM
Bigstone Deposit

Saskatchewan, Canada · Underground

Under Development
CopperZincGoldSilver
Commodities, grades and output
YearCommodityAv. GradeOutput
2020Copper1.83 %95000000 lbs
2020Zinc0.98 %51000000 lbs
2020Gold0.28 g/t22000 oz
2020Silver10.82 g/t820000 oz
Overview
The Bigstone deposit is a satellite deposit located 25 km west of Foran's McIlvenna Bay deposit, intended to provide feed for a central mill. Mineralisation is found 100-600m below surface and remains open at depth. An initial resource estimate was announced in December 2020.
Production
Production overview - 2020: copper 95000000 lbs, zinc 51000000 lbs, gold 22000 oz, silver 820000 oz.
Companies & ownership
  • Foran Mining Corporation
    TSX:FOM
Tesla Zone

Saskatchewan, Canada · Underground

Under Development
CopperZincSilverGold
Commodities, grades and output
YearCommodityAv. GradeOutput
2025Copper0.85 %-
2025Zinc9 %-
2025Silver50.1 g/t-
2025Gold0.42 g/t-
2024Gold0.22 g/t-
2024Silver47.9 g/t-
2024Zinc10.53 %-
2024Copper0.67 %-
Opened
2022-01-01
Overview
The Tesla Zone is a major copper-zinc-gold-silver discovery, 100%-owned by Foran Mining Corporation, located adjacent to and north of the McIlvenna Bay deposit in east-central Saskatchewan, Canada. Discovered in 2022, it is currently in the exploration phase with ongoing drilling to define a maiden resource, expected in H2 2026. The zone consists of multiple mineralised lenses and remains open for expansion.
Expansion
Ongoing expansion and infill drilling to define a maiden resource. Advancing the McIlvenna Bay project towards commercial production by mid-2026. Energisation of a new 85-kilometre transmission line connecting to a hydroelectric facility completed in March 2026.
Power sources
HydroelectricGrid
Companies & ownership
  • Foran Mining Corporation
    TSX:FOM
Page 11 of 30 (705 total)